Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 11:35 28 Mar 2024
* Manhunt after stabbing in front of train passengers
- How do I renew my UK passport and what is the 10-year rule?
* Easter travel warning as millions set to hit roads
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
28th Mar (1988)
Formal end to carrying coffins by BR (link)

Train RunningCancelled
09:29 Weston-Super-Mare to London Paddington
10:15 London Paddington to Cardiff Central
10:30 London Paddington to Weston-Super-Mare
10:41 Cardiff Central to London Paddington
11:00 Bristol Temple Meads to London Paddington
11:05 Swindon to Westbury
11:16 London Paddington to Cardiff Central
11:23 Weston-Super-Mare to London Paddington
11:30 London Paddington to Bristol Temple Meads
11:50 Cardiff Central to London Paddington
12:15 London Paddington to Cardiff Central
12:17 Westbury to Swindon
12:30 London Paddington to Weston-Super-Mare
13:15 Swindon to Westbury
14:19 Westbury to Swindon
15:14 Swindon to Westbury
Short Run
06:00 London Paddington to Penzance
06:05 Penzance to London Paddington
07:33 Weymouth to Gloucester
08:03 London Paddington to Penzance
09:50 Cardiff Central to London Paddington
10:35 London Paddington to Exeter St Davids
10:55 Paignton to London Paddington
11:12 Salisbury to Bristol Temple Meads
11:23 Portsmouth Harbour to Cardiff Central
12:03 London Paddington to Penzance
Delayed
07:10 Penzance to London Paddington
08:23 Portsmouth Harbour to Cardiff Central
08:35 Plymouth to London Paddington
08:48 London Paddington to Swansea
09:04 London Paddington to Plymouth
09:30 Weymouth to Gloucester
09:37 London Paddington to Paignton
09:51 Warminster to Gloucester
10:04 London Paddington to Penzance
13:03 London Paddington to Plymouth
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 28, 2024, 11:38:21 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[161] West Wiltshire Bus Changes April 2024
[91] would you like your own LIVE train station departure board?
[62] Return of the BRUTE?
[53] If not HS2 to Manchester, how will traffic be carried?
[49] Infrastructure problems in Thames Valley causing disruption el...
[38] Reversing Beeching - bring heritage and freight lines into the...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 54 55 [56] 57 58 ... 230
  Print  
Author Topic: Reading Station improvements  (Read 1356457 times)
Southern Stag
Hero Member
*****
Posts: 984


View Profile
« Reply #825 on: September 18, 2012, 16:31:43 »

Presumably up Westbury-London fast trains aren't actually going to use platform 8 much for now. Doing so would require them to go up the down main past the signal gantry, preventing any fast down services accessing platforms 7, 8 or 9.  For now I'd imagine where possible they'll cross to the up main at the west end of the station, using platform 10. That would leave platform 8 pretty much free for XC (Cross Country Trains (franchise)), down London-Westbury fast services can use 7 and down London-Didcot fast services can use 9.
Logged
Oxman
Transport Scholar
Hero Member
******
Posts: 423


View Profile
« Reply #826 on: September 18, 2012, 17:15:48 »

Not forgetting the Westbury - London stone trains and empty returns, of course. Routing options for these are much more restricted - they will have to use the main lines between Westbury Line Junction and Kennet Bridge. A wise old signaller in Reading panel once told me that they would always try to give the heavily loaded up trains a clear run through the area, even if it meant delaying Class 1s, because the time penalty for stopping and restarting was so huge - it would inevitably cause even greater delays.
Logged
bobm
Administrator
Hero Member
*****
Posts: 9809



View Profile
« Reply #827 on: September 18, 2012, 17:42:16 »

Wasn't it also a case that the length of them meant if they were stopped at one particular signal they brought the whole station area to a stand.
Logged
old original
Transport Scholar
Hero Member
******
Posts: 877


View Profile
« Reply #828 on: September 18, 2012, 17:52:05 »

for info.. apparently the next big engineering works which will severely affect train services at Reading are next Easter -  Maunday Thursday to the following Tuesday.
Logged

8 Billion people on a wet rock - of course we're not happy
Gordon the Blue Engine
Transport Scholar
Hero Member
******
Posts: 752


View Profile
« Reply #829 on: September 18, 2012, 19:07:21 »

II, thank you for posting these plans. Very interesting and a lot to absorb.

The Goods lines between Tilehurst East Junction and Reading West Junction are shown as being taken out as from Easter 2013, which is not good for us who use Oxford stoppers. Once an up Freightliner etc leaves Didcot East, it's got nowhere to be looped until after Reading West Junction, so if it has to wait for a path across the ML's at Reading West Junction it'll be sitting on the URL with my Turbo behind it.

Is Reading West Curve long enough to hold the longest Freights clear of Reading West J and Oxford Road J?  If not, regulation gets even more challenging.
Logged
coachflyer
Full Member
***
Posts: 69


View Profile
« Reply #830 on: September 18, 2012, 20:00:33 »

Just noticed that the Kennet Bridge loop will be made reversible.

Could be where xc services with a layover are sent to free up space in the station??
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5316


View Profile
« Reply #831 on: September 19, 2012, 11:59:24 »

for info.. apparently the next big engineering works which will severely affect train services at Reading are next Easter -  Maunday Thursday to the following Tuesday.

Was posted earlier, (in #641) on page 43 of this thread:

http://www.firstgreatwestern.info/coffeeshop/index.php?topic=6405.630

Paul

Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5316


View Profile
« Reply #832 on: September 19, 2012, 12:46:17 »

... but until then it looks like XC (Cross Country Trains (franchise))'s are most likely to use platform 8 - which in itself will block the up Westbury line, so that's another (temporary) restriction.

