Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 12:15 19 Apr 2024
* Children among eight dead in Russia strike on Ukraine
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
19th Apr (1938)
Foundation, Beatties of London (link)

Train RunningCancelled
11:23 Weston-Super-Mare to London Paddington
12:04 Bristol Temple Meads to Filton Abbey Wood
12:54 Filton Abbey Wood to Bristol Temple Meads
13:04 Bristol Temple Meads to Filton Abbey Wood
13:51 Filton Abbey Wood to Bristol Temple Meads
Short Run
09:27 Carmarthen to London Paddington
11:10 Weston-Super-Mare to Severn Beach
16:31 Barnstaple to Axminster
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 19, 2024, 12:33:39 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[149] Rail to refuge / Travel to refuge
[137] Rail delay compensation payments hit £100 million
[56] Signage - not making it easy ...
[11] IETs at Melksham
[10] Ferry just cancelled - train tickets will be useless - advice?
[9] From Melksham to Tallinn (and back round The Baltic) by train
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1] 2 3 ... 5
  Print  
Author Topic: Newport Station - problems, improvements and enhancements (merged topics)  (Read 41467 times)
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« on: August 08, 2007, 11:37:20 »

Passengers travelling to and from Cardiff faced major delays after a fire near the track in Newport spread along 10 houses (link below.)
http://icwales.icnetwork.co.uk/0100news/0200wales/tm_headline=rail-delays-after-huge-blaze-guts-row-of-houses%26method=full%26objectid=19588428%26siteid=50082-name_page.html

After severe train disruption yesterday afternoon , the main line re-opened at about 6.50pm with services due back to normal today.

Arriva Trains said four services had been terminated last night with alternative road transport being offered to passengers.

However , the fire had meant many more services were delayed with trains sticking to a 40mph speed limit.

First Great Western warned last night that all lines between Bristol and Newport were closed.

Here are inside views on this problem , and others on the network yesterday (links below.)
http://iworkforfgw.com/viewtopic.php?f=4&t=16&start=0&st=0&sk=t&sd=a

http://indefenceoffirstgreatwestern.blogspot.com/2007/08/track-problems.html
« Last Edit: August 08, 2007, 12:08:49 by Lee Fletcher » Logged

Vous devez être impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #1 on: August 18, 2007, 16:16:45 »

Bosses at Newport station are paying cabbies ^3 a time to ferry passengers from one rail platform to another (link below.)
http://www.rmtbristol.org.uk/2007/08/taxis_used_to_ferry_passengers.html#more

It is because a new ^5.5m platform , opened last month , does not have a lift for disabled,  elderly or passengers with pushchairs to use.

Network Rail said building a lift now would cause disruption , although there will be one in another redevelopment in time for the Ryder Cup in 2010.

In the meantime it is to provide free taxis as a "goodwill gesture".

The only access to the 270-metre long platform four is either a long walk through a car park or through the station over a footbridge.

But both routes are too difficult for passengers with mobility problems.

"It seems a bit strange if this was a new development that it wasn't thought about." - Disability Rights Commission spokeswoman.
Logged

Vous devez être impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #2 on: August 20, 2007, 15:39:29 »

Wales's disability rights commissioner is taking legal advice on whether the absence of a lift breaks the law (link below.)
http://news.bbc.co.uk/1/hi/wales/south_east/6953760.stm
Logged

Vous devez être impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
martyjon
Transport Scholar
Hero Member
******
Posts: 1941


View Profile
« Reply #3 on: August 20, 2007, 19:13:50 »

Wales's disability rights commissioner is taking legal advice on whether the absence of a lift breaks the law (link below.)
http://news.bbc.co.uk/1/hi/wales/south_east/6953760.stm


From what I saw in the picture accompanying the article the new platform has a curve on the platform face.

In the past when Devon County Council and the local council serving the area wanted to promote a new station at Kingkerswell on the Torbay Line on the site of the former station at the same location the H & S Executive put a block on it citing the reason that they dont sanction new stations unless the platform faces are straight to give a clear view of the complete train.

Strikes me Double Standards is at work here.
Logged
Chris from Nailsea
Administrator
Hero Member
*****
Posts: 17876


I am not railway staff


View Profile Email
« Reply #4 on: July 28, 2009, 00:18:24 »

From the BBC» (British Broadcasting Corporation - home page):

Quote
Newport station is undergoing a ^22m revamp to give it a space-age feel in time for the Ryder Cup golf tournament.

The 11 month project will see the venue almost double in size with a platform extension to cope with longer trains and an entrance on the northern side. The new look station will be clad in a material developed for the space industry and used on the Eden Project.

Arriva Trains Wales head of stations Peter Northcott said the station would be a "landmark building for the city".

Engineers have begun the work increasing the station's size to 2,100 sq m (22,500 sq ft).

Network Rail claims accessibility and safety are at the heart of the new design, with two new terminals and an additional new entrance to serve passengers from the northern side of the city. A station footbridge will connect passengers to all platforms while the station will also have three lifts, CCTV (Closed Circuit Tele Vision), a modernised customer information system and new waiting shelters. Both terminals will also have improved ticketing and information points and more shops.

The car park will have an additional 250 spaces and platform four will be extended by 50m (160ft).

The building will be clad in ethylene tetra fluoro ethylene (ETFE). Network Rail said ETFE, originally designed for the space industry, was chosen because it is extremely lightweight compared to glass and will require significantly less steel to support the structure.

