Train Graphic
Great Western Passengers' Forum Great Western Coffee Shop - [home] and [about]
This site uses cookies - see [here] for details.
If you proceed, we will take that as your consent to accept cookies
Random Image
Current Train Running Road Report Acronyms/Abbreviations Station Comparator Rail News FGW co. site Site Style 1 2 3
May 20, 2013, 09:30:19 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Login Register  
Pages: 1 ... 102 103 [104] 105 106 ... 109
  Print  
Author Topic: Cotswold Line redoubling: 2008 - 2011  (Read 160691 times)
inspector_blakey
Global Moderator
Hero Member
*****
Posts: 3560



View Profile
« Reply #1545 on: September 07, 2011, 07:42:43 PM »

Thanks for the suggestion Chris, the thought had occurred to me as well. Will discuss with the Mod Squad and get back to you...
Logged
Btline
Hero Member
*****
Posts: 4569



View Profile
« Reply #1546 on: September 07, 2011, 07:56:35 PM »

I've suggested creating additional threads when i created my "update" thread a while way.

I was basically shouted down (***) and it was decided to keep all the posts in one mega thread. The decision was made and I accepted it.

I would, however, support any splitting - as my opinion hasn't changed.

PS: Apologies if I've repeated things. It's just that I am passionate about getting the line to its full potential - it could be done!

Edit by Grahame, removing text at *** which the board administrators have received a complaint about. We are currently investigating this complaint; the removal of the text should be considered as an interim measure for the moment, and does not indicate whether we agree with the complaint or not ... we don't know, but we're playing safe
« Last Edit: September 09, 2011, 12:39:21 PM by grahame » Logged
ChrisB
Hero Member
*****
Posts: 2655


View Profile Email
« Reply #1547 on: September 07, 2011, 08:10:06 PM »

Only with shed loads of money...now where's that coming from & aren't there more important projects around? Like Stroud redoubling? Now, that certainly *will* bring many more pax....

Which is why any more work on the North Citswolds is a very long way off. So service improvements are minimal for some time, and your faster Worcesters probably at least 20 years away, even with the possible 180s & probable IEPs. There's better places to soend the money frankly
Logged
stebbo
Sr. Member
****
Posts: 296


View Profile
« Reply #1548 on: September 07, 2011, 08:24:19 PM »

The thought about splitting off this latest thread has occurred to me. As the person who started all this off with a reasonably inocuous question, I'm amazed it's gone so far but we are now discussing a new (future?) chapter for the line.

Incidentally, I agree that there are clearly two different schools of thought about how the line could now be operated. As you will have gathered I'm in the "long distance" camp but I hope I've not been vitriolic and I do appreciate that there's another school of thought.
Logged
chris from nailsea
Administrator
Hero Member
*****
Posts: 10800


I am not railway staff


View Profile Email
« Reply #1549 on: September 07, 2011, 08:38:55 PM »

Fair enough.  Roll Eyes

As this thread has now apparently reached the stage where some 'singling' of certain posts may be appropriate, I'm imposing a 'temporary engineering possession' on this topic - just while we sort out which posts will go where!  Shocked

There's nothing at all sinister in this: we simply need to have a 'position of safety' in which to work, without further posts being made, for the next couple of hours or so!

Thanks to everyone for your patience.

CfN.  Lips sealed
Logged

'Level crossings on the railway network are safe - unless they are used in an unsafe manner.'   Discuss.

William Huskisson MP was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: stop, look, listen.
Btline
Hero Member
*****
Posts: 4569



View Profile
« Reply #1550 on: September 08, 2011, 10:23:45 PM »

When will we get the first statistics to see the effect of the work on punctuality across the FGW network?
Logged
IndustryInsider
Hero Member
*****
Posts: 3294


View Profile
« Reply #1551 on: September 12, 2011, 09:32:00 AM »

It also should not be forgotten that Network Rail is investigating the possibilities of raising speed limits on the line up to 110 mph in parts and this could be a significant factor in getting to that overall Worcester/Paddington 2 hour timing

With the current stopping patterns, are there any lengths of track without stops where 110mph could be attained, and even maintained?....aren't the stops too close together?

First I've heard of 110mph seriously being considered, though I've often thought there could be improvements - I've heard that the numerous user worked crossings on the route are the biggest hurdle.

