Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 13:15 20 Apr 2024
- Three men killed in retail park car crash named
* Some Wales roads to revert to 30mph after backlash
- Three men killed in retail park car crash identified
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningCancelled
13:07 Salisbury to Bristol Temple Meads
18:52 London Paddington to Great Malvern
19:19 Carmarthen to Swansea
Short Run
10:03 London Paddington to Penzance
11:09 Gloucester to Weymouth
11:24 Reading to Gatwick Airport
12:00 Bristol Temple Meads to London Paddington
14:48 London Paddington to Carmarthen
Delayed
08:15 Penzance to London Paddington
09:30 Weymouth to Gloucester
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2024, 13:26:41 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[279] Somerset and Dorset Devonshire Tunnel flood
[220] Rail to refuge / Travel to refuge
[109] On reservations, fees and supplements - Interrail
[37] Rail delay compensation payments hit £100 million
[33] Problems with the Night Riviera sleeper - December 2014 onward...
[16] Difficult to argue with e-bike/scooter rules?
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: OTD - 10th July 2019 - First electric trains into London Euston  (Read 585 times)
stuving
Transport Scholar
Hero Member
******
Posts: 7163


View Profile
« on: July 10, 2022, 00:46:55 »

According to Friday's Times, "on Monday [10th July 1922] electric trains will for the first time carry passengers into Euston". The electric lines to Watford were planned and started before the war, and Bakerloo and Broad Street trains started running in 1915 and got to Watford by April 1917.

Connecting Euston had to wait for the rebuilding of Camden Junction to provide grade separation (as it wasn't then called). "The changes have entailed moving every line and siding at Chalk Farm [as it was then called] except the main up line, and that has been raised. The old Chalk Farm [later called Primrose Hill] main line station has been abolished, but the North London station remains [it closed in 1992]."

The article notes that during the "rush" hours, there would be twelve trains per hour each way between Watford and Willesden, split three ways further south/east. "At the same time the steam service between Watford and Euston will be retained, and indeed improved." I guess that's the main line service to past Watford, but it still sounds unlikely.
Logged
Ralph Ayres
Transport Scholar
Hero Member
******
Posts: 337


View Profile
« Reply #1 on: July 10, 2022, 16:10:34 »

My July 1922 Bradshaw's timetable has, between 7 and 8am, 2 trains to Euston, 5 to Broad Street and 4 Bakerloo, all calling at Watford High Street so all running on the "DC (Direct Current)" lines in question rather than long-distance trains on other tracks.  If I moved the one hour window it's likely I'd get 12 trains so the claim perhaps surprisingly seems accurate; Euston doesn't come out of it too well but does have other faster options on the main line.  Just 4 trains in the same period now, all to Euston.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7163


View Profile
« Reply #2 on: July 10, 2022, 19:45:59 »

My July 1922 Bradshaw's timetable has, between 7 and 8am, 2 trains to Euston, 5 to Broad Street and 4 Bakerloo, all calling at Watford High Street so all running on the "DC (Direct Current)" lines in question rather than long-distance trains on other tracks.  If I moved the one hour window it's likely I'd get 12 trains so the claim perhaps surprisingly seems accurate; Euston doesn't come out of it too well but does have other faster options on the main line.  Just 4 trains in the same period now, all to Euston.

I wasn't questioning running 12 tph on the DC lines; I'm sure they could have managed twice that. It was the idea that the number of services from Watford on the fast and slow lines would be increased at the same time that sounded odd.

But it now occurs to me that, even if only two slow line paths per hour were newly available into Euston, the benefit of the earlier non-Euston services would not have been taken yet. For one thing, they were rebuilding Chalk Farm Junction. So it was only be after the grade separation was finished that extra capacity on the fast and slow lines became usable into Euston. And I guess almost everything stopped at Watford.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #3 on: July 10, 2022, 22:25:02 »

My July 1922 Bradshaw's timetable has, between 7 and 8am, 2 trains to Euston, 5 to Broad Street and 4 Bakerloo, all calling at Watford High Street so all running on the "DC (Direct Current)" lines in question rather than long-distance trains on other tracks.  If I moved the one hour window it's likely I'd get 12 trains so the claim perhaps surprisingly seems accurate; Euston doesn't come out of it too well but does have other faster options on the main line.  Just 4 trains in the same period now, all to Euston.

I wasn't questioning running 12 tph on the DC lines; I'm sure they could have managed twice that. It was the idea that the number of services from Watford on the fast and slow lines would be increased at the same time that sounded odd.

But it now occurs to me that, even if only two slow line paths per hour were newly available into Euston, the benefit of the earlier non-Euston services would not have been taken yet. For one thing, they were rebuilding Chalk Farm Junction. So it was only be after the grade separation was finished that extra capacity on the fast and slow lines became usable into Euston. And I guess almost everything stopped at Watford.


There are 6 lines between Euston and Watford, UP & DN Fast, UP & DN Slow and the UP & DN Electric.  Although since the 1960's they have all been electric  Grin

So getting 12 tph would not be a challenge, it is only the recent decades that many of the stations have lost there Fast and in a number of places Slow platforms
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page