grahame
|
|
« Reply #150 on: March 18, 2024, 21:42:07 » |
|
That four successive trains (five if you include the clearly defective 1W29) should suffer "a problem with the traction equipment (MC)" must be a new record.
But is doesn't say "the traction equipment on this train". A freight train sat down between Reading and Didcot this afternoon - perhaps the traction on that caused its failure and a whole series of knock-ons.
|
|
|
Logged
|
Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
|
|
|
IndustryInsider
|
|
« Reply #151 on: March 19, 2024, 08:52:43 » |
|
Indeed. I’ll say it again…you need to interpret industry codes, that RTT» and others harvest, loosely.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
Worcester_Passenger
|
|
« Reply #152 on: March 19, 2024, 08:57:14 » |
|
Indeed. I’ll say it again…you need to interpret industry codes, that RTT» and others harvest, loosely.
That makes a lot more sense. Thank you.
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #153 on: March 22, 2024, 09:18:57 » |
|
08:15 Worcester Shrub Hill to London Paddington due 10:23 will be diverted between Worcester Shrub Hill and Reading. It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough and Oxford but will call additionally at Cheltenham Spa and Didcot Parkway. It has been delayed at Worcester Shrub Hill and is now 13 minutes late. This is due to this train being late from the depot. And a couple from yesterday: 1W25 1251 London Paddington to Worcester Foregate Street - cancelled between Oxford and Worcester Foregate Street due to unknown cause (ZW) 1P34 1631 Worcester Foregate Street to London Paddington - cancelled between Worcester Foregate Street and Oxford due to late arrival of an inbound service (YI)
|
|
|
Logged
|
|
|
|
Witham Bobby
|
|
« Reply #154 on: March 22, 2024, 09:35:46 » |
|
08:15 Worcester Shrub Hill to London Paddington due 10:23 will be diverted between Worcester Shrub Hill and Reading. It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough and Oxford but will call additionally at Cheltenham Spa and Didcot Parkway. It has been delayed at Worcester Shrub Hill and is now 13 minutes late. This is due to this train being late from the depot. And a couple from yesterday: 1W25 1251 London Paddington to Worcester Foregate Street - cancelled between Oxford and Worcester Foregate Street due to unknown cause (ZW) 1P34 1631 Worcester Foregate Street to London Paddington - cancelled between Worcester Foregate Street and Oxford due to late arrival of an inbound service (YI) I think there may have been a signal or signalling failure near Didcot North Junction yesterday that threw a lot of the timetable out of the window
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #155 on: March 22, 2024, 10:08:41 » |
|
I think there may have been a signal or signalling failure near Didcot North Junction yesterday that threw a lot of the timetable out of the window
There was which caused disruption from late morning to mid-afternoon. A number of the Oxford to/from Paddington services which didn't run from/to the north Cotswolds were cancelled but the two quoted were the only Cotswold cancellations.
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #156 on: March 26, 2024, 13:47:50 » |
|
For the record, the impact on yesterday's issues on the north Cotswolds was pretty disruptive.
Paddington to Charlbury services:
13:50 from Paddington - cancelled 14:53 - cancelled 15:52 - arrived at Charlbury 31 late 16:58 - cancelled 17:57 - arrived at Charlbury 23 late 18:57 - cancelled 20:52 - arrived at Charlbury 22 late
Charlbury to Paddington
14:12 from Charlbury - arrived 116 late at Paddington 15:10 - cancelled 16:10 - cancelled 17:10 - departed 26 late and arrived 42 late at Paddington 18:41 - cancelled 19:19 - departed 20 late and arrived 24 late at Paddington 20:14 - cancelled
No services running between Charlbury and Evesham due to engineering works.
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #157 on: March 26, 2024, 16:39:38 » |
|
15:52 London Paddington to Charlbury due 17:01 will be terminated at Oxford. It will no longer call at Hanborough and Charlbury. It is being delayed between London Paddington and Reading and is now expected to be 28 minutes late. This is due to damage to the overhead electric wires.
17:12 Charlbury to London Paddington due 18:29 will be started from Oxford. It will no longer call at Charlbury and Hanborough. This is due to damage to the overhead electric wires.
|
|
|
Logged
|
|
|
|
Richard Fairhurst
|
|
« Reply #158 on: March 27, 2024, 11:30:59 » |
|
Taxis were being laid on at Oxford - not sure whether they then picked up further passengers from Charlbury.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #159 on: March 28, 2024, 17:58:36 » |
|
17:57 London Paddington to Worcester Foregate Street due 20:11 will be cancelled. This is due to a shortage of train crew. Last Updated:28/03/2024 15:12
20:56 Worcester Foregate Street to London Paddington due 23:30 will be cancelled. This is due to a shortage of train crew. Last Updated:28/03/2024 15:12
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #160 on: March 29, 2024, 07:47:13 » |
|
05:23 Hereford to London Paddington due 08:24 will be started from Worcester Shrub Hill. This is due to a shortage of train crew. Last Updated:29/03/2024 05:46 This one should have spent the night at Hereford, but actually came back empty to Shrub Hill last night.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #161 on: March 30, 2024, 11:53:44 » |
|
18:52 London Paddington to Great Malvern due 21:13 will be terminated at Worcester Shrub Hill. This is due to a shortage of train crew. Last Updated:30/03/2024 11:44
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #162 on: March 30, 2024, 15:42:27 » |
|
Change of plan: 18:52 London Paddington to Great Malvern due 21:13 will be cancelled. This is due to a shortage of train crew. Last Updated:30/03/2024 14:25
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #163 on: March 30, 2024, 17:36:04 » |
|
20:20 Hereford to London Paddington due 23:38 will be terminated at Reading. This is due to urgent repairs to the railway. Last Updated:30/03/2024 16:16
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #164 on: March 31, 2024, 07:06:11 » |
|
The effect of the emergency track repairs: 08:15 Worcester Foregate Street to London Paddington due 10:28 will be terminated at Reading. This is due to a safety inspection of the track. Last Updated:31/03/2024 05:28
10:48 London Paddington to Great Malvern due 13:14 will be started from Reading. This is due to a safety inspection of the track. Last Updated:31/03/2024 05:28
|
|
|
Logged
|
|
|
|
|