Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 06:55 20 Apr 2024
- Some Wales roads to revert to 30mph after backlash
- BBC presenter reports racist abuse on London train
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningCancelled
05:15 Plymouth to Penzance
06:38 Weymouth to Gloucester
07:40 Penzance to Plymouth
08:15 Penzance to London Paddington
18:52 London Paddington to Great Malvern
19:19 Carmarthen to Swansea
Short Run
06:30 Cardiff Central to Portsmouth Harbour
06:50 Frome to Filton Abbey Wood
07:22 Exeter St Davids to Penzance
14:48 London Paddington to Carmarthen
21:07 Gloucester to Bristol Temple Meads
Delayed
05:25 Swansea to London Paddington
05:30 Bristol Temple Meads to London Paddington
06:28 Bristol Parkway to Weston-Super-Mare
06:30 Bristol Temple Meads to London Paddington
06:34 Great Malvern to Bristol Temple Meads
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2024, 07:03:22 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[276] Somerset and Dorset Devonshire Tunnel flood
[265] Rail to refuge / Travel to refuge
[45] Rail delay compensation payments hit £100 million
[40] Problems with the Night Riviera sleeper - December 2014 onward...
[19] Difficult to argue with e-bike/scooter rules?
[18] Signage - not making it easy ...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 61 62 [63] 64 65 ... 230
  Print  
Author Topic: Reading Station improvements  (Read 1361817 times)
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #930 on: November 09, 2012, 09:39:36 »

It's diiifcult to visualise the final positions of the platform faces for P7 - P10 looking down from the footbridge, but I think they may all be moving.  So maybe the signal above P10 may need to be moved if/when P10 gets realigned, and the wires go up. 

Yes, when I mentioned the P10 line I neglected to include the point that the new signal seems to be positioned above and to the left of the future position of the P10 track, which wll be slewed out at the east end of the station, ie extended in line with the current temporary platform.  You can see the blockwork beyond the country end of the platform which denotes the eventual alignment.

In the case of the P8 and P9 island though, there is no fundamental change to the future position in terms of north/south alignment on the site.  Firstly I was told at one of the very early briefing sessions that they would only be having their surfaces and edge copings updated in situ, but this is also confirmed for all practical purposes by the existence of the new canopies sitting vertically above the existing platform edges.  The operational lengths of the platforms may shift slightly though, meaning that there may be areas out of use at the London end, because it is intended that the HST (High Speed Train) (and presumably IEP (Intercity Express Program / Project.)) stopping position will be equalised either side of the new 'transfer deck'.  Will be interesting to see if the London end of the island's surface is overhauled to the same standard as the rest - in fact might it be slightly shortened?

Paul
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #931 on: November 09, 2012, 13:23:26 »

.... and stood on Platform No.8 under the new transfer deck yesterday morning it suddenly hit me what a huge station its going to be when its all finished Shocked
Logged
Boppy
Sr. Member
****
Posts: 182


View Profile
« Reply #932 on: November 12, 2012, 18:06:36 »

Track now properly laid up the ramp to the east of the station on the north side.

Logged
Jason
Hero Member
*****
Posts: 543


View Profile
« Reply #933 on: November 13, 2012, 13:53:59 »

Various sections of the P1/P2 canopy 'selectively removed' leaving the cross struts to P3/P7 in place still.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #934 on: November 14, 2012, 12:40:10 »

Thinking back to last weeks discussion about the road area outside the new southern concourse, webcam 2/2 is showing this morning (13th about 10-12 am) that they've broken through into the void space below the existing road surface.  We'll probably get an idea over the next few days how it will look when fully removed and lowered to ground level, as they probably won't take long to get rid of the waste...

Track now properly laid up the ramp to the east of the station on the north side.

...and a Kirov rail crane practically alongside the multi story carpark just now - visible in background of above webcam. 

All be over by Christmas...  Grin

Paul
« Last Edit: November 14, 2012, 13:42:05 by paul7755 » Logged
Gordon the Blue Engine
Transport Scholar
Hero Member
******
Posts: 752


View Profile
« Reply #935 on: November 15, 2012, 15:17:29 »

I was looking down on the new islands and it does seem the canopied areas are very short.  Vast tracts of  the London ends are uncovered.  You come down the escalator, theres's a short canopy, then nothing. The block paving has left no spaces for any columns for canopies that haven't appeared yet.

Even, as Paul says, the stopping position for trains is centred under the new footbridge, there seems to me that there will be quite a bit of a long turbo, an HST (High Speed Train) or IEP (Intercity Express Program / Project.) out in the open.  Does FGW (First Great Western) expect its 1st class passengers to wait in the rain, or to huddle under the canopy and make a run for it when the train arrives? (not very good for H&S (Health and Safety)).

