Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 23:15 18 Apr 2024
- Arrest over alleged Russia plot to kill Zelensky
- Dubai airport delays persist after UAE storm
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
18th Apr (1966)
Melksham Station closed (link)

Train RunningCancelled
23:08 Severn Beach to Bristol Temple Meads
23:09 Bristol Temple Meads to Westbury
23:33 Reading to Gatwick Airport
19/04/24 04:45 Redhill to Gatwick Airport
19/04/24 05:11 Gatwick Airport to Reading
Short Run
20:24 Exmouth to Cardiff Central
20:50 Bristol Temple Meads to Weymouth
22:36 Worcester Shrub Hill to Bristol Temple Meads
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 18, 2024, 23:20:07 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[176] Rail delay compensation payments hit £100 million
[71] Signage - not making it easy ...
[15] IETs at Melksham
[13] Ferry just cancelled - train tickets will be useless - advice?
[12] From Melksham to Tallinn (and back round The Baltic) by train
[12] New station at Ashley Down, Bristol
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2]
  Print  
Author Topic: What Cross Country used to look like.  (Read 8492 times)
smokey
Hero Member
*****
Posts: 1129


View Profile
« Reply #15 on: September 22, 2011, 10:48:29 »

I'd missed that post.
Logged
pbc2520
Full Member
***
Posts: 58


View Profile
« Reply #16 on: September 23, 2011, 20:54:04 »

I've just discovered this website:

http://www.1s76.com/

A fascinating history of the InterCity Cross Country services that used to run between the south-east and the north. Some surprising locations that used to get at least 1 InterCity train a day. Eastbourne, Lewes, Dumfries, Annan.....

That brings back some memories from the early 90s.  When travelling home from school at weekends, from Oxford to Southfields (Underground, near Wimbledon), I once found a cross country train direct to Clapham Junction, so took it.  Going by the timetables in the above link, it must have been running late because I would have been leaving about Saturday lunchtime.  That would also explain why I never managed to catch it again.

Interestingly, back in those days, Southfields was also a BR (British Rail(ways)) station (I think it even had the BR logo outside) but it had no mainline services.  I presume this was because BR empties would use the East Putney-Wimbledon section.  So you could actually buy a ticket from e.g. Oxford direct to Southfields, to the surprise of many ticket staff!  This worked well until, one day, I found myself with a ticket to Southfields station that was not valid for use on the Underground!  (You can't make it up...)  Next time I bought the ticket, I simply asked the ticket office to append a '+' symbol after the destination.  Problem solved!  Smiley
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #17 on: September 23, 2011, 21:36:53 »

Interestingly, back in those days, Southfields was also a BR (British Rail(ways)) station (I think it even had the BR logo outside) but it had no mainline services.  I presume this was because BR empties would use the East Putney-Wimbledon section. 

Thread drift alarm sounds...

Yes - the East Putney to Wimbledon section wasn't 'sold' (and it was only a token amount apparently) to LU until around '95 in the run up to privatisation, and up until then the stations appeared to be BR run, but as you say with no service.  However even today the line is 'operated' by NR» (Network Rail - home page) on behalf of LU, as the signalling is still to NR standards and controlled by Wimbledon ASC.  Oddly, the platforms in Wimbledon station used by LU are still owned by NR.  I'd be very surprised if NR weren't the responsible signalling maintainers as well - it would be unusual if there was a split responsibility.  Another oddity is that there are LU train stops on the stop signals, but SWT (South West Trains) don't have the train borne equipment - that goes against the popular belief that mainline stock cannot operate on LU without trip cocks being fitted.

Nowadays SWT still have a couple of passenger services that run over the route, (albeit at pretty unsocial times), mainly for route retention purposes, but at my last count there were also about 7 or 8 ECS (Empty Coaching Stock) moves during the interpeak period.  The main practical reason being that a train leaving Waterloo and heading down the main slow line through Earlsfield is on the wrong side of the tracks to get into Wimbledon Park depot, whereas a down train via Wandswoth Town, then East Putney and Southfields etc can be fitted into LU's offpeak timetable with little problem and obviously no crossing conflicts.

Once in a while during engineering work SWT have run a fairly frequent mainline service over the East Putney route - indeed a couple of years ago I did the route both ways - and LU ran a reduced service to make space for the diversions.  There is a major question mark over SWT's access though as the route is almost certainly going to be resignalled as part of the sub surface lines upgrade by 2018, and with an LU style ATO (Automatic Train Operation) system it is likely that SWT will no longer be welcome.

Paul

 

« Last Edit: September 23, 2011, 21:42:42 by paul7755 » Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #18 on: September 23, 2011, 21:56:06 »

Interestingly, back in those days, Southfields was also a BR (British Rail(ways)) station (I think it even had the BR logo outside) but it had no mainline services.  I presume this was because BR empties would use the East Putney-Wimbledon section. 

Thread drift alarm sounds...

Yes - the East Putney to Wimbledon section wasn't 'sold' (and it was only a token amount apparently) to LU until around '95 in the run up to privatisation, and up until then the stations appeared to be BR run, but as you say with no service.  However even today the line is 'operated' by NR» (Network Rail - home page) on behalf of LU, as the signalling is still to NR standards and controlled by Wimbledon ASC.  Oddly, the platforms in Wimbledon station used by LU are still owned by NR.  I'd be very surprised if NR weren't the responsible signalling maintainers as well - it would be unusual if there was a split responsibility.  Another oddity is that there are LU train stops on the stop signals, but SWT (South West Trains) don't have the train borne equipment - that goes against the popular belief that mainline stock cannot operate on LU without trip cocks being fitted.

