Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 14:15 20 Apr 2024
- Three men killed in retail park car crash named
* Some Wales roads to revert to 30mph after backlash
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningCancelled
13:07 Salisbury to Bristol Temple Meads
18:52 London Paddington to Great Malvern
19:19 Carmarthen to Swansea
Short Run
10:03 London Paddington to Penzance
11:09 Gloucester to Weymouth
14:48 London Paddington to Carmarthen
15:30 Weymouth to Gloucester
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2024, 14:34:17 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[279] Somerset and Dorset Devonshire Tunnel flood
[220] Rail to refuge / Travel to refuge
[109] On reservations, fees and supplements - Interrail
[37] Rail delay compensation payments hit £100 million
[33] Problems with the Night Riviera sleeper - December 2014 onward...
[16] Difficult to argue with e-bike/scooter rules?
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2] 3
  Print  
Author Topic: Can you identify these short-lived lines / stations / services?  (Read 2421 times)
DR7835
Jr. Member
**
Posts: 24


View Profile
« Reply #15 on: January 10, 2023, 10:01:28 »

6 the Tetbury branch

Indeed, but which specific station thereon?


Trouble House Halt
Logged
PrestburyRoad
Sr. Member
****
Posts: 194


View Profile
« Reply #16 on: January 10, 2023, 10:34:17 »

I don't know any of the answers but I can add another short-lived service.  It's a station I never visited, though I did travel along the line in the 1980s.

15. The station featured two platforms linked by a footbridge, a waiting room, and a gravel car park. ... The structure used a scaffolding base covered by wooden planks with an anti-slip surfacing. ... Once opened, the station was served by all existing trains and an additional hourly shuttle train. ... This service started on 30 November 2009 and ran until 28 May 2010. It was initially funded by the Department for Transport at a cost of £216,000. All services between [deleted], [deleted], [deleted] and [deleted] were free of charge for this period.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7163


View Profile
« Reply #17 on: January 10, 2023, 10:36:09 »

Yes that was it Heathrow Junction, Goer was proposed but was not liked by BAA but as a BR (British Rail(ways)) / Railltrack project name its was

There was no pedestrian access or private road vehicle access because it was inside a Ministry of Defence site so the only road access was via the shuttle bus.

The service was operated by Turbos 165/6

Google Earth has a contemporary photo of the platform, train and buses. Even with that, it's hard to see on the 1999 image how it all fitted in. It was fenced off outside the "government offices" (as the OS (Ordnance Survey) map has it), but only a narrow strip of mainly road. Did the buses really have to do a three point turn to exit?
« Last Edit: January 10, 2023, 10:58:05 by stuving » Logged
eXPassenger
Transport Scholar
Hero Member
******
Posts: 548


View Profile
« Reply #18 on: January 10, 2023, 10:54:55 »

I don't know any of the answers but I can add another short-lived service.  It's a station I never visited, though I did travel along the line in the 1980s.

15. The station featured two platforms linked by a footbridge, a waiting room, and a gravel car park. ... The structure used a scaffolding base covered by wooden planks with an anti-slip surfacing. ... Once opened, the station was served by all existing trains and an additional hourly shuttle train. ... This service started on 30 November 2009 and ran until 28 May 2010. It was initially funded by the Department for Transport at a cost of £216,000. All services between [deleted], [deleted], [deleted] and [deleted] were free of charge for this period.

15  Workington North, during the floods.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #19 on: January 10, 2023, 11:26:54 »

Yes that was it Heathrow Junction, Goer was proposed but was not liked by BAA but as a BR (British Rail(ways)) / Railltrack project name its was

There was no pedestrian access or private road vehicle access because it was inside a Ministry of Defence site so the only road access was via the shuttle bus.

The service was operated by Turbos 165/6

Google Earth has a contemporary photo of the platform, train and buses. Even with that, it's hard to see on the 1999 image how it all fitted in. It was fenced off outside the "government offices" (as the OS (Ordnance Survey) map has it), but only a narrow strip of mainly road. Did the buses really have to do a three point turn to exit?

