charles_uk
|
|
« Reply #570 on: November 28, 2024, 19:49:25 » |
|
Thursday November 28 19:53 London Paddington to Hereford due 22:58 will be terminated at Oxford. This is due to a shortage of train crew. Last Updated:28/11/2024 00:09 Has now changed to a full cancellation: 19:53 London Paddington to Hereford due 22:58 will be cancelled. This is due to a shortage of train crew. Last Updated:28/11/2024 18:13 with the following knock on tomorrow morning: 29/11/24 05:23 Hereford to London Paddington due 08:24 will be cancelled. This is due to a shortage of train crew. Last Updated:28/11/2024 18:17
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #571 on: November 29, 2024, 06:32:06 » |
|
With the following rammed full 1W30 1523 London Paddington to Worcester Foregate Street service held at Oxford for 16 minutes. Just what's needed when temperatures are struggling to get above freezing.
The 15:23 was then held at Evesham (+40), arrived Foegate St +48 and was cancelled thereafter. The return working, 1P42 19:05 Great Malvern to London Paddington was started from Worcester Foregate Street, was held at Norton and Charlbury (+16), was delayed near Stockley Junction and arrived Paddington +48. The following 1P44 1945 Great Malvern to London Paddington was delayed likewise and arrived +32.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #572 on: November 29, 2024, 06:44:39 » |
|
Friday November 29 Not a good start. The 05:23 Hereford was cancelled yesterday evening. To that we have to add 07:13 Great Malvern to London Paddington due 09:42 will be cancelled. This is due to a shortage of train crew. Last Updated:29/11/2024 02:00
08:15 Worcester Shrub Hill to London Paddington due 10:23 will be terminated at Didcot Parkway. This is due to a shortage of train crew. Will be formed of 3 coaches instead of 5. Last Updated:29/11/2024 04:20 The 08:15 change follows from 06:33 Swindon to Worcester Shrub Hill due 07:58 will be cancelled. This is due to a shortage of train crew. Last Updated:29/11/2024 02:00 But someone in Control has done a crafty move with the stock. Looking in detail at RTT» , the stock has been "stolen" from 07:04 Worcester Foregate Street to Bristol Temple Meads due 08:35 will be terminated at Worcester Shrub Hill. This is due to a shortage of train crew. Last Updated:29/11/2024 02:09 From Shrub Hill towards Oxford, this leaves 05:14 - 9 cars 06:43 - 9 cars 07:00 halts train - 2 cars 08:15 - 3 cars 09:15 - 9 cars
|
|
« Last Edit: November 29, 2024, 06:57:34 by Worcester_Passenger »
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #573 on: November 29, 2024, 11:09:03 » |
|
'Heavy rain flooding the railway' is perhaps understandable - Storm Bert and all that. But such a litany of 'cancellation due to a shortage of train crew' shows that GWR▸ are now merely providing a 'Monday to Friday' train service. CfN. And even the provision of a Monday to Friday "service" seems to be becoming a struggle for GWR
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #574 on: November 29, 2024, 12:35:35 » |
|
Alterations to services between Evesham and Worcester Shrub Hill Following a fault with the signalling system between Evesham and Worcester Shrub Hill all lines have now reopened. Train services running through these stations are returning to normal but some services may still be delayed by up to 45 minutes or revised. Disruption is expected until 13:30 29/11. 09:52 London Paddington to Hereford due 12:46 will be terminated at Worcester Foregate Street. It will no longer call at Malvern Link, Great Malvern, Colwall, Ledbury and Hereford. It has been delayed at Moreton-In-Marsh and is now 43 minutes late. This is due to a fault with the signalling system.
10:53 London Paddington to Worcester Shrub Hill due 13:01 will be terminated at Oxford. It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl and Worcester Shrub Hill. This is due to a fault with the signalling system.
13:16 Worcester Shrub Hill to London Paddington due 15:23 will be started from Oxford. It will no longer call at Worcester Shrub Hill, Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury and Hanborough. This is due to a fault with the signalling system.