Nowadays SWT still have a couple of passenger services that run over the route, (albeit at pretty unsocial times), mainly for route retention purposes, but at my last count there were also about 7 or 8 ECS (Empty Coaching Stock) moves during the interpeak period.  The main practical reason being that a train leaving Waterloo and heading down the main slow line through Earlsfield is on the wrong side of the tracks to get into Wimbledon Park depot, whereas a down train via Wandswoth Town, then East Putney and Southfields etc can be fitted into LU's offpeak timetable with little problem and obviously no crossing conflicts.

Once in a while during engineering work SWT have run a fairly frequent mainline service over the East Putney route - indeed a couple of years ago I did the route both ways - and LU ran a reduced service to make space for the diversions.  There is a major question mark over SWT's access though as the route is almost certainly going to be resignalled as part of the sub surface lines upgrade by 2018, and with an LU style ATO (Automatic Train Operation) system it is likely that SWT will no longer be welcome.

Paul

NR also provide all the traction power equipment, there was going to be a power supply segregation project so that NR London area conrail volts could be raise to 750 volts from the current 660 volts, to allow regen breaking and increased capacity on NR lines.   LU D stock can not handle the higher volts produced with regen peak of about 950 volts.  Common sense prevailed and the ORR» (Office of Rail and Road formerly Office of Rail Regulation - about) agreed to delay the NR regen until the new LU S stock enters service; leaving only the Waterloo & City line needing any new equipment to be installed in NR's W'loo substation
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #19 on: September 23, 2011, 22:44:03 »

NR» (Network Rail - home page) also provide all the traction power equipment, there was going to be a power supply segregation project so that NR London area conrail volts could be raise to 750 volts from the current 660 volts, to allow regen breaking and increased capacity on NR lines.   LU D stock can not handle the higher volts produced with regen peak of about 950 volts.  Common sense prevailed and the ORR» (Office of Rail and Road formerly Office of Rail Regulation - about) agreed to delay the NR regen until the new LU S stock enters service; leaving only the Waterloo & City line needing any new equipment to be installed in NR's W'loo substation

Interesting points - I'd seen that traction power segregation project in the CP4 (Control Period 4 - the five year period between 2009 and 2014) enhancement plan & updates - presumably not doing it (for the two relevant sections of the District anyway) saves quite a few ^millions given the sort of costs for this type of kit...

Paul
Logged
pbc2520
Full Member
***
Posts: 58


View Profile
« Reply #20 on: September 23, 2011, 22:46:33 »

Thanks for the background.  I suspect that any prospects of regular mainline services finally went with the removal of the bridge over Putney mainline for Wandsworth bound trains.  (On a positive note, there aren't houses on the trackbed yet.)
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #21 on: September 24, 2011, 08:09:05 »

NR» (Network Rail - home page) also provide all the traction power equipment, there was going to be a power supply segregation project so that NR London area conrail volts could be raise to 750 volts from the current 660 volts, to allow regen breaking and increased capacity on NR lines.   LU D stock can not handle the higher volts produced with regen peak of about 950 volts.  Common sense prevailed and the ORR» (Office of Rail and Road formerly Office of Rail Regulation - about) agreed to delay the NR regen until the new LU S stock enters service; leaving only the Waterloo & City line needing any new equipment to be installed in NR's W'loo substation

Interesting points - I'd seen that traction power segregation project in the CP4 (Control Period 4 - the five year period between 2009 and 2014) enhancement plan & updates - presumably not doing it (for the two relevant sections of the District anyway) saves quite a few ^millions given the sort of costs for this type of kit...

Paul
In the order of ^20M
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #22 on: September 24, 2011, 11:10:03 »

Thanks for the background.  I suspect that any prospects of regular mainline services finally went with the removal of the bridge over Putney mainline for Wandsworth bound trains.  (On a positive note, there aren't houses on the trackbed yet.)

There's a chap suggesting this route as a solution to some SWML (South Western Mail Line) capacity issues in the latest 'Rail' mag (on the letters page); he reckons that a few main line slows should be diverted via this route into the International platforms.  But there's a major gap in his proposal, namely how to get the down line across to the down main slow somewhere between Wimbledon Park and Wimbledon.  Of course it needs yet another new flyover - which is basically why the route never got used for that purpose in the first place, and up trains would end up with two conflicting crossings of the down LU service...

Paul
« Last Edit: September 25, 2011, 10:38:20 by paul7755 » Logged
pbc2520
Full Member
***
Posts: 58


View Profile
« Reply #23 on: September 25, 2011, 17:53:44 »

There's certainly a case for SW trains to Southfields during the Wimbledon fortnight - maybe the AELTC can stump up some of the funding required to maintain mainline services after future resignalling?  (I'm fairly certain they can afford it!)  At other times, it would just be a very useful link to Wandsworth/Clapham/Vauxhall/Waterloo, even if the service only started at Wimbledon Park, avoiding the crossing issue you cite.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page