In addition, the material provides better insulation than double glazing, does not degrade under ultraviolet light or atmospheric pollution and its non-stick, self-cleaning design means that grime can be easily removed by rain, said Network Rail.
Logged

William Huskisson MP (Member of Parliament) was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: stop, look, listen.

"Level crossings are safe, unless they are used in an unsafe manner."  Discuss.
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #5 on: July 29, 2009, 10:05:23 »

Network Rail announcement and artist's impression plus site pics here http://www.networkrailmediacentre.co.uk/Content/Detail.asp?ReleaseID=4543&NewsAreaID=2&SearchCategoryID=7
Logged
devon_metro
Hero Member
*****
Posts: 5175



View Profile
« Reply #6 on: July 29, 2009, 21:13:15 »

What's wrong with Newport as it is. They've just fitted the floodlights at the Cardiff end of the platform, who needs station lights when you've got LED signals!
Logged
devon_metro
Hero Member
*****
Posts: 5175



View Profile
« Reply #7 on: July 29, 2009, 22:19:18 »

They all stand near first and subsequently seem to pile in E and then have the cheek to complain it's crowded. Whenever I travel from Newport, I like the double seat at the very back of the TGS. Guaranteed to be empty!
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #8 on: July 30, 2009, 22:29:04 »

Is it too much like common sense to have announcements - as used at Oxford with rather hit and miss results ahead of HST (High Speed Train) departures to London - or the zones that BR (British Rail(ways)) Intercity used to have to indicate where people should stand on the platform. Probably too much of an 'old railway' approach...
Logged
IanC
Full Member
***
Posts: 55



View Profile
« Reply #9 on: August 05, 2009, 01:49:19 »

New-pwert City Council have also drawn up plans to redevelop the Station Yard area by the station.

South Wales Argus Link
Logged

Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #10 on: August 18, 2009, 11:50:49 »

What's wrong with Newport as it is. They've just fitted the floodlights at the Cardiff end of the platform, who needs station lights when you've got LED signals!

It is the British way to revamp by demolishing and rebuilding.  Newport is going to have an "Eden project style" plastic roof and lots of curved lines and silver pannels which will be dirty, damaged, vandalised and worn out in a few decades time.   What is wrong with just giving the station a lick of paint, some hanging baskets, and a tidy up?  The money saved could actually be used to provide more train services.  Bath was revamped a year or so ago and it looks more modern now but all it really needed was a deep clean, tidy and paint
Logged
Btline
Hero Member
*****
Posts: 4782



View Profile
« Reply #11 on: August 18, 2009, 14:56:46 »

I agree. We moan about 30s, 60s and 70s station architecture, and then replace it with another contemporary design that will be hated in 30 years!

Why don't we use traditional designs - guaranteed never to look ugly or be hated? Hmmm...a nice Georgian style building, with GWR (Great Western Railway) style canopies...
Logged
Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #12 on: August 18, 2009, 15:17:04 »

Newport is an old station so why not keep it's original style.  Lots could be done to improve its appearance by getting rid of some of the clutter and just tidying it up.  Something is wrong if there is money for a demolition and rebuild but no money to ever paint stations above head height. 

Its not just about design - build quality also matters hugely.  Concrete only looks cheap and nasty because it is cheap and nasty.  In the 60s and 70s we made mistakes with concrete because it was cheap and captured the imagination of architechs.  I fear that we are repeating them today with steel and glass for exactely the same reasons.  Brick and stone just age better. 

Logged
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #13 on: December 12, 2009, 18:18:01 »

From the South Wales Argus:

Quote from: South Wales Argus
Talks bid to save Newport footbridge plans

Urgent talks are taking place about the refurbishment of Newport station^s Victorian footbridge after Network Rail warned the city council it may not be ready for the Ryder Cup.

Plans to refurbish the footbridge were part of the ^2.8 million city centre redevelopment scheme, after proposals to build a brand new bridge were scrapped due to a lack funds.

The cash for the Victorian footbridge was provided by Network Rail, the Assembly, and Newport Unlimited, and the council hoped that once the refurbishment was complete the unpopular subway between Devon Place and Queensway could be closed.

But leader of the city council Matthew Evans said Network Rail had informed the local authority that work on the bridge was unlikely to be finished before October 2010 when the Ryder Cup comes to Newport.

High level talks are now under way between the council, Network Rail, the Assembly, and Newport Unlimited to find a solution.

Cllr Evans said: ^Understandably, I was unhappy when I found out there could be potential delays. But I am hoping we can resolve the situation and I sincerely hope we can still achieve a positive outcome.^

He added it was very important to improve access to the city from Goldtops, and that the refurbishment of the footbridge was an "integral" part of wider plans for the city centre.

In February this year, Mr Evans told the Argus the subway under the railway station was an ^embarrassment^ to the city.

Gareth Beer, interim CEO (Chief Executive Officer) of Newport Unlimited, told the Argus the ongoing talks were of the ^highest priority^, and all options were being explored to get the footbridge fit for purpose and the subway closed.

No one at Network Rail was available for comment.
Logged

Vous devez être impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
IanC
Full Member
***
Posts: 55



View Profile
« Reply #14 on: January 10, 2010, 22:10:28 »

Whilst using the 'Newsnow' link that can be found at the top of each page, I see that ITV Wales reported on the beginnings of the upgrade that hopefully will be ready in time for the Ryder Cup this year.

ITV Wales Link
Logged

Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1] 2 3 ... 5
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page