13:18 Hereford to London Paddington due 16:25 will be started from Worcester Foregate Street. It will no longer call at Hereford, Ledbury, Colwall, Great Malvern and Malvern Link. This is due to a fault with the signalling system.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #575 on: November 29, 2024, 12:56:39 » |
|
Meanwhile, unreported on Journeycheck, 1P26 1059 Great Malvern to London Paddington was held at Shrub Hill but has now departed +51. Holding at Shrub Hill is good. It means that alternatives are still possible - sending the train round by Stroud or decanting all the passengers into a coach. But it does block one of the two platforms.
And the following 1P28 11:57 Great Malvern to London Paddington was started from Worcester Shrub Hill (+24).
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #576 on: November 29, 2024, 14:56:29 » |
|
A small piece of good news: 13:18 Hereford to London Paddington due 16:25 will be started from Great Malvern. This is due to a fault with the signalling system. Last Updated:29/11/2024 12:47 The outward journey, 1W01 0952 London Paddington to Hereford, was held at Moreton (+43), Evesham (+53) and Shrub Hill (+63), and was cancelled after Great Malvern.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #577 on: November 29, 2024, 22:00:27 » |
|
And in the evening, the halts train and its return working were cancelled.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #578 on: November 30, 2024, 08:00:03 » |
|
Saturday November 30 07:43 Great Malvern to London Paddington due 10:24 will be cancelled. This is due to a shortage of train crew. Last Updated:30/11/2024 02:00 08:40 07:52 London Paddington to Great Malvern due 10:16 has been cancelled. This is due to a fault on this train. Last Updated:30/11/2024 08:27
10:50 Great Malvern to London Paddington due 13:24 will be cancelled. This is due to a fault on this train. Last Updated:30/11/2024 08:27
|
|
« Last Edit: November 30, 2024, 08:41:10 by Worcester_Passenger »
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #579 on: November 30, 2024, 14:28:56 » |
|
And in the afternoon, it's points failure at Didcot: 11:55 Great Malvern to London Paddington due 14:23 will be terminated at Reading. It has been delayed at Didcot Parkway and is now 33 minutes late. This is due to a points failure. Last Updated:30/11/2024 14:19
13:05 Worcester Foregate Street to London Paddington due 15:22 will no longer call at Didcot Parkway. This is due to a points failure. Last Updated:30/11/2024 14:08
14:52 London Paddington to Great Malvern due 17:14 will be started from Reading. This is due to a points failure. Last Updated:30/11/2024 14:19 13:20 Hereford to London Paddington due 16:22 will no longer call at Didcot Parkway. This is due to a points failure. Last Updated:30/11/2024 14:24 14:50 Great Malvern to London Paddington due 17:25 will no longer call at Didcot Parkway. This is due to a points failure. Last Updated:30/11/2024 16:09
|
|
« Last Edit: November 30, 2024, 18:09:39 by Worcester_Passenger »
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #580 on: December 01, 2024, 07:13:27 » |
|
Sunday December 1 14:50 London Paddington to Great Malvern due 17:16 will be cancelled. This is due to a shortage of train crew. Last Updated:01/12/2024 02:00 This is a 'one-way' working - there's no return journey back to Paddington. Instead, the stock goes back to Stoke Gifford empty - 17:30 from Great Malvern, arrive Stoke Gifford 19:53. Later (13:17): 10:50 London Paddington to Great Malvern due 13:15 will be terminated at Worcester Foregate Street. It has been delayed between London Paddington and Oxford and is now 53 minutes late. This is due to earlier engineering works not being finished on time. Last Updated:01/12/2024 12:58
13:58 Great Malvern to London Paddington due 16:32 will be started from Worcester Foregate Street. This is due to earlier engineering works not being finished on time. Last Updated:01/12/2024 12:58
|
|
« Last Edit: December 01, 2024, 13:22:33 by Worcester_Passenger »
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #581 on: December 02, 2024, 16:44:05 » |
|
Monday December 2 17:04 Didcot Parkway to Moreton-In-Marsh due 18:10 will be terminated at Oxford. This is due to more trains than usual needing repairs at the same time. Last Updated:02/12/2024 15:57
18:51 Evesham to Oxford due 19:50 will be cancelled. This is due to more trains than usual needing repairs at the same time. Halts calls being made by 1W33 16:58 London Paddington to Great Malvern. 20:52 London Paddington to Great Malvern due 23:13 will be started from Reading. This is due to a shortage of train crew. Last Updated:02/12/2024 02:00
21:53 London Paddington to Worcester Shrub Hill due 00:01 will be terminated at Oxford. This is due to a shortage of train crew. Last Updated:02/12/2024 02:00 19:00 : The last two have now disappeared from the JourneyCheck lists.
