Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 13:55 20 Apr 2024
- Three men killed in retail park car crash named
* Some Wales roads to revert to 30mph after backlash
- Three men killed in retail park car crash identified
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningCancelled
13:07 Salisbury to Bristol Temple Meads
18:52 London Paddington to Great Malvern
19:19 Carmarthen to Swansea
Short Run
10:03 London Paddington to Penzance
11:09 Gloucester to Weymouth
14:48 London Paddington to Carmarthen
15:30 Weymouth to Gloucester
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2024, 14:02:29 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[279] Somerset and Dorset Devonshire Tunnel flood
[220] Rail to refuge / Travel to refuge
[109] On reservations, fees and supplements - Interrail
[37] Rail delay compensation payments hit £100 million
[33] Problems with the Night Riviera sleeper - December 2014 onward...
[16] Difficult to argue with e-bike/scooter rules?
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 3 4 [5] 6 7 ... 230
  Print  
Author Topic: Reading Station improvements  (Read 1361854 times)
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #60 on: July 30, 2010, 17:45:35 »

This will also require trackside running boards as the driver changes ends *outside* of the HST (High Speed Train)...

Safe walking Route. Any place where Drivers change end outside the train will be risk assessed and approved as part of the project. The safe walking route can be the cess if it is level and no adjacent running line.



Can't the driver change ends inside the train?
oooo too much like hard work scrabbling through a packed and standing train
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Ollie
Data Manager
Hero Member
******
Posts: 2302


View Profile
« Reply #61 on: July 30, 2010, 21:11:19 »

oooo too much like hard work scrabbling through a packed and standing train
Or perhaps it's quicker, than walking through the train when it has passengers on it..
As said driver will need to get off anyway to check lights at each end..
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10116


View Profile
« Reply #62 on: July 31, 2010, 01:05:32 »

If it was a Turbo (2 or 3-car) they'd probably change ends without leaving the train ('proving' lights in the cab confirm what the head/tail lights are showing).  Although it is possible to change ends on a HST (High Speed Train) without leaving the train, you'd have to be pretty desperate to want to do so, as squeezing through the engine room of two cabs with engines blaring away would not be pleasant on either the heat or noise front!
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
woody
Hero Member
*****
Posts: 525


View Profile
« Reply #63 on: July 31, 2010, 09:57:18 »

FGW (First Great Western) will be serving Waterloo during the blockade. But only with West of England services.
Read on another forum that quote "A notice has gone up that the guards will be starting route learning soon."
Can anyone confirm or deny?
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12357


View Profile Email
« Reply #64 on: August 02, 2010, 11:30:39 »

The reversals at Aynho will have to wait, I suspect!
Logged
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #65 on: August 26, 2010, 18:55:50 »


Slight deviation.

Alighting at Reading last night off the 1922 to Hereford, in the midst of a downpour, many customers had to leap through sheets of water overflowing from the unmaintained platform canopy gutters. No pensioners fortunately (except me!). Thoughtfully, the gutters contrived to overflow at just the 23 m car lengths needed and the train drew up so that the doors were precisely sited under the respective Niagaras.

Risking prosecution (you may be accused of swearing etc), I suggested to platform staff, including a supervisor that this was a safety issue as customers could not step down safely and water was flowing freely down both sides of the open doors into the electric locking mechanism...

I was told that it was a Network Rail station and that nothing would be done as it was all to be rebuilt. It wasn't a safety issue of course, until someone was injured....

If all NR» (Network Rail - home page) and FGW (First Great Western)'s horses and men can't economically attach a gutter to a bargeboard at the right fall and keep the downpipe clear, then we are wasting our time thinking of new stations, electrification etc.

Isn't Reading General is a FGW site?

OTC
Logged
Oxman
Transport Scholar
Hero Member
******
Posts: 423


View Profile
« Reply #66 on: August 26, 2010, 19:42:20 »

Reading station is leased from NR» (Network Rail - home page) by FGW (First Great Western). NR are responsible for maintenance of the canopies.

Its unlikely that the gutter is the problem. In common with many other stations the drains are just not adequate in a torrential downpoor - rain water backs up, and overflows from the gutters. You probably noticed that the back of platform 4 becomes a lake as water floods out of the drainpipes and the drain is unable to cope.

We can only hope that the rebuild starts some way underground, with adequate drainage!
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10116


View Profile
« Reply #67 on: August 27, 2010, 01:10:42 »

In common with many other stations the drains are just not adequate in a torrential downpoor - rain water backs up, and overflows from the gutters.

