Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 01:55 19 Apr 2024
- Arrest over alleged Russia plot to kill Zelensky
- Dubai airport delays persist after UAE storm
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
19th Apr (1938)
Foundation, Beatties of London (link)

Train RunningCancelled
19/04/24 04:45 Redhill to Gatwick Airport
19/04/24 05:11 Gatwick Airport to Reading
19/04/24 06:04 Gloucester to Worcester Foregate Street
Short Run
19/04/24 05:33 Bedwyn to London Paddington
19/04/24 06:00 Bedwyn to London Paddington
19/04/24 06:52 Worcester Foregate Street to Bristol Temple Meads
19/04/24 07:13 Great Malvern to London Paddington
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 19, 2024, 02:09:40 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[176] Rail delay compensation payments hit £100 million
[71] Signage - not making it easy ...
[15] IETs at Melksham
[13] Ferry just cancelled - train tickets will be useless - advice?
[12] From Melksham to Tallinn (and back round The Baltic) by train
[12] New station at Ashley Down, Bristol
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2]
  Print  
Author Topic: Heritage lines as public transport  (Read 4141 times)
grahame
Administrator
Hero Member
*****
Posts: 40783



View Profile WWW Email
« Reply #15 on: November 08, 2021, 17:18:58 »

It really would be a bit of a cinch to operate a very comprehensive mixed timetable if the section between Minehead and Dunster was double tracked, and the crossing loops re-instated at Kentsford and Leigh Wood.  The problem as I see it would be the operation of signalboxes.

Let me add some amateur thoughts.  As the track is single through Kentsford and Leigh Wood at present, any or either loop there would not need to be "heritage".    During none-heritage operation, intermediate heritage boxes switched out, signals left pulled off in both directions, and a single platform in use. Leaving, purely, the issue of the level crossing operation to be overcome.  Williton's Station Road is only about 40 metres to the north of the A39 bridge BUT that may be an issue for access by pedestians and cycles if it was to be shut permanently across the road.   Blue Anchor much more of a problem if you want to retain heritage - a very long way round if you close the crossing, and not practical to build a new half barrier crossing 100 yards or so to the west.  Don't see National Rail gates operated by train manager finding much favour, nor "Stop and Proceed" which in any case would destroy the gates.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #16 on: November 08, 2021, 18:21:36 »



...Could we not switch out the signalboxes in favour of a panel box for the winter service, then switch them back in on the Bishop's Lydeard-Minehead section for the summer daytime heritage service? That way - in theory at least - everyone's a winner.

The problem is that the boxes at Minehead, Blue Anchor and Williton control level crossings, and the one at Bishops Lydeard is the fringe to Exeter Panel.

Switching out is an attractive idea, but I can't see how it could be achieved.  Unless the whole line goes onto some kind of remote, centrally controlled signalling with the "Disneyfication" of what's already there to create the illusion that it's doing something operational

The strength of heritage railways is the corps of volunteers that operate the railway because they enjoy the bygone era of the railway, "Disneyfication" to run a public service would destroy a heritage railway.  Most of the true cost of operating and maintaining a heritage railway is hidden by (the hugely valued) volunteer effort to run a public service, that is a Professional railway has a high cost.

I cannot see a blended heritage and public service working very well I do not even think the RH&DR operate a 'public' service any longer
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #17 on: November 08, 2021, 18:44:56 »



...Could we not switch out the signalboxes in favour of a panel box for the winter service, then switch them back in on the Bishop's Lydeard-Minehead section for the summer daytime heritage service? That way - in theory at least - everyone's a winner.

The problem is that the boxes at Minehead, Blue Anchor and Williton control level crossings, and the one at Bishops Lydeard is the fringe to Exeter Panel.

Switching out is an attractive idea, but I can't see how it could be achieved.  Unless the whole line goes onto some kind of remote, centrally controlled signalling with the "Disneyfication" of what's already there to create the illusion that it's doing something operational

The strength of heritage railways is the corps of volunteers that operate the railway because they enjoy the bygone era of the railway, "Disneyfication" to run a public service would destroy a heritage railway.  Most of the true cost of operating and maintaining a heritage railway is hidden by (the hugely valued) volunteer effort to run a public service, that is a Professional railway has a high cost.

I cannot see a blended heritage and public service working very well I do not even think the RH&DR operate a 'public' service any longer

Fair enough. Stick-it-on-the-too-difficult-pile-until-the-WSR-inevitably-goes-bust it is then.
Logged

Vous devez être impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
Witham Bobby
Transport Scholar
Hero Member
******
Posts: 564



View Profile
« Reply #18 on: November 09, 2021, 11:15:16 »


Let me add some amateur thoughts.  As the track is single through Kentsford and Leigh Wood at present, any or either loop there would not need to be "heritage".    During none-heritage operation, intermediate heritage boxes switched out, signals left pulled off in both directions, and a single platform in use. Leaving, purely, the issue of the level crossing operation to be overcome.  Williton's Station Road is only about 40 metres to the north of the A39 bridge BUT that may be an issue for access by pedestians and cycles if it was to be shut permanently across the road.   Blue Anchor much more of a problem if you want to retain heritage - a very long way round if you close the crossing, and not practical to build a new half barrier crossing 100 yards or so to the west.  Don't see National Rail gates operated by train manager finding much favour, nor "Stop and Proceed" which in any case would destroy the gates.

