Train Graphic
Great Western Passengers' Forum Great Western Coffee Shop - [home] and [about]
Read about the forum [here]. Register and contribute [here] - it's free.
Random Image
Train Running @GWR Twitter Acronyms/Abbreviations Station Comparator Rail News GWR co. site Site Style 1 2 3 4 Chat on off
July 27, 2017, 09:35:32 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Login Register  
Pages: 1 ... 10 11 [12]
  Print  
Author Topic: Oxford Station - improvements, incidents and events (merged topic)  (Read 109874 times)
Oberon
Sr. Member
****
Posts: 133


View Profile Email
« Reply #165 on: July 23, 2017, 09:37:40 AM »

This link provides the first word from the DfT I have read that Didcot-Oxford wiring is not abandoned but is going ahead. This presumably will be part of the CP6 agenda. And, of course, it will give those nice new EMUs something to do when otherwise they'd be sitting in their depots for most of the day.

http://www.oxfordmail.co.uk/news/15426688.Train_track_electrification_will_go_ahead_in_Oxfordshire/?ref=rss
Logged
stuving
Hero Member
*****
Posts: 2361


View Profile
« Reply #166 on: July 23, 2017, 10:35:17 AM »

This link provides the first word from the DfT I have read that Didcot-Oxford wiring is not abandoned but is going ahead. This presumably will be part of the CP6 agenda. And, of course, it will give those nice new EMUs something to do when otherwise they'd be sitting in their depots for most of the day.

http://www.oxfordmail.co.uk/news/15426688.Train_track_electrification_will_go_ahead_in_Oxfordshire/?ref=rss

How come? What DfT are quoted as saying is only what has been noted on this forum already; that the statement last week about electrification planned for CP6 being dropped didn't mention the work (like Oxford) planned for CP5 and deferred to CP6 at all. The Oxford Mail have concluded from that that the work is definitely going ahead, but that's hardly authoritative.

So DfT's position is still what it was when those deferrals were announced, that they intend the work to be done in CP6. The work content of CP6 is still being negotiated with NR, who will need to make a case for each item to DfT.
Logged
didcotdean
Hero Member
*****
Posts: 605


View Profile
« Reply #167 on: July 23, 2017, 10:36:33 AM »

The only commitment here to me is Didcot-Oxford will have its own announcement whatever way that is at whatever time. Running bi-modes on the fasts to Oxford and the 387 on stoppers to Didcot and a diesel stopper shuttle Didcot-Oxford-Banbury could be however be considered to be consistent with the principles expounded within broader cancellation announcement, with the possible exception of the shuttles. East-West is possibly the additional factor in the mix.
Logged
ChrisB
TransWilts Member
Hero Member
******
Posts: 8367


View Profile Email
« Reply #168 on: July 23, 2017, 12:01:01 PM »

Agree with Stuving - Oxford-Didcot currently is pushed into CP6, whose HLOS is under current negotiation between NR, ORR & DfT. The DfT has noted an October 13 date for the SoFA (Statement of Funds Available) for CP6. NR & ORR then have to agree which projects meet the criteria for inclusion in that spending round.

Personally, I suspect this small add-on will make it into CP6, otherwise the work this weekend probably wouldn't have proceeded as it was needed prior to the wires going up.
« Last Edit: July 23, 2017, 12:07:00 PM by ChrisB » Logged
IndustryInsider
TransWilts Member
Hero Member
******
Posts: 5739


View Profile
« Reply #169 on: July 23, 2017, 12:21:16 PM »

Agree with ChrisB and Stuving regarding the position of the DfT and NR.

However, the work taking place at the moment is not connected with electrification directly but is part of the Oxford Corridor Enhancement scheme which provides more capacity between Didcot and Heyford through resignalling and improved track layouts.  It will eventually lead to Oxford PSB closing and control transferring to the Didcot TVSC next year.  After this stage of the work is complete there will be improved line speeds just south of the station as new crossovers are installed and there will be a couple of altered signal locations.

Provision for electrification is part of that work, but is not the reason for it.
Logged

To view my cab run over the new Reading Viaduct as well as a relief line cab ride at Reading just after Platforms 12-15 opened and my 'before and after' video comparison of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/1
ChrisB
TransWilts Member
Hero Member
******
Posts: 8367


View Profile Email
« Reply #170 on: July 23, 2017, 12:28:29 PM »

NR tweeted this yesterday - looks as though all track's been lifted

Logged
IndustryInsider
TransWilts Member
Hero Member
******
Posts: 5739


View Profile
« Reply #171 on: July 23, 2017, 12:34:45 PM »

Yes, all bar the down relief lifted south of the station yesterday.  Leaving Oxford heading south and the old 25mph crossover will be replaced with a 30mph one located nearer the station which should mean trains can pretty much leave the station on full power.  The 25mph speeds on the loop line (known ask the 'old main' to some) will increase to 60mph and there will also be another 25mph crossing replaced with a 40mph one for trains arriving at Platform 3 from the south.

I expect other enabling work for the future stages will also be completed and will report  back on what's been done.
Logged

To view my cab run over the new Reading Viaduct as well as a relief line cab ride at Reading just after Platforms 12-15 opened and my 'before and after' video comparison of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/1
ellendune
TransWilts Member
Hero Member
******
Posts: 2508


View Profile
« Reply #172 on: July 23, 2017, 12:43:02 PM »

So is this work all the changes south of the station that are on this plan of Oxford Corridor Phase 1?
Logged
didcotdean
Hero Member
*****
Posts: 605


View Profile
« Reply #173 on: July 23, 2017, 01:10:43 PM »

So who didn't turn up (or forgot) to open Oxford station in time for the Chiltern train this morning ...

Oxford Mail:
Quote
DOZENS of people were left stranded outside of Oxford Railway Station after staff failed to unlock the doors before the first train arrived.
More than 100 people were reportedly left queueing outside the main entrance after the error this morning.
They could only watch in despair as the first Chiltern service to London passed by the station oblivious to the hordes of passengers stuck behind the locked door.
Logged
ChrisB
TransWilts Member
Hero Member
******
Posts: 8367


View Profile Email
« Reply #174 on: July 23, 2017, 01:44:39 PM »

Hah! Several of us boarded that train at Bicester Village, all forecasting that no seats were likely - at it turned out, there were very few on the train & we were left with quizzical faces.....this explains it :-)
Logged
IndustryInsider
TransWilts Member
Hero Member
******
Posts: 5739


View Profile
« Reply #175 on: July 23, 2017, 04:11:34 PM »

So is this work all the changes south of the station that are on this plan of Oxford Corridor Phase 1?

Yes, the majority of those works are being done.  The West Midlands Sidings were removed a month or so ago.
Logged

To view my cab run over the new Reading Viaduct as well as a relief line cab ride at Reading just after Platforms 12-15 opened and my 'before and after' video comparison of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/1
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 10 11 [12]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by a customer of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link). Forum hosted by Well House Consultants