Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 18:35 24 Apr 2024
- Further delays to repairs on main Arran ferry
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

No 'On This Day' events reported for 24th Apr

Train RunningCancelled
16:59 Gatwick Airport to Reading
Short Run
15:28 Weymouth to Gloucester
17:30 Warminster to Bristol Temple Meads
Delayed
An additional train service has been planned to operate as shown 18:10 Bristol Temple Meads to Gloucester
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 24, 2024, 18:41:53 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[125] Lack of rolling stock due to attacks on shipping in the Red Se...
[119] Theft from Severn Valley Railway
[67] Where have I been?
[66] 2024 - Service update and amendment log, Swindon <-> Westbury...
[56] Death of another bus station?
[49] Penalty fares on Severn Beach Line
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Platform 2 at Swindon  (Read 4034 times)
Railfriend
Full Member
***
Posts: 40


View Profile
« on: March 17, 2010, 13:15:53 »

I was passing through Swindon on a Paddington-Plymouth train a few days ago, and thought I noticed that Platform 2 at Swindon was either being re-built or dismantled.
Platform 2 is the stub end platform between, and at the west end of, the two island platforms.  Does anyone know anything of this?  Thanks.
Logged
dog box
Hero Member
*****
Posts: 653


View Profile
« Reply #1 on: March 17, 2010, 19:07:03 »

Platform 2 is neither being rebuilt or dismantled, what you saw was a lot of contractors supplies/equipment which is there for the work that is being undertaken on The Training School building on plt1/3
Logged

All postings reflect my own personal views and opinions and are not intended to be, nor should be taken as official statements of first great western or first group policy
Railfriend
Full Member
***
Posts: 40


View Profile
« Reply #2 on: March 17, 2010, 19:54:44 »


Thanks, dog box.  I guess I didn't have time to take in just what was going on.  Thought perhaps platform 2 was being modified as part of the pending Swindon-Kemble redoubling.  I wonder if any changes will be made to Swindon Station as part of the redoubling.  One change that seems reasonable to me is to add points so that trains on platform 4 can be directed onto the Swindon-Gloucester line.  Anyone know if that would present a technical problem?  I've heard that the GRIP4 feasibility study on the redoubling will be finished by the end of March, and will be sent immediately to the Dept of Transport, and that barring an early election an announcement can be expected in April.
Logged
John R
Hero Member
*****
Posts: 4416


View Profile
« Reply #3 on: March 17, 2010, 20:08:36 »

I suspect that might be a tight squeeze, and the extra 2 crossovers and associated resignalling required would add quite a lot to the cost.

It's not really needed either, as both 3 and 1 (I believe) can be used for Kemble bound trains. In practice, a down Kemble train will be routed into 3 and an up London train approaching from Wootton Bassett will be routed into 1 if it's going to conflict.

In the other direction, for some very curious reason this morning the 0835 to London (ex Cheltenham) was put into 3 whilst the 0841 (ex Exeter) had to use 1. Couldn't quite work out why that might be, as it created a conflicting movement when there needn't be one.

Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page