I don't think there's much "amateur" about these thoughts

Plans existed for the remote operation of the loops at Kentsford and Leigh Wood 40+ years ago.  If they've not rotted, I'm sure they can be dusted off.  Either using motor-worked semaphores or searchlight signals wouldn't be objectionable.  Either long/short section token working or do away with tokens in favour of a more modern single-line control, which would perhaps be a bit more challenging for heritage aficionados.  very do-able, given the will and the lolly.

When we took-over the line and in the process of setting up the original LR(T)O, in 1974 or thereabouts, the non public-road status of the level crossing at Williton got overlooked somehow.  There were signs up at the crossing informing of this status, but the very clever people in charge ignored history.  BR (British Rail(ways)) (and presumably it's predecessors) had chained-up the gates one day per year to prevent a right of way coming into being.  By the time we got to the actual re-opening at Williton in August 1976, it was too late.  No correction of the oversight could be countenanced by HMRI (Her Majesty's Railway Inspectorate).  The gates would normally be left open for road traffic and closed only for passage of trains.  The gates had, in big-railway days been left closed across the road, for road users to operate at times when they were unlocked from the 'box.  Closing them for a train became the responsibility of the railway.  Williton might need to be open as a cossing loop in even a sparse winter service, though

Blue Anchor is not easy to "solve".  The LC (Level Crossing) is not well situated from a highways point of view, approached from the northern side by a sharp left blind bend in the road.  I don't think here's much chance of any type of remotely supervised (other than perhaps CCTV (Closed Circuit Tele Vision)) crossing being permitted here.  "Upgrading" to lights and barriers would destroy the heritage ambience.  As would stop boards.

Plans existed back in the mid 1970s too for the switching out of Minehead 'box and auto operation of arriving and departing trains.  That was before Seaward Way LC was a thing.  Now that the LC is CCTV supervised, perhaps there's potential fo this to be controlled from elsewhere - Blue Anchor, perhaps?



 
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5408



View Profile
« Reply #19 on: June 08, 2022, 04:12:07 »

A new working group has been set up to promote through running between Bishops Lydeard on the WSR and Taunton.
See news report on May 24 on the WSR news website. http://www.wsr.org.uk/news.htm

Sounds like good news, but we have had a number of studies, working groups, reports, committees, consultations and the like over the years, but no regular through service has yet resulted.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
grahame
Administrator
Hero Member
*****
Posts: 40783



View Profile WWW Email
« Reply #20 on: June 08, 2022, 06:20:24 »

A new working group has been set up to promote through running between Bishops Lydeard on the WSR and Taunton.
See news report on May 24 on the WSR news website. http://www.wsr.org.uk/news.htm

Sounds like good news, but we have had a number of studies, working groups, reports, committees, consultations and the like over the years, but no regular through service has yet resulted.

I recall four stages to our campaign for change here in Wiltshire
1. Make people who can do something aware that something needs to be done
2. Have them work our properly what that "something" really is
3. Get "something" implemented
4. Work, work work to ensure it works and carries on, progressively tuned in the light of time and experience

If this study is phase 2, good news.  There can, sadly, need to be multiple passes at phase 2 ... with 2a being to work out how it can be implemented - financially, with due regard to those it will effect consequencially, and how you get from where you are now to that implemented "something".
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
RichardB
Hero Member
*****
Posts: 959


View Profile
« Reply #21 on: June 08, 2022, 09:38:39 »

A new working group has been set up to promote through running between Bishops Lydeard on the WSR and Taunton.
See news report on May 24 on the WSR news website. http://www.wsr.org.uk/news.htm

Sounds like good news, but we have had a number of studies, working groups, reports, committees, consultations and the like over the years, but no regular through service has yet resulted.

Looking at the news report, they have the right people involved, Matt Barnes of GWR (Great Western Railway) in particular.   
Logged
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #22 on: June 08, 2022, 21:55:21 »

I think that the real problem is "through running", as a regular service (other than a visiting excursion) requires a full, modern NR» (Network Rail - home page)/TOC (Train Operating Company) compliant train etc.

I think that a better route to public service would be to provide an independent  shuttle connection to a bay platform from the heritage + public service line, at an NR interchange station. This is often not easy as track beds, if they ever existed may be obstructed etc. However the alternative is very expensive signalling and track alterations as well as rolling stock procurement and adaptation to main line operating standards, after which paths have to be identified and significant extra annual operating subsidies allocated.

It may have been cheaper to build (and operate) a short, new line into the old south bay (now car parking) at Wareham for the Swanage services as well as slew/clear the track bed from Norton Fitzwarren to Taunton north bay (platform 7?). The arrangements at Cholsey, Smallbrook and Keighley etc spring to mind.

OTC
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page