Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 12:35 19 Apr 2024
* Children among eight dead in Russia strike on Ukraine
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
19th Apr (1938)
Foundation, Beatties of London (link)

Train RunningCancelled
11:23 Weston-Super-Mare to London Paddington
12:54 Filton Abbey Wood to Bristol Temple Meads
13:04 Bristol Temple Meads to Filton Abbey Wood
13:51 Filton Abbey Wood to Bristol Temple Meads
Short Run
09:27 Carmarthen to London Paddington
16:31 Barnstaple to Axminster
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 19, 2024, 12:39:29 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[149] Rail to refuge / Travel to refuge
[137] Rail delay compensation payments hit £100 million
[56] Signage - not making it easy ...
[11] IETs at Melksham
[10] Ferry just cancelled - train tickets will be useless - advice?
[9] From Melksham to Tallinn (and back round The Baltic) by train
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 9 10 [11] 12 13 ... 114
  Print  
Author Topic: Crossrail/Elizabeth Line. From construction to operation - ongoing discussion  (Read 591112 times)
broadgage
Transport Scholar
Hero Member
******
Posts: 5408



View Profile
« Reply #150 on: September 19, 2011, 15:04:34 »


What a ridiculous statement to make.  The seating layout will be specified in the ITT (Invitation to Tender), not chosen by Bombardier.

Paul

No agree  but TFL (Transport for London) will have alot to say about the ITT and they have been going for longitudinal seats in both the 378 and the new S stock etc.

As pointed out, the train builder does not choose the seating layout.

BUT experience of other new trains suggests that the seating layout chosen will be a backward step.
Either longitudinal with mainly standing space, or at best high density bus style with minimal legroom.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
ChrisB
Transport Scholar
Hero Member
******
Posts: 12357


View Profile Email
« Reply #151 on: September 19, 2011, 15:07:33 »

S-Stock layout - long distance, Maidenhead to Abbey Wood....
Logged
anthony215
Hero Member
*****
Posts: 1260


View Profile Email
« Reply #152 on: September 20, 2011, 18:16:13 »

The thameslink order looks to be getting delayed now:

http://www.railnews.co.uk/news/general/2011/09/13-now-dft-faces-legal-challenge.html

This is going to cause a knock on effect for Northern and FGW (First Great Western)

Maybe they should have just given the contract to Hitachi to build at their new uk plant. Are we going to see a challnge to IEP (Intercity Express Program / Project.) now?
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #153 on: September 20, 2011, 18:27:54 »

That article is most definitely NOT announcing a delay - and AFAICT (as far as I can tell) the DfT» (Department for Transport - about) is not yet 'facing a legal challenge'.  The article is discussing what might happen if a trade union does happen to succeed in its call for a judicial review. That is by no means a foregone conclusion.
 
I suggest you read the article again properly...

Paul
Logged
anthony215
Hero Member
*****
Posts: 1260


View Profile Email
« Reply #154 on: September 20, 2011, 18:33:05 »

Yes i just posted the link after seing it posted on uk railforums and others.

Sorry about that.

Personallyy i think Bombardier should just accept it and move on as they said they were planning on laying workers off even if they had won the order. Hopefully Bombardier will get their house in order for  the crossrail bid.
Logged
Btline
Hero Member
*****
Posts: 4782



View Profile
« Reply #155 on: September 20, 2011, 19:35:00 »

Hopefully Bombardier will get their house in order for  the crossrail bid.

They need to up their game. The LM (London Midland - recent franchise) 172s were ordered in November 2007 and won't be fully delivered 4 years later. They were also allegedly plagued with problems during testing. I also think FCC (First Capital Connect)'s trains were delivered late and had teething problems. Shame, because I actually prefer their designs to Desiros.

Yes to British jobs for British workers, but we still need reliable trains for both Thameslink and Crossrail on time!
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10116


View Profile
« Reply #156 on: September 27, 2011, 19:14:07 »

The tunnel portals for the Royal Oak end of the Crossrail tunnel are pretty much complete.  Here is a picture I took this morning showing the work completed, with the slope down to the portal entrances which are just before Royal Oak LUL (London Underground Ltd) station which can be seen in the distance.

Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #157 on: September 27, 2011, 20:14:51 »

I've been wondering about the various new Crossrail junctions, but instead of spending hours searching through Crossrail's drawings I thought I'd just ask here.

There is definitely a new flyover at Airport Jn, so that both the main and reliefs have grade separation there.

There is definitely a new diveunder at Acton Yard, so that the up relief doesn't conflict with freight movements to/from the relief lines.

But, surely there has to be a further junction where the up relief line into Paddington crosses the down line from the Crossrail tunnels - is this to be grade separated?   Also, on current plans there is still the Westbourne Park turnback facility - for 14 tph.  Will that be between the running lines, or will it be on one side?