And not just stations - the drainage on many public buildings/surfaces can't cope with some of the heaviest bursts of rain like some of the stuff that was coming down from the heavens last night.  Like with the safety hazards that heavy snowfall cause - I'm thinking back to the fact that some pavements were icy hazards for well over a week last winter - I think you just have to shrug your shoulders and accept that certain conditions will inevitably cause your own safety to be compromised slightly on occasions.  Look on the bright side, at least you weren't trying to pitch a tent at Reading festival!
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ReWind
Hero Member
*****
Posts: 341


View Profile
« Reply #68 on: August 27, 2010, 09:11:47 »

A bit like platform 7 at Bristol TM(resolve) then.  Grin
Logged

Here, there and Everywhere!!
SDS
Hero Member
*****
Posts: 772


Badgerline


View Profile
« Reply #69 on: August 28, 2010, 00:54:11 »

You should see PAD» (Paddington (London) - next trains) when it rains.
plat 3 london end under the massively huge roof, it leaks badly.
plat 1 country end it is a downpour.
plat 6/7 are fine, but thats cos hex get what they want.
plat 8/9 is a running river
10 is fine
11 turns into a river, right where the pax run for trains.
13/14 being rebuilt by crossrail.

Logged

I do not work for FGW (First Great Western) and posts should not be assumed and do not imply they are statements, unless explicitly stated that they are, from any TOC (Train Operating Company) including First Great Western.
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #70 on: August 28, 2010, 10:07:07 »

You should see PAD» (Paddington (London) - next trains) when it rains.
plat 3 london end under the massively huge roof, it leaks badly.
plat 1 country end it is a downpour.
plat 6/7 are fine, but thats cos hex get what they want.
plat 8/9 is a running river
10 is fine
11 turns into a river, right where the pax run for trains.
13/14 being rebuilt by crossrail.

The roof at Padd deals with heavy rain quite well given the age of it's drainage, part of the problem is and always has been is the way the Victorians built the drains, the pipes away from the down pipes (the down pipes are internal to the columns) are too small and have bends that silt up quickly.  When I first worked at Padd in the late 70's the District Civil Engineer had a team of men who spent quite a lot of their year cleaning out the roof gutters and gullies
To modify the drainage would mean virtually digging the whole station up this one reason way 6 & 7 is dryer because the drains were renewed when the HEX (now disused) baggage tunnel was built
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
smokey
Hero Member
*****
Posts: 1129


View Profile
« Reply #71 on: August 28, 2010, 10:40:42 »

Reading station is leased from NR» (Network Rail - home page) by FGW (First Great Western). NR are responsible for maintenance of the canopies.

Its unlikely that the gutter is the problem. In common with many other stations the drains are just not adequate in a torrential downpoor - rain water backs up, and overflows from the gutters. You probably noticed that the back of platform 4 becomes a lake as water floods out of the drainpipes and the drain is unable to cope.

We can only hope that the rebuild starts some way underground, with adequate drainage!

On today's Railway whilst NR own the Stations maintenance, painting etc is done by FGW or it's contractors up to I believe 2.5 m high then NR take over Except for lighting and Guttering which is a FGW problem, but as there is no FGW maintenance programm to keep guttering clean problems occur.
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #72 on: August 28, 2010, 12:00:20 »

But if you point out there are problems with blocked gutters to them, they usually do something about. I emailed FGW (First Great Western) customer services about water pouring through the platform 2 canopy at Oxford in several places early this year or late last year and the next time I was there when there was a torrential downpour (only a week or two later) it was clear someone had been up top and cleared the gutters and fallpipes.

Paddington is entirely NR» (Network Rail - home page)'s responsibility as a major station. Presumably matters at the platforms under under span four will be improved by the current restoration work and removal of the crash deck.
Logged
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #73 on: August 29, 2010, 22:45:01 »


It's one thing for customers to get wet when it rains.

It's quite another to make them pass through a vertical sheet of water caused by neglect.

Just removing the canopy gutters would reduce the problem, as water would not then be chanelled from a wide area onto the carriage doorways.

Today's Engineers seem lost if something can't be done by Autocad, Microsoft Project, or FEA.

Well done at Paddington for trying, though

Drying nicely,

OTC

Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10116


View Profile
« Reply #74 on: August 30, 2010, 11:08:57 »

Presumably matters at the platforms under under span four will be improved by the current restoration work and removal of the crash deck.

At the moment there's not really a roof over span 4 to speak of whilst it's being renovated.  Temporary plastic and metal sheeting is stopping the worst of the water getting through, but there are a few spots which are really bad when it rains, and the contractors have their staff constantly clearing water off of the platforms when it has rained heavily.  This time next year the place will be transformed though and hopefully it'll be nice and dry because those nice shiny tiled slabs on the floor and water don't mix too well.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 3 4 [5] 6 7 ... 230
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page