|
|
« Last Edit: December 02, 2024, 19:02:29 by Worcester_Passenger »
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #582 on: December 03, 2024, 17:05:07 » |
|
Tuesday December 3 A good day until 1W27 13:50 London Paddington to Great Malvern : cancelled after Worcester Shrub Hill "due to a problem with train monitoring systems (PT)" [ RTT» ]. 1P38 16:32 Great Malvern to London Paddington : started from Shrub Hill. And 1P38 is now ahead of 15:18 Hereford to London Paddington due 18:29 has been delayed at Shelwick Jn and is now 40 minutes late. This is due to trespassers on the railway. Last Updated:03/12/2024 16:53 17:45 : But now... 15:18 Hereford to London Paddington due 18:29 will be terminated at Reading. It has been delayed at Shelwick Jn and is now 40 minutes late. This is due to trespassers on the railway. Last Updated:03/12/2024 17:15 Having been held at Norton, it's now +60. 18:57 London Paddington to Great Malvern due 21:20 will be started from Reading. This is due to trespassers on the railway. Will be formed of 5 coaches instead of 9. Last Updated:03/12/2024 17:15
|
|
« Last Edit: December 03, 2024, 18:07:27 by Worcester_Passenger »
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #583 on: December 03, 2024, 20:40:07 » |
|
A couple of short-formations this evening which will impact upon peak up services tomorrow morning: Facilities on the 19:53 London Paddington to Hereford due 22:58. Will be formed of 5 coaches instead of 9. There are no reservations on this service
Facilities on the 21:53 London Paddington to Worcester Shrub Hill due 00:01. Will be formed of 5 coaches instead of 9. There are no reservations on this service which seem to make up the stock for the next morning's 0523 Hereford to London Paddington and 0643 Worcester Shrub Hill to London Paddington services.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #584 on: December 04, 2024, 05:39:18 » |
|
A couple of short-formations this evening which will impact upon peak up services tomorrow morning: Facilities on the 19:53 London Paddington to Hereford due 22:58. Will be formed of 5 coaches instead of 9. There are no reservations on this service
Facilities on the 21:53 London Paddington to Worcester Shrub Hill due 00:01. Will be formed of 5 coaches instead of 9. There are no reservations on this service which seem to make up the stock for the next morning's 0523 Hereford to London Paddington and 0643 Worcester Shrub Hill to London Paddington services. Overnight, someone has swapped the next-day workings at Shrub Hill - the 5-car set is on 1P11 0514 Worcester Shrub Hill to London Paddington (07:24), and a 9-car set on 1P16 0643 Worcester Shrub Hill to London Paddington (08:44). But it still means that three of the first four London trains from Worcester to Oxford are five cars instead of nine. And none of this is reported in the 'Formations' section of JourneyCheck. Later in the day: 13:50 London Paddington to Great Malvern due 16:15 will be terminated at Oxford. This is due to a shortage of train crew. Last Updated:04/12/2024 02:56
16:32 Great Malvern to London Paddington due 19:29 will be started from Worcester Shrub Hill. This is due to a shortage of train crew. Last Updated:04/12/2024 02:56
20:52 London Paddington to Great Malvern due 23:13 will be terminated at Oxford. This is due to a shortage of train crew. Last Updated:04/12/2024 03:03
21:53 London Paddington to Worcester Shrub Hill due 00:01 will be terminated at Oxford. This is due to a shortage of train crew. Last Updated:04/12/2024 03:11
|
|
|
Logged
|
|
|
|
|