Loads of scope for flat junction conflicts along there, have they actually covered all the options?

Paul
 
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #158 on: September 27, 2011, 20:42:12 »

I've been wondering about the various new Crossrail junctions, but instead of spending hours searching through Crossrail's drawings I thought I'd just ask here.

There is definitely a new flyover at Airport Jn, so that both the main and reliefs have grade separation there.

There is definitely a new diveunder at Acton Yard, so that the up relief doesn't conflict with freight movements to/from the relief lines.

But, surely there has to be a further junction where the up relief line into Paddington crosses the down line from the Crossrail tunnels - is this to be grade separated?   Also, on current plans there is still the Westbourne Park turnback facility - for 14 tph.  Will that be between the running lines, or will it be on one side?

Loads of scope for flat junction conflicts along there, have they actually covered all the options?

Paul
 

As Crossrail will be the (virtually) sole user of the Relief Lines Crossrail trains will run straight into the tunnels from the Reliefs at Westbourne Park so no conflict as all other services will run on the Mains Lines 1 to 4 at Padd
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #159 on: September 27, 2011, 21:06:21 »

But whatever GW (Great Western) stopping service remains, and that's 6tph in the peaks according to Crossrail's current website,  it will still have to do a flat crossing to get past the Crossrail down lines somewhere west of Westbourne Park surely?

Paul

Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #160 on: September 27, 2011, 22:31:50 »

But whatever GW (Great Western) stopping service remains, and that's 6tph in the peaks according to Crossrail's current website,  it will still have to do a flat crossing to get past the Crossrail down lines somewhere west of Westbourne Park surely?

Paul


What stopping services?  If the West terminal remains at Maidenhead there will be Padd Slough Maidenhead stoppers only, if Crossrail terminates at Reading then the Maidenhead stop will go, the Greenfords will terminate in a new Bay at West Ealing all no Crossrail services will use Lines 1 to 4
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #161 on: September 28, 2011, 10:36:16 »

What stopping services?  If the West terminal remains at Maidenhead there will be Padd Slough Maidenhead stoppers only, if Crossrail terminates at Reading then the Maidenhead stop will go, the Greenfords will terminate in a new Bay at West Ealing all no Crossrail services will use Lines 1 to 4

I'm suggesting GW (Great Western) stopping services having to transfer from the reliefs to lines 1-4 to get into Paddington.

These:
 
Morning peak Crossrail services to Central London:
4 trains per hour from Heathrow Airport;
4 trains per hour from Maidenhead; and
2 trains per hour from West Drayton
 
Other operators services:
2 trains per hour from Reading calling at Twyford, Maidenhead, Slough, Hayes & Harlington and Ealing Broadway to Paddington;
2 trains per hour from Reading calling at Twyford, Maidenhead, Taplow, Burnham and terminating at Slough;
1 through train from Henley on Thames to Paddington; and
1 through train from Bourne End to Paddington

http://www.crossrail.co.uk/route/western-section/   (scroll down)

I have found a reasonable track diagram now - which presumably agrees with your earlier explanation?  But could be of academic interest eventually with all these proposals in the London and SE RUS (Route Utilisation Strategy) for additional Heathrow services, and a WCML (West Coast Main Line) connection.  Also, it does show the Westbourne Park reversing sidings between the Crossrail lines as I expected.

http://www.rail-reg.gov.uk/upload/pdf/s18-xrail-appx2_single_line_GW.pdf

Paul
« Last Edit: September 28, 2011, 10:41:37 by paul7755 » Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #162 on: September 28, 2011, 11:48:24 »

2 trains per hour from Reading calling at Twyford, Maidenhead, Taplow, Burnham and terminating at Slough;

Well that wrecks the Westbound service from Taplow it means to get anywhere West and North West one will have to change at both Maidenhead and Reading instead of just Reading.

Also the only services to London will be all stations!

Lets hope common sense prevails and Crossrail goes to Reading and they don't waste money on turnback sidings at Maidenhead. Hopefully the wires will up to Reading and we'll have had 319s in service long before the first Crossrail train pops it's head out of the tunnel.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #163 on: September 28, 2011, 12:49:19 »

2 trains per hour from Reading calling at Twyford, Maidenhead, Taplow, Burnham and terminating at Slough;

Well that wrecks the Westbound service from Taplow it means to get anywhere West and North West one will have to change at both Maidenhead and Reading instead of just Reading.

I only struck that line through because it doesn't go into Paddington, not because it isn't running...

Paul
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #164 on: September 28, 2011, 12:58:17 »

Sorry misunderstood, but it's still daft DaFT» (Department for Transport - critical sounding abbreviation I discourage - about) policy terminating Crossrail at Maidenhead
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 9 10 [11] 12 13 ... 114
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page