Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 17:15 07 Oct 2024
 
* Major incident declared as school bus carrying up to 70 overturns
* Major incident declared after school bus crash in County Down
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 11/10/24 - TWSW General Meeting
22/10/24 - BoA Public Transport talk
25/10/24 - Melksham Transport Group
27/11/24 - WWRUG, Trowbridge

No 'On This Day' events reported for 7th Oct

Train RunningCancelled
17:15 Penzance to Plymouth
Short Run
15:17 Worcester Foregate Street to London Paddington
15:54 Cardiff Central to London Paddington
15:55 Exmouth to Paignton
16:00 London Paddington to Bristol Temple Meads
16:19 Carmarthen to London Paddington
16:23 Exmouth to Paignton
17:10 Weston-Super-Mare to Severn Beach
17:40 Paignton to Exmouth
Delayed
14:24 Carmarthen to London Paddington
15:59 Cardiff Central to Taunton
16:10 Weston-Super-Mare to Severn Beach
16:35 London Paddington to Plymouth
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
October 07, 2024, 17:26:54 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[139] 11th October 2024 - Travelwatch Southwest general meeting, Tau...
[52] ARE there enough train crew?
[50] 6. Catering
[46] vote for your favourite rail leaf cleaner
[41] Aberthaw Power Station and Decarbonisation
[39] New station at Ashley Down, Bristol
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 3 [4]
  Print  
Author Topic: Wokingham resignalling  (Read 9779 times)
stuving
Transport Scholar
Hero Member
******
Posts: 7297


View Profile
« Reply #45 on: March 01, 2024, 23:45:37 »

I don't think this crossing was, in fact, ever likely to become am object detection one. The guide (Level crossings: a guide for managers, designers and operators) says of CB-ODs:
Quote
This type of crossing may be suitable at sites where road traffic flows freely, road lay-out is simple and there is no significant history of misuse. Risk assessment should, in particular, consider how the risks from blocking-back of road traffic and high or problematic pedestrian usage will be controlled.

The station crossing was never going to meet that description; even the Star Lane one, which might, has gone to MCB (Miniature Circuit Breaker) (CCTV (Closed Circuit Tele Vision)) as well.

However, that guide has been withdrawn by ORR» (Office of Rail and Road formerly Office of Rail Regulation - about), and "replaced" by Principles for managing level crossing safety, which is guidance for doing risk assessments. I don't see that as a replacement, and I'm not convinced it's helpful (a topic to return to, probably.)
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7297


View Profile
« Reply #46 on: March 02, 2024, 00:19:28 »

Here's how to paint, or rather repaint, a level crossing - not exactly a modern automated process.

First you mark out the lines with a chalky string (p1). I didn't see any careful measuring, so I think they had a plan or image of the crossing, with the pattern drawn onto it. They did some of the white lines and the yellow lines at the ends with hot gloop while I was away. I was told by one of the main contractor's guys that the yellow gloop does not stick to the Strail plastic panels in the centre, but not why the white stuff does.

Putting gloop down obviously involves a degree of skill, using what I gather is called a drawbox (p2). Those Strail panels were done with roll-on paint, following masking with sticky tape (p3). Supposedly that does adhere - but in the final view, from Monday, it's already wearing off (p4).

On Sunday, they were installing new trespass guards after all; they are some kind of rigid plastic and are screwed down. And I was told, about that fencing, that they now had to make all the 1.4s into 1.6s. I take it that means the standard they work to now says six-foot high fencing is needed all round it.
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 2044


Hockley viaduct


View Profile
« Reply #47 on: March 02, 2024, 07:08:37 »

Yellow and white line painting seems to wear very quickly. Is that because of economy and they put down the thinnest layer. I know ones in London which have survived for ages, but I can also feel them when I go over them on the bike.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7297


View Profile
« Reply #48 on: March 02, 2024, 22:47:30 »

Yellow and white line painting seems to wear very quickly. Is that because of economy and they put down the thinnest layer. I know ones in London which have survived for ages, but I can also feel them when I go over them on the bike.

The main factor is, I'm sure, that there are three main ways of applying these markings (that I've seen used here - and many more I've not). Paint is obviously likely to wear off, and most notably so on plastic surfaces like the level crossing boards (have you tried painting drainpipes?).

Then there's the gloop - officially it's a thermoplastic resin - which forms a thick solid layer. This will eventually break up like the road itself, but does seem more durable.  I see cold gloop is now available, and lasts even better.

When the Wokingham crossing and junction were rearranged in 2015, some of the white lines at the junction were applied as sticky shapes. The process involved preheating the road with as gas torch, then rolling them down. It did not work, and they got lifted up, and stuck down on other markings - which looked really bad, and pretty confusing.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7297


View Profile
« Reply #49 on: March 02, 2024, 22:56:51 »

When I went to have a look on Monday (19th) afternoon, there was a guy with a video camera on a tripod. He turned out to be one of the Basingstoke signallers who does the level crossings! He was promising shorter barrier-down times, suggesting there was a new block, or least a distant signal, on the approach from Crowthorne (though I'm not convinced of that).

I would expect the ROC (Rail Operating Centre - a centralised location for railway signalling and train control operations for a specific route or region) to be quicker than a local signaller, resetting the route for the next train using the lever frame before crossing the box to press the button, especially with ARS (Automatic Route Setting). Crossings now have their own signaller, and I was surprised to see that they use a box with lights and switches per crossing, not a patch of a screen.

I didn't gather whether this video was for familiarisation and briefing purposes, or whether he was being a railway enthusiast (which he obviously was). I've now found the video on YouTube, where he calls himself M-Train. So if you like watching level crossings operating, he has more like this ...
https://youtu.be/7sCDrGmJ5Yw

He said the emergency number goes to the relevant signaller, and they get a lot of non-emergency stuff: complaints and insults mainly. I'm surprised there isn't an operator to screen calls in this sort of urban area.

We both thought one of the zigzags (the far one in the video) was rather low - perhaps to improve the sighting for drivers? Well, a driver's eye view doesn't support that, what it really shows is how dense the thicket of signs and posts is there.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7297


View Profile
« Reply #50 on: March 03, 2024, 00:14:08 »

“Can anyone explain the relevance of the first photo to a resignalling project?”

The pic of what looks like bank stabilization works does seem irrelevant; probably another example of Network Rail’s Media Contractors’ Reputation Management efforts or should it be mismanagement efforts ?!

True, if that is slope stabilisation work, it does not seem to fit even the track replacement work in the project. But then apart from the two staff recorded at Wokingham Station, the other scenes in the video are not related to the recent work. The level crossing being renewed is Mays crossing in Datchet, and the overhead view is of Wood Lane crossing at Isleworth - done ages ago.

For a resignalling project, it did seem a bit odd for 1 km of track replacement to be included. But replacing Wokingham Junction did make sense as resignalling, not just using the blockade for another job. It would not make sense to replace it and to do the motorisation as separate steps.

And while it's not obvious how to measure the single track length of a junction, that one is likely to come out as is over 800m. Then there are the two crossovers worked by ground frames, at Bracknell and Blackwater, which have been motorised - and may have been replaced in the process.
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 2044


Hockley viaduct


View Profile
« Reply #51 on: May 17, 2024, 07:09:53 »

When are they going to complete the new bridge? Or is that the purpose of the latest planned closure?
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7297


View Profile
« Reply #52 on: May 24, 2024, 16:22:46 »

When are they going to complete the new bridge? Or is that the purpose of the latest planned closure?

It'll now be late summer!

Explanation on the bridge/foot crossing thread with previous pictures etc.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 3 [4]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page