Using a HST as a performance yardstick:

  • You'd gain a 30 seconds or so on the Oxford-Charlbury section (if not stopping at Hanborough) with 110mph speeds, though they would be no improvement if there is a Hanborough stop in the middle.
  • Charlbury to Kingham would be spoiled by the 75mph stretch through the curves at Shipton, but if that section could be increased to 90mph then I'd guess almost a minute could be saved.
  • An increase from Kingham to Moreton from 90mph to 110mph would be perfectly feasable (crossings notwithstanding) and that could save another 30 seconds or so.
  • Moreton to Evesham at 75mph could be cut by a minute or so if 90mph (Aston Magna exluded), though in the Up direction if a stop at Honeybourne is included then Camden Bank would reduce that gain by quite a bit.
  • Evesham to Worcester is already 95mph for most of the route, and a service not calling at Pershore would gain a little from a 110mph limit, but as with Oxford to Charlbury they'd be no gain if a Pershore stop was included.  The biggest gain there would be the replacement of the 25mph crossing in the Down direction at Norton Junction with something much better.


Overall, I'd say you might be able to scrub 2-3 minutes from the average journey between Oxford and Worcester if all the above improvements were made.  Adelante's and ultimately IEP's could offer slightly more given their better acceleration. [/list]
Logged

To view my 'before and after' video comparison of the Cotswold Line Redoubling scheme, and a cab view of the new layout at Reading, see: http://www.dailymotion.com/user/IndustryInsider/1#
ChrisB
Hero Member
*****
Posts: 2655


View Profile Email
« Reply #1552 on: September 12, 2011, 09:34:32 AM »

So, not worth the investment really for a max gain of about 5 minutes with IEP/180s....
Logged
IndustryInsider
Hero Member
*****
Posts: 3294


View Profile
« Reply #1553 on: September 12, 2011, 09:52:53 AM »

Depends how much the investment would be I guess.  There would be little or no signalling alterations needed, and the track is probably pretty much up to the task in most locations already, so it might not cost that much?  Depends on the cost of modifying/closing all those crossings I suppose.
Logged

To view my 'before and after' video comparison of the Cotswold Line Redoubling scheme, and a cab view of the new layout at Reading, see: http://www.dailymotion.com/user/IndustryInsider/1#
Btline
Hero Member
*****
Posts: 4569



View Profile
« Reply #1554 on: September 12, 2011, 10:18:55 AM »

Don't forget 10 mins saved from PAD - OXF. So 15 off Worcester to London.
Logged
ChrisB
Hero Member
*****
Posts: 2655


View Profile Email
« Reply #1555 on: September 12, 2011, 10:52:50 AM »

Or 10 without the work. My point still stands.
Logged
IndustryInsider
Hero Member
*****
Posts: 3294


View Profile
« Reply #1556 on: September 12, 2011, 11:02:18 AM »

Meanwhile, the new weekday schedules have come into effect as of today.  I'll keep an eye out regarding loadings, particularly on the first off-peak up service from Worceter over the coming months.
Logged

To view my 'before and after' video comparison of the Cotswold Line Redoubling scheme, and a cab view of the new layout at Reading, see: http://www.dailymotion.com/user/IndustryInsider/1#
pbc2520
Full Member
***
Posts: 58


View Profile
« Reply #1557 on: September 12, 2011, 01:37:11 PM »

Meanwhile, the new weekday schedules have come into effect as of today....

I've just downloaded timetable 19 from
http://www.firstgreatwestern.co.uk/Content.aspx?id=5238
and it's the old one.  Sad

The new one is on the CLPG website:
http://www.clpg.co.uk/FGW19-120911.pdf
Logged
IndustryInsider
Hero Member
*****
Posts: 3294


View Profile
« Reply #1558 on: September 12, 2011, 01:50:59 PM »

I've just downloaded timetable 19 from
http://www.firstgreatwestern.co.uk/Content.aspx?id=5238
and it's the old one.  Sad

It's on the FGW website, but you have to click on the 'Timetable Supplements' tab.  Given that the whole timetable has been altered and the old timetable is now completely invalid, I would have thought the link on the main timetable page should now be changed?

The direct timetable link is: http://www.firstgreatwestern.co.uk/Documents/Custom/SEPT%202011%20TT/TT19_WEB_V1.pdf
Logged

To view my 'before and after' video comparison of the Cotswold Line Redoubling scheme, and a cab view of the new layout at Reading, see: http://www.dailymotion.com/user/IndustryInsider/1#
Richard Fairhurst
Sr. Member
****
Posts: 119


View Profile Email
« Reply #1559 on: September 12, 2011, 01:58:55 PM »

At about 11am yesterday there was an FGW van on Church Street in Charlbury putting up the new timetable outside the Rose & Crown. Old technology is clearly faster than this new-fangled web thing. Wink
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of First Great Western, for customers of First Great Western and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 102 103 [104] 105 106 ... 109
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by a customer of First Great Western, and the views expressed are those of the individual posters concerned. Visit www.firstgreatwestern.co.uk for the official First Great Western website. Please contact the adminstrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link). Forum hosted by Well House Consultants