Hopefully I'm wrong, and that the canopies will be extended once the existing footbridge is demolished.
Logged
Southern Stag
Hero Member
*****
Posts: 984


View Profile
« Reply #936 on: November 15, 2012, 18:32:07 »

The videos on the Network Rail project giving artists impressions' of the finished project have shorter canopies on the new relief line platforms but full length canopies on the main line platforms. Whether this actually happens remains to be seen as none of the main line platforms have their new canopies yet.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #937 on: November 15, 2012, 19:02:44 »

The canopies seem as per the planning application drawings, on the reliefs they are about 150m on a 250m platform.  They extend west about the same distance as the P8/9 and P10/11 canopies.  They do appear short relative to the east end perhaps because the existing islands are somewhat longer than them, and maybe also look short because of the end on view - the sloping roof over the escalators (yet to be fitted) accounts for a significant proportion of the length as far as I can work out.

I'd also point out that it is very unusual for full length canopies to be provided, taking rail the network as a whole...

I've attached the platform canopy level planning drawing below...

Paul
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #938 on: November 15, 2012, 19:09:33 »

The videos on the Network Rail project giving artists impressions' of the finished project have shorter canopies on the new relief line platforms but full length canopies on the main line platforms. Whether this actually happens remains to be seen as none of the main line platforms have their new canopies yet.

The west end canopy of P8/9 is at its full length already, the steelwork 'corners' are both in place.  As per my other post, that roughly marks the west end limit of all four of the main canopies (except P1/2/3/7, which surprisingly are shown slightly shorter)...

Paul
Logged
Jonty
Full Member
***
Posts: 42


View Profile
« Reply #939 on: November 15, 2012, 19:29:21 »

Does anyone know whether there will be a First Class Lounge at the new station?
Logged
JayMac
Data Manager
Hero Member
******
Posts: 18918



View Profile
« Reply #940 on: November 15, 2012, 19:56:10 »

That would probably depend on who the next Greater Western franchisee is.

I think it unlikely if First Group retain the franchise, having closed the lounge at Bristol Temple Meads and only reluctantly continued to nominally operate (through RailGourmet) the lounge at Cardiff Central. Stagecoach have opened new lounges on their East Midlands Trains franchise so they may consider it for other stations on Greater Western should they win the franchise. National Express seemed committed to providing First Class Lounges when they briefly ran the InterCity East Coast franchise so they may be a possible. As for Arriva, anybody's guess.
Logged

"Build a man a fire and he'll be warm for the rest of the day. Set a man on fire and he'll be warm for the rest of his life."

- Sir Terry Pratchett.
IndustryInsider
Data Manager
Hero Member
******
Posts: 10116


View Profile
« Reply #941 on: November 16, 2012, 10:53:08 »

I've attached the platform canopy level planning drawing below...

Thanks.  That also answers a question I had about the provision and location of escalators, stairs and lifts.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #942 on: November 16, 2012, 13:18:55 »

As Graham has allowed a slightly larger file size for attachments, here's the platform level drawing.  Should allow hours of fun as people try and find a location for a first class lounge, as well...   Grin

Paul

 
Logged
Chris from Nailsea
Administrator
Hero Member
*****
Posts: 17876


I am not railway staff


View Profile Email
« Reply #943 on: November 16, 2012, 20:26:55 »

Thanks, Paul.  Wink
Logged

William Huskisson MP (Member of Parliament) was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: stop, look, listen.

"Level crossings are safe, unless they are used in an unsafe manner."  Discuss.
Gordon the Blue Engine
Transport Scholar
Hero Member
******
Posts: 752


View Profile
« Reply #944 on: November 17, 2012, 16:40:15 »

The canopies seem as per the planning application drawings, on the reliefs they are about 150m on a 250m platform.  They extend west about the same distance as the P8/9 and P10/11 canopies.  They do appear short relative to the east end perhaps because the existing islands are somewhat longer than them, and maybe also look short because of the end on view - the sloping roof over the escalators (yet to be fitted) accounts for a significant proportion of the length as far as I can work out.

I'd also point out that it is very unusual for full length canopies to be provided, taking rail the network as a whole...

I've attached the platform canopy level planning drawing below...

Paul

Pual, thanks again for being the provider of hard information.  My point remains that platforms without canopies reflects an assumption that it's OK for people to get on and off trains in the wet.  And that insufficient attention has been given to the H&S (Health and Safety) and station dwell time issues associated with people congregating in an area shorter than the train they intend boarding. 

I accept some canopies at some stations (eg Pangbourne) have been shortened over the years because of maintenance issues, but I can't see any excuses for installing short canopies on new-build platforms.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 61 62 [63] 64 65 ... 230
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page