ChrisB
|
 |
« Reply #120 on: October 01, 2011, 06:05:57 PM » |
|
Optimist! :-)
|
|
|
|
|
Logged
|
|
|
|
|
lhrdave
|
 |
« Reply #121 on: October 03, 2011, 11:04:50 AM » |
|
I had been under the impression for some time that Crossrail would call at all stations, which I thought would increase journey times. But looking at that link from Crossrail, I see that just as now, some trains will not call at all stations.
I hope they increase the off peak frequencies for West Drayton and beyond. 4tph for Heathrow + 4tph Express to Heathrow does seem excessive. The existing Connect services to Heathrow empty out at Hayes leaving only a few people continuing.
|
|
|
|
|
Logged
|
|
|
|
|
IndustryInsider
|
 |
« Reply #122 on: October 03, 2011, 11:17:11 AM » |
|
It's been mentioned before, but I'd probably wager a small amount of money on Heathrow Express, at least in its current form, ceasing to exist after Crossrail.
|
|
|
|
|
Logged
|
|
|
|
|
Zoë
|
 |
« Reply #123 on: October 05, 2011, 01:27:22 PM » |
|
I had been under the impression for some time that Crossrail would call at all stations, which I thought would increase journey times. But looking at that link from Crossrail, I see that just as now, some trains will not call at all stations.
I hope they increase the off peak frequencies for West Drayton and beyond.
West Drayton would I expect be served by the 2 tph Paddington to Reading FGW service in addition to the 2 tph Crossrail service. It had been planned to run more than 2 tph off peak to Maidenhead but the additional paths were rejected by the ORR. Even if existing frequencies are retained west of Paddington there will still likely be an increase in capacity due to longer trains.
|
|
|
|
|
Logged
|
|
|
|
|
IndustryInsider
|
 |
« Reply #124 on: October 18, 2011, 10:02:01 AM » |
|
A working group has been set up by the business membership organisation London First to look at the Crossrail 2 scheme, which has been proposed to run from the Chelsea to Hackney areas: http://www.london-first.co.uk/news/detail.asp?record=227Two railway heavyweights are part of the group, the chairman is a chap called Andrew Adonis, who you may have heard of! First's CEO Tim O'Toole involved as well.
|
|
|
|
|
Logged
|
|
|
|
|
paul7755
|
 |
« Reply #125 on: October 18, 2011, 11:32:59 AM » |
|
You certainly get the impression from the London and SE RUS, which TfL have had a big input to as well, that no one seriously believes Crossrail 2 will be built as a simple tube line, as often previously described.
I think people in authority are definitely coming round to the idea of it taking over the SWML inner suburbans inbound from Raynes Park, and connecting them to somewhere in the North East, whether that is a branch of the Central Line, or part of the West Anglia mainline remains to be seen. If it is ever successfully argued that Crossrail 1 should run to Reading, then you might also expect somewhere like Woking to be a target.
I also think if you are going to the trouble of a new tunnel under London it may as well be for proper sized 200/240 m trains, we've probably seen the last of 'tube trains' for new construction...
Paul
|
|
|
|
|
Logged
|
|
|
|
|
|
|
Electric train
|
 |
« Reply #127 on: December 14, 2011, 05:59:05 PM » |
|
On your way into Padd as you go past the old goods shed at Westbourne Park (where the gantry crane has been erected) just to the East of this you can see the first of the TBM cutting heads being put together it is laying flat on the ground.
|
|
|
|
|
Logged
|
I work for the largest employer in the Rail Industry. Electrification is what I do
Swindon engineering - if 3/8th steel plate is enough use 7/16th just in case.
George Jackson Churchward a true Engineer
|
|
|
|
paul7755
|
 |
« Reply #128 on: December 14, 2011, 08:25:14 PM » |
|
On your way into Padd as you go past the old goods shed at Westbourne Park (where the gantry crane has been erected) just to the East of this you can see the first of the TBM cutting heads being put together it is laying flat on the ground.
I hope they've chained it securely to a lamp post, what with these being boom times for 'metals recycling'...  Paul
|
|
|
|
|
Logged
|
|
|
|
|
Electric train
|
 |
« Reply #129 on: December 14, 2011, 08:53:35 PM » |
|
On your way into Padd as you go past the old goods shed at Westbourne Park (where the gantry crane has been erected) just to the East of this you can see the first of the TBM cutting heads being put together it is laying flat on the ground.
I hope they've chained it securely to a lamp post, what with these being boom times for 'metals recycling'...  Paul Would have to be a mahuesive lamp post 
|
|
|
|
|
Logged
|
I work for the largest employer in the Rail Industry. Electrification is what I do
Swindon engineering - if 3/8th steel plate is enough use 7/16th just in case.
George Jackson Churchward a true Engineer
|
|
|
|
paul7755
|
 |
« Reply #130 on: December 15, 2011, 01:32:18 PM » |
|
|
|
|
|
|
Logged
|
|
|
|
|
IndustryInsider
|
 |
« Reply #131 on: December 15, 2011, 04:28:09 PM » |
|
Interesting reading, Paul. Thanks.
|
|
|
|
|
Logged
|
|
|
|
|
Boppy
|
 |
« Reply #132 on: January 20, 2012, 10:13:00 AM » |
|
Looks like 2 pieces of the tunnelling machine have arrived alongside the approach to Paddington.
There is a large white tent next to them too. I guess this is the staging area where all the separate parts will be put together.
|
|
|
|
|
Logged
|
|
|
|
|
paul7755
|
 |
« Reply #133 on: January 20, 2012, 12:16:33 PM » |
|
There is a large white tent next to them too...
That'll probably be anti-capitalist protesters evicted from the city...  Paul
|
|
|
|
|
Logged
|
|
|
|
|
|
|