Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 12:55 29 Mar 2024
* Delays at Dover as millions begin Easter getaway
- Attempted murder charge after man stabbed on train
- KFC Nigeria sorry after disabled diner refused service
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
29th Mar (1913)
Foundation of National Union or Railwaymen (*)

Train RunningCancelled
12:30 London Paddington to Weston-Super-Mare
12:52 Bedwyn to Newbury
13:15 Swindon to Westbury
13:15 London Paddington to Cardiff Central
13:21 Newbury to Bedwyn
13:48 Bedwyn to Newbury
14:12 Newbury to Bedwyn
14:19 Westbury to Swindon
14:57 Bedwyn to Newbury
15:14 Swindon to Westbury
15:22 Newbury to Bedwyn
15:28 Weston-Super-Mare to London Paddington
15:50 Bedwyn to Newbury
15:54 Cardiff Central to London Paddington
16:15 Newbury to Bedwyn
16:23 Westbury to Swindon
16:55 Bedwyn to Newbury
17:36 Swindon to Westbury
18:37 Westbury to Swindon
20:13 Swindon to Westbury
21:16 Westbury to Swindon
22:30 Swindon to Westbury
Short Run
09:37 London Paddington to Paignton
10:35 London Paddington to Exeter St Davids
10:55 Paignton to London Paddington
12:35 London Paddington to Exeter St Davids
13:10 Gloucester to Weymouth
13:42 Exeter St Davids to London Paddington
13:55 Paignton to London Paddington
14:36 London Paddington to Paignton
15:42 Exeter St Davids to London Paddington
16:35 London Paddington to Plymouth
16:50 Plymouth to London Paddington
17:03 London Paddington to Penzance
17:36 London Paddington to Plymouth
18:03 London Paddington to Penzance
18:36 London Paddington to Plymouth
19:04 Paignton to London Paddington
20:03 London Paddington to Plymouth
21:04 London Paddington to Plymouth
Delayed
08:03 London Paddington to Penzance
08:15 Penzance to London Paddington
09:10 Penzance to London Paddington
10:04 London Paddington to Penzance
10:20 Penzance to London Paddington
11:03 London Paddington to Plymouth
12:03 London Paddington to Penzance
12:15 Penzance to London Paddington
13:03 London Paddington to Plymouth
13:15 Plymouth to London Paddington
14:03 London Paddington to Penzance
14:15 London Paddington to Cardiff Central
14:15 Penzance to London Paddington
15:03 London Paddington to Penzance
etc
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 29, 2024, 13:14:06 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[153] 2024 - Service update and amendment log, Swindon <-> Westbury...
[97] Infrastructure problems in Thames Valley causing disruption el...
[53] Travel for free on the m2 metrobus - Bristol - 4,5,6 April 202...
[41] would you like your own LIVE train station departure board?
[38] West Wiltshire Bus Changes April 2024
[37] Reversing Beeching - bring heritage and freight lines into the...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 3 [4] 5 6 ... 8
  Print  
Author Topic: Vivarail chosen for fast charging trial on the Greenford branch  (Read 13768 times)
Electric train
Transport Scholar
Hero Member
******
Posts: 4356


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #45 on: March 11, 2022, 06:42:23 »

I doubt that charging from empty in three minutes would be possible.
I presume that they mean replacing the amount of charge used in the previous journey, which is still impressive.

Based on tests I have been involved in at IPH Berlin ( https://www.cesi.it/about-us/overview/iph-gmbh/ ) testing third rail shoe contact current capacity when static.   Once you get over about 4kA (4000A) at 750V DC (Direct Current) arcing and burning starts which is not a problem for a train if it starts to move as the contact surfaces scrub.  To get over the 4kA DC limit the downward pressure of the shoe gear needs to be increased but you get to the point of the mechanical limit of the force required.

Of course the transfer may be AC not sure the ORR» (Office of Rail and Road formerly Office of Rail Regulation - about) would be keen on an RMS Voltage above 750V AC.  Another option could be high frequency AC but then there are RFI issues and the risk of shock from exposed conductors.

It will be interesting to see what the charging system will be.
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
broadgage
Transport Scholar
Hero Member
******
Posts: 5398



View Profile
« Reply #46 on: March 12, 2022, 15:53:08 »

For fast charging, perhaps a short length of 25 KV overhead might be simpler.
Out of reach, so can be left live all the time.
Much lower current due to the higher voltage.
Can be of a cheap and simple design as not intended to be used at significant speed.
Multiple pantographs are possible, in order to pick up enough current.

