Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 06:35 20 Apr 2024
- Some Wales roads to revert to 30mph after backlash
- BBC presenter reports racist abuse on London train
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningCancelled
05:15 Plymouth to Penzance
06:38 Weymouth to Gloucester
07:40 Penzance to Plymouth
08:15 Penzance to London Paddington
18:52 London Paddington to Great Malvern
19:19 Carmarthen to Swansea
Short Run
06:30 Cardiff Central to Portsmouth Harbour
07:22 Exeter St Davids to Penzance
14:48 London Paddington to Carmarthen
21:07 Gloucester to Bristol Temple Meads
Delayed
05:25 Swansea to London Paddington
05:30 Bristol Temple Meads to London Paddington
06:30 Bristol Temple Meads to London Paddington
06:34 Great Malvern to Bristol Temple Meads
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2024, 06:42:08 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[276] Somerset and Dorset Devonshire Tunnel flood
[265] Rail to refuge / Travel to refuge
[45] Rail delay compensation payments hit £100 million
[40] Problems with the Night Riviera sleeper - December 2014 onward...
[19] Difficult to argue with e-bike/scooter rules?
[18] Signage - not making it easy ...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Strike ... again  (Read 1520 times)
grahame
Administrator
Hero Member
*****
Posts: 40784



View Profile WWW Email
« on: August 13, 2022, 08:34:03 »

Depressingly quiet ... strike day.   We are getting so used to these days that we don't comment very much - "here we go again".    Our disruption map says "no reported service changes at present" - and that's because around 95% of trains were withdrawn from the timetable before they even made the starting plan line.

Had trains been running, we would have been doing a leisure trip to Oxford today.  As it is, trip not happening and it's something we can do without.  Post-pandemic, far more optional leisure trips and the railway no longer has the "need" element for us.   So if it wants to survive, it really needs to have everyone who has a part in running trains looking out  for the customer in a way that perhaps (!!) they have not always done in the past.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
Mark A
Global Moderator
Hero Member
*****
Posts: 1339


View Profile
« Reply #1 on: August 13, 2022, 09:45:14 »

Also, if we had a network more aligned to travel needs, Bristol - Oxford's through trains would have been retained and developed (and possibly further via East West Rail). Oh, and Oxford would have through trains to Leicester and Nottingham via Coventry, tho I can't work out what would have had to be done to Nuneaton to enable those.

Mark
Logged
jamestheredengine
Transport Scholar
Hero Member
******
Posts: 302


View Profile
« Reply #2 on: August 13, 2022, 09:52:15 »

Also, if we had a network more aligned to travel needs, Bristol - Oxford's through trains would have been retained and developed (and possibly further via East West Rail). Oh, and Oxford would have through trains to Leicester and Nottingham via Coventry, tho I can't work out what would have had to be done to Nuneaton to enable those.

Mark
Or maybe Oxford - Banbury - Rugby Central - Lutterworth - (new curve from the GCR» (Gloucester - next trains) to the MR (Midland Railway) near Countesthorpe) - Leicester London Road
Logged

grahame
Administrator
Hero Member
*****
Posts: 40784



View Profile WWW Email
« Reply #3 on: August 13, 2022, 10:26:57 »

Also, if we had a network more aligned to travel needs, Bristol - Oxford's through trains would have been retained and developed (and possibly further via East West Rail). Oh, and Oxford would have through trains to Leicester and Nottingham via Coventry, tho I can't work out what would have had to be done to Nuneaton to enable those.

Mark

Reversing and crossing the West Coast Main Line on the flat at Nuneaton would be problematic which is why there's a scheme been raised to reinstate the avoid curve which goes underneath.   That gives rise to an issue as to whether the trains actually call at and connect at a Nuneaton station.





If you had (say) 2 trains an hour running from Coventry into the Nuneaton area would you look to (somehow) have them all call and connect in Nuneaton, or dilute the frequency down to one-an-hour Coventry to Nuneaton and one-an-hour Coventry to Leicester?   And your choice would also affect Nuneaton - Leicester flows.

Looking wider - Templecombe (historic), Newark, Yeovil (current need for better interchange), Old Oak (future) and Limeric Junction (reductio ad absurdum) give us lessons to consider.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
Mark A
Global Moderator
Hero Member
*****
Posts: 1339


View Profile
« Reply #4 on: August 13, 2022, 13:30:18 »

Fascinating. That spur out of use as a through route by 1900 - and finally closed with the engine shed there in 1966. The WCML (West Coast Main Line) bridge, a quad track steel overbridge which has gone.

There's three photos of it on this page (finding them would involve mammoth scrolling, hence the direct links)


http://www.nuneatonhistory.com/on-london--north-western-railway-lines.html


http://www.nuneatonhistory.com/uploads/1/8/6/8/18680466/6772156_orig.jpg

http://www.nuneatonhistory.com/uploads/1/8/6/8/18680466/4917599_orig.jpg
http://www.nuneatonhistory.com/uploads/1/8/6/8/18680466/9305469_orig.jpg

And yes, Oxford to Leicester and Nottingham services to not call at Nuneaton.

Mark


Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7163


View Profile
« Reply #5 on: August 13, 2022, 14:30:00 »

Fascinating. That spur out of use as a through route by 1900 - and finally closed with the engine shed there in 1966. The WCML (West Coast Main Line) bridge, a quad track steel overbridge which has gone.

I assume "spur" means the LNWR (London North Western Railway) Loop Line, the southern chord, which was a goods line like the LM (London Midland - recent franchise) Avoiding Line to the north. Both went our of use ages ago, with the Loop Line being just a siding by 1900. The avoiding Line was reopened and re-routed in 2004 via the two new platforms so that XC (Cross Country Trains (franchise)) can call there. If the bridge over the Loop Line was in need of much work, I can't see how anyone could have justified spending money - after all the Coventry line was closed for a time.

But what's being promoted now is a "dive-under". I can't see anything saying where it is to go, only that burrowing under the main line is going to cost lots. Presumably it would take trains that reverse in platform 1 under the main line and towards Leicester. I suspect better value (and thus probability of funding) would come from doing something different, using what's there already. For example, building (or re-building) a link between other lines to allow a route from Coventry to enter Nuneaton as if from Birmingham.

Or, given a new station was built on the Coventry Line (Bermuda Park), why not build another one one the way to Birmingham? Trains from Coventry could reverse there, which granted would take longer (and might involve two calls at Nuneaton), but you'd be offering the residents of Whittleford a station again.

Note the difference between old and new avoiding lines. The old ones were for goods, and linked lines that would otherwise call for a reversal and/or crossing the main line. Grade separation was secondary. The new ones are all about grade separation, and allowing station calls with a reversal is not a significant penalty. The lines linked may already be linked across a flat junction - which used to be adequate, but now is not operationally acceptable.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page