The 2013 Engineering Access Statement (formerly RotR) shows a couple of months late next year (Sept to November) with P7 closed (that'll be for building it out towards P8 as there'll be only the two tracks there eventually); this seems to further reduce the platforming options for XC through services to/from the south coast. I suppose though that having P9 as the only down main available towards both Didcot and Newbury (ie while P8 is blocked by a reversing 'through' XC service) is effectively no worse than the current situation where P7 is effectively the only down main platform?

AFAICS (As Far As I Can See) in the current timetable there are Southampton to Newcastle departures and Manchester to Bournemouth arrivals moving in the station area simultaneously - maybe their timetables will need tweaking a bit to separate them? 

The P7 closure is immediately followed by P8 being reduced to a 5 car length temporarily, I'd assume this is while the P8 platform edging is upgraded?

Paul   
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10095


View Profile
« Reply #833 on: September 19, 2012, 13:21:32 »

The 2013 Engineering Access Statement (formerly RotR) shows a couple of months late next year (Sept to November) with P7 closed (that'll be for building it out towards P8 as there'll be only the two tracks there eventually); this seems to further reduce the platforming options for XC (Cross Country Trains (franchise)) through services to/from the south coast. I suppose though that having P9 as the only down main available towards both Didcot and Newbury (ie while P8 is blocked by a reversing 'through' XC service) is effectively no worse than the current situation where P7 is effectively the only down main platform?

Could the temporary closure of P7 coincide with the re-opening of P11?  That could then be used for XC services (as well as other trains as the situation demands), and would give four platforms to cope with HSS (High Speed Services)/B&H (Berks and Hants - railway line from Reading to Taunton via Westbury) and reversing XC services.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
paul7575
Transport Scholar
Hero Member
******
Posts: 5316


View Profile
« Reply #834 on: September 19, 2012, 14:25:56 »

The 2013 Engineering Access Statement (formerly RotR) shows a couple of months late next year (Sept to November) with P7 closed (that'll be for building it out towards P8 as there'll be only the two tracks there eventually); this seems to further reduce the platforming options for XC (Cross Country Trains (franchise)) through services to/from the south coast. I suppose though that having P9 as the only down main available towards both Didcot and Newbury (ie while P8 is blocked by a reversing 'through' XC service) is effectively no worse than the current situation where P7 is effectively the only down main platform?

Could the temporary closure of P7 coincide with the re-opening of P11?  That could then be used for XC services (as well as other trains as the situation demands), and would give four platforms to cope with HSS (High Speed Services)/B&H (Berks and Hants - railway line from Reading to Taunton via Westbury) and reversing XC services.

Ah yes, the 2013 EAS does have P11 back into use by the end of August (26th) so that would provide a further solution but I've just noticed that P10 closes immediately after P11 re-opens, so that won't help after all... 

Paul
« Last Edit: September 19, 2012, 14:31:40 by paul7755 » Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10095


View Profile
« Reply #835 on: September 19, 2012, 14:44:35 »

Darn!  Don't suppose you could provide a link to the 2013 EAS?  I can only find the 2012 one the NR» (Network Rail - home page) website.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
paul7575
Transport Scholar
Hero Member
******
Posts: 5316


View Profile
« Reply #836 on: September 19, 2012, 14:56:53 »

Darn!  Don't suppose you could provide a link to the 2013 EAS?  I can only find the 2012 one the NR» (Network Rail - home page) website.

http://www.networkrail.co.uk/browse%20documents/Rules%20Of%20The%20Route/EASyearYY/70wrYY.pdf
Logged
mjones
Transport Scholar
Hero Member
******
Posts: 408


View Profile
« Reply #837 on: September 20, 2012, 09:15:22 »

Anyone know any more about what is happening with Platform 6? It continues to languish largely unused, except for a few peak services, but I've not seen any work taking place on or near it for some time.
Logged
BerkshireBugsy
Hero Member
*****
Posts: 1640


Berkshire Bugsy Jr


View Profile
« Reply #838 on: September 20, 2012, 10:05:47 »

Anyone know any more about what is happening with Platform 6? It continues to languish largely unused, except for a few peak services, but I've not seen any work taking place on or near it for some time.

Certainly my experience regarding P6 (as a daily user) is it is rarely used not because it is undergoing work but because (in my mind) if P4 is in use then the logical place to park a second diagram is P5 and vice verca. I am guessing it is "simpler" in terms of routing to place an incoming service on p5 if p4 is busy but I don't have enough knowledge to understand if the incoming train routing to these platforms (at a local level) is manual or automatic.
Logged
mjones
Transport Scholar
Hero Member
******
Posts: 408


View Profile
« Reply #839 on: September 20, 2012, 10:43:04 »

Maybe, though from previous discussions on this P4 and P5 share an approach track (just like the old 4a/4b used to), whereas a train could depart from P6 at the same time as one arrives at either of P4 or P5. I'm not sure what the benefit has been of the extra platform- other than a longer walk to P4 and more missed connections!

Also, P4 gets rather crowded, which is more of a problem for North Downs trains, which arrive and then leave very quickly, so passengers wanting to board conflict with passengers alighting, than for Waterloo trains which lay over for half an hour so passenger flows are one way.  One approach would be to put Waterloo trains on P4 and P6, with North Downs on P5, benefiting from the greater space available on P5/P6.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 54 55 [56] 57 58 ... 230
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page