The MoD permission was quite strict on the use of the site.

The station only had a single platform which was on the DN side ie the east side; today there is a service road into some industrial units which was one of the 2 construction access
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
grahame
Administrator
Hero Member
*****
Posts: 40786



View Profile WWW Email
« Reply #20 on: January 10, 2023, 12:50:43 »

I don't know any of the answers but I can add another short-lived service.  It's a station I never visited, though I did travel along the line in the 1980s.

15. The station featured two platforms linked by a footbridge, a waiting room, and a gravel car park. ... The structure used a scaffolding base covered by wooden planks with an anti-slip surfacing. ... Once opened, the station was served by all existing trains and an additional hourly shuttle train. ... This service started on 30 November 2009 and ran until 28 May 2010. It was initially funded by the Department for Transport at a cost of £216,000. All services between [deleted], [deleted], [deleted] and [deleted] were free of charge for this period.

15  Workington North, during the floods.

Wonderful example of quick work and what CAN be done - the station was provided in response to rainfall on 19th November which swept away the road bridge on 20th.   I wonder what could/would be done if providing transport to Portishead became an emergency.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
grahame
Administrator
Hero Member
*****
Posts: 40786



View Profile WWW Email
« Reply #21 on: January 10, 2023, 20:35:26 »

1, 2, 4, 7 and 10 remain
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
MVR S&T
Transport Scholar
Hero Member
******
Posts: 438


View Profile
« Reply #22 on: January 10, 2023, 20:58:12 »

Talking of short lived servises, was there not a sleeper service to/from Bournemouth at somepoint in the 90's I think?
Logged
bradshaw
Transport Scholar
Hero Member
******
Posts: 1455



View Profile
« Reply #23 on: January 10, 2023, 20:59:37 »

10 Findhorn Station on the Findhorn Railway, opened 18th April 1860 the three mile line went to Kinloss, officially closed 29th January 1869. However, a storm washed away some of the track overnight on the 28th.
It was not until 1886 that the permanent way materials were advertised for sale.
RAF (Royal Air Force) Kinloss was built over part of the trackbed
Logged
bradshaw
Transport Scholar
Hero Member
******
Posts: 1455



View Profile
« Reply #24 on: January 10, 2023, 21:03:47 »

7 Guernsey Railway
Logged
grahame
Administrator
Hero Member
*****
Posts: 40786



View Profile WWW Email
« Reply #25 on: January 10, 2023, 21:05:02 »

Talking of short lived servises, was there not a sleeper service to/from Bournemouth at somepoint in the 90's I think?

Brockenhurst? 
http://www.malcolm-smith.com/railways/working/rail/north/motorail/motorail.html
http://www.malcolm-smith.com/railways/working/rail/north/motorail/06-r-08.html
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
Western Pathfinder
Global Moderator
Hero Member
*****
Posts: 1531



View Profile
« Reply #26 on: January 10, 2023, 21:08:04 »

No4 The CM&GR or the Surrey Iron Railway.
Logged
grahame
Administrator
Hero Member
*****
Posts: 40786



View Profile WWW Email
« Reply #27 on: January 10, 2023, 21:20:30 »

Just 1 and 2 to identify - I know it's possible because a member has sent me the solution in a personal message but didn't want to spoil it for the rest of you.   

This has been fascinating research!
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #28 on: January 10, 2023, 21:27:49 »

There are some very short lived stations in this quiz, with the shortest being 126 days. But there was a station that was only served for three weeks, in April 1874 – and it was GWR (Great Western Railway)!
Logged

Waiting at Pilning for the midnight sleeper to Prague.
MVR S&T
Transport Scholar
Hero Member
******
Posts: 438


View Profile
« Reply #29 on: January 10, 2023, 21:32:53 »


Yes and that service. found the sleeper. https://www.flickr.com/photos/74384955@N03/7822401796/in/photolist-cVeRwu-2o32GUb-8wsrcf-8wpqHx-8wsr2d
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2] 3
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page