Another advantage is that if needs change, the trains can re deployed to other routes that are partly electrified.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
IndustryInsider
Data Manager
Hero Member
******
Posts: 10096


View Profile
« Reply #47 on: March 12, 2022, 15:59:34 »

Won’t they be using their modified D78 stock?  In other words no pantograph fitted, but fitted with DC (Direct Current) shoe gear?
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 12334


View Profile Email
« Reply #48 on: March 12, 2022, 17:45:33 »

I understand thst is so
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #49 on: March 12, 2022, 20:14:49 »

I understand thst is so

Of course it is - as announced by Vivarail! The relevant story on their Fast Charge system is hard to find, for want of links, and some the other details are elsewhere. But it does include:
Quote
With assistance from the UK (United Kingdom)’s Department for Transport and Network Rail, Fast Charge’s trial is due to start in early 2022 on the West Ealing-Greenford line in London, after that it will be fully approved for use on the network for all types of battery train.

According to Vivarail, the Fast Charge application is quite simple. Lengths of conductor rail sit between the running rails. Beside the track is a container full of batteries (the company aims to use second-hand batteries in power storage banks, possibly from the automotive industry). All the train has to do is pull to a stop in its normal place. At that point, and without any need for the driver to do anything, a high current shoegear connects to the conductor rail.

So they are trying to prove this Fast Charge approach and the hardware. They reckon the buffer battery at trackside is worthwhile to avoid a high-power mains feed. The fast transfer of energy from it to the onboard batteries is well above what a small train like this would normally need, by AC or DC (Direct Current). But clearly adding AC would cost a lot at any power level, while at DC the current goes straight into the batteries. The electronics to control it and match voltages can be offboard, apart from the cells' charge controllers that are built into the batteries.

They talk about current levels of 1 kA or a low multiple of that, and that agrees with what ET said above. They also mention ceramic shoes to cope with the heat, and I don't suppose they will use standard conductor rails either for the same reason.

So it's all been planned out and, apparently, ready to go ... soon. Of course getting it all up and running on schedule is the hard bit, and the suppliers of both new and rebuilt trains have now got a truly lousy reputation for that.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #50 on: March 15, 2022, 09:54:51 »

There's now a youtube video of a presentation by Vivarail on Fast Charge, recorded at a PWI* on-line. It concentrates on the safety case, perhaps because of the audience, which leads to the impression it will have a lot of failures due to false alarms. But I can see that for their programme to do the Greenford trial, getting ORR» (Office of Rail and Road formerly Office of Rail Regulation - about) and NR» (Network Rail - home page) approvals was probably the biggest activity and highest identified risk.

The numbers are not quite the ones I got from their previous presentations: now 300 kWh of batteries per DM (and 1 MWh per Trackside Charge Unit). The transfer is of 1 kA at 800 V, and is expected to replace 30-50 kWh per train used in a 5-mile round trip in three minutes. So the control system design has dictated by the need to charge automatically for as long as possible during the turn-round, and without the driver stopping to do anything special.

One those numbers there is easily enough capacity to cope, but then there's no mention of "losses" or "efficiency". You just can't shovel all those kWh around at that rate without a lot of them escaping!

*Permanent Way Institution
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10096


View Profile
« Reply #51 on: March 15, 2022, 10:40:38 »

So the control system design has dictated by the need to charge automatically for as long as possible during the turn-round, and without the driver stopping to do anything special.

That's a relief.  I wouldn't want to be the driver who had his train cancelled because he forgot to plug it in the the charger...a headline makers dream!
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Electric train
Transport Scholar
Hero Member
******
Posts: 4356


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #52 on: March 16, 2022, 09:26:26 »

They talk about current levels of 1 kA or a low multiple of that, and that agrees with what ET said above. They also mention ceramic shoes to cope with the heat, and I don't suppose they will use standard conductor rails either for the same reason.

The use of carbon ceramic make sense especially as it is static current collection also the shoe look larger than normal travelling shoes.  The key as always with electrical connections the greater the current the larger the surface area required the surface area can be reduced by contact pressure, there is a limit of when you start to lift the train  Grin

So it's all been planned out and, apparently, ready to go ... soon. Of course getting it all up and running on schedule is the hard bit, and the suppliers of both new and rebuilt trains have now got a truly lousy reputation for that.

