Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 02:35 01 May 2025
 
- BBC Verify: How did rebels train to overthrow the President of Syria?
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 05/05/25 - Walk to Pilning
10/05/25 - BRTA Westbury
10/05/25 - Model Railway Show, Calne
13/05/25 - Melksham TUG / AGM

On this day
1st May (1964)
Helicopter service from Penzance to Scilly Isles starts

Train RunningNo cancellations or delays
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 01, 2025, 02:43:47 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[96] Cash payments for transport services
[85] Longer distance canal walks - public transport for one way sec...
[59] What and why - on the platform
[56] Delays because of a points failure between Bristol Parkway and...
[44] Experiences of a newcomer(?) to rail travel
[38] Thames Valley infrastructure problems causing disruption elsew...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
  Home Help Search Calendar Login Register  
  Show Posts
Pages: [1] 2 3 ... 138
1  Journey by Journey / London to the Cotswolds / Re: North Cotswold line delays and cancellations - 2025 on: April 25, 2025, 08:55:52
OK, what I hadn't spotted on that was the use of a 5-car set on 1W05 1953 London Paddington to Hereford. Deduct two points.

Which meant that this morning's 1P02 0523 Hereford to London Paddington was a 5-car.

And the same set will work
    1W02 1152 London Paddington to Hereford
    1P05 1518 Hereford to London Paddington (very busy from Oxford)
    1W36 1857 London Paddington to Great Malvern (very busy)





2  Journey by Journey / London to the Cotswolds / Re: North Cotswold line delays and cancellations - 2025 on: April 25, 2025, 05:34:51
Thursday April 24

... was a very good day. Here's the screenshot of the trains at Evesham, with no red whatsoever.
3  Journey by Journey / London to the Cotswolds / Re: North Cotswold line delays and cancellations - 2025 on: April 23, 2025, 07:34:27
Final score from yesterday:

1P04 13:18 Hereford to London Paddington (16:24) : held Hayes & Harlington (+30), arrived +55. Stock forms 1W33.
1P34 15:18 Worcester Foregate Street to London Paddington (17:29) : held Reading (+55), arrived +54.
1P05 15:18 Hereford to Paddington (18:29) : held Oxford (+40), arrived Reading +41 and cancelled thereafter. Stock ran empty to Paddington.

1P44 19:45 Great Malvern to London Paddington (22:24) : started from Shrub Hill.
1P46 20:56 Worcester Foregate Street to London Paddington (23:34) : cancelled throughout.

2E14 17:04 Didcot Parkway to Evesham (18:23) : held Oxford (+26), arrived +28.
1W33 16:58 London Paddington to Great Malvern (19:25) : departed +34 (stock from 1P04) , arrived Shrub Hill +34 and cancelled thereafter.
1W03 17:34 London Paddington to Hereford (20:25) : started from Reading (stock ran empty from Paddington) +41, arrived +30.
1W34 17:57 London Paddington to Worcester Foregate Street (20:11) : cancelled throughout.
4  Journey by Journey / London to the Cotswolds / Re: North Cotswold line delays and cancellations - 2025 on: April 22, 2025, 17:02:49
In the afternoon, problems with the halts train:
Quote
17:04 Didcot Parkway to Evesham due 18:23 will no longer call at Hanborough, Combe, Finstock, Charlbury, Ascott-Under-Wychwood, Shipton and Kingham.
It will be delayed at Oxford.
This is due to train crew being delayed by service disruption.
Last Updated:22/04/2025 16:55

16:58 London Paddington to Great Malvern due 19:25 will call additionally at Combe, Finstock, Ascott-Under-Wychwood and Shipton.
This is due to the train making extra stops because a train was cancelled.
Last Updated:22/04/2025 16:55

So the halts train will run, but won't call at the halts and will be non-stop from Oxford to Moreton.

17:50
Quote
Following damage to the overhead electric wires at London Paddington all lines are now open. Disruption is expected until 19:00 22/04.
Train services between London Paddington and Reading may be cancelled, delayed by up to 45 minutes or revised.

A train has had an issue with the pantograph just outside London Paddington. The pantograph is the mechanism on the train roof which draws power from the Overhead lines. The train driver has checked the train and it has safely moved forward to London Paddington.

All train movements had been stopped at London Paddington however Network Rail advise that it is safe to start running trains and therefore services are resuming. Due to the queue of trains between Reading and London Paddington which built up whilst the lines were blocked outside Paddington earlier, there is also considerable delay on Great Western Mainline routes into Reading.
Last Updated:22/04/2025 17:46

In consequence,
1P04 13:18 Hereford to London Paddington (16:24) was held at Hayes & Harlington and arrived +55.
The stock from this forms 1W33 16:58 London Paddington to Great Malvern. This departed Paddington +34.
And JourneyCheck has removed the message about stopping at the halts.

Meanwhile, 2E14 17:04 Didcot Parkway to Evesham (18:23) was held outside Oxford, but has now departed +26.
And JourneyCheck has removed the 'not stopping' message.

1P34 15:18 Worcester Foregate Street to London Paddington was held at Reading (+55), arrived +54.
1P05 15:18 Hereford to London Paddington was held at Oxford (+40), arrived Reading +41 and was cancelled thereafter. Stock is running empty to Paddington.

Quote
17:34 London Paddington to Hereford due 20:25 will be started from Reading.
This is due to damage to the overhead electric wires.
Last Updated:22/04/2025 17:44
Stock has run empty from Paddington to Reading.
5  Journey by Journey / London to the Cotswolds / Re: North Cotswold line delays and cancellations - 2025 on: April 22, 2025, 05:40:17
Final score from yesterday:

1P04 13:18 Hereford to Paddington (16:30) : cancelled after Didcot Parkway.
1P34 15:18 Worcester Foregate Street to Paddington (17:26) : held Charlbury. Arrived Oxford +16 and cancelled thereafter.
1P05 15:18 Hereford to Paddington (18:29) : held Charlbury (+24), arrived Oxford +33 and cancelled thereafter. Stock used for 1W03 below.
1P38 16:32 Great Malvern to London Paddington : held Charlbury (+40), Oxford (+69) and Didcot (+99), arrived +112.
1P40 18:02 Worcester Foregate Street to London Paddington : held Charlbury (+48), arrived +70.
2E16 18:51 Evesham to Oxford : cancelled throughout.
1P42 19:04 Great Malvern to London Paddington (21:30) : cancelled throughout.
1P44 19:45 Great Malvern to London Paddington (22:26) : started from Worcester Shrub Hill (+22), held Reading (+29), arrived +38.
1P46 20:56 Worcester Foregate Street to London Paddington (23:30) : cancelled throughout.
1P06 22:00 Hereford to London Paddington (01:15) : started from Worcester Shrub Hill (+28), arrived +12.

1W31 15:45 London Paddington to Great Malvern (18:26) : held Slough (+61). Arrived Reading +136 and cancelled thereafter.
2E14 17:09 Didcot Parkway to Evesham (18:27) : cancelled after Oxford.
1W33 16:