This has been in discussion with RSSB (Rail Safety and Standards Board), ORR» (Office of Rail and Road formerly Office of Rail Regulation - about) and NR» (Network Rail - home page) for at least 5 years
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
grahame
Administrator
Hero Member
*****
Posts: 40692



View Profile WWW Email
« Reply #53 on: July 05, 2022, 16:49:19 »

Any news on when the trial start?  Trains in public service?
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #54 on: July 05, 2022, 17:45:06 »

Any news on when the trial start?  Trains in public service?

"Later this year", according to Vivarail. Were you expecting anything more specific?
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #55 on: July 16, 2022, 13:16:41 »

Eversholt have announced that they are getting Vivarail to add some batteries to their "Renatus" modernised Class 321 EMUs (Electric Multiple Unit). From their news page:
Quote
Eversholt Rail and Vivarail to develop Class 321 BEMU

Eversholt Rail and Vivarail have signed an agreement aimed at developing battery power – and range extension – to the Class 321 ‘Renatus’ fleet.

The 30 unit ‘Renatus’ fleet is a product of £65m investment in AC traction, air conditioning and upgraded interior.  Completed in 2019, it provides a high-quality passenger experience, proven reliability in intensive operations and is widely compatible on the UK (United Kingdom) network. This fleet is currently operating on the Greater Anglia network until the introduction of their new trains is completed.

Eversholt Rail and Vivarail are committed to supporting the UK Government’s ambition to decarbonise its rail sector by 2050, and the Scottish Government’s objective of doing so by 2035. This proven and reliable fleet is an excellent fit in terms of characteristics, fleet size and availability for conversion to a Battery Electric Multiple Unit (BEMU). Vivarail, as the designers and manufacturers of the UK’s only battery and hybrid trains currently in passenger service are well positioned to progress this development.

We will be working together to develop a design to integrate battery technology to provide between 20 to 30 miles of self-propulsion. Enabling the fleet to operate on non-electrified or partly electrified routes would offer the opportunity to increase the range of modern, low-carbon options to accommodate passenger demand; to enable fleet cascades; to improve the passenger experience; and to bring air quality and decarbonisation benefits to local areas.

Through discussion with train operators, regional sponsors and DfT» (Department for Transport - about) a number of opportunities have been identified across the network. The technical and safety case development will continue throughout 2022 and in parallel Eversholt Rail and Vivarail will be engaging with the market to assess the viability of potential routes. This will inform the decision on further investment in the fleet.

Since this is the same traction package as on the 455s, it must use 750V as its intermediate DC (Direct Current) voltage. So the batteries and linking electronics can be the same as on the 230s, or a bit beefed up.

What applications do they have their eye on? Much the same as for the ones based on the D78s, I guess, but offering a real train?
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #56 on: July 16, 2022, 13:38:42 »

Since this is the same traction package as on the 455s, it must use 750V as its intermediate DC (Direct Current) voltage. So the batteries and linking electronics can be the same as on the 230s, or a bit beefed up.

What applications do they have their eye on? Much the same as for the ones based on the D78s, I guess, but offering a real train?

One thing that's implied, but not mentioned at all in that publicity, is that presumably this involves charging from on-board traction power. That would be a new bit of Vivarail's kit of parts, but one you could have guessed they'd be working on. It leaves open the question of whether shore power or a charger would be needed at the far end of the line.
Logged
bobm
Administrator
Hero Member
*****
Posts: 9810



View Profile
« Reply #57 on: July 16, 2022, 14:15:21 »

Don’t know if it’s connected but the Greenford Branch is closed over the August Bank Holiday weekend and the first two Saturdays in September.  (There are no Sunday services anyway).
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12334


View Profile Email
« Reply #58 on: February 17, 2023, 10:46:54 »

Bringing this thread back to life owing to new developments....

From Today's Railways, on twitter

Quote
The West Ealing-Greenford fast-charge trial is to go ahead after @GWRHelp agreed to buy “intellectual property, rolling stock & equipment” from the in-administration Vivarail. 230001 thus transfers to GWR (Great Western Railway) ownership. GWR has also employed 9 former Vivarail staff to support the trials

Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5398



View Profile
« Reply #59 on: February 17, 2023, 12:05:53 »

Glad to hear that this project is still going ahead. Battery power is IMHO (in my humble opinion) the future for lines that cant be electrified affordably.

I hope that the new trains enjoy greater success than some other new types.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 3 [4] 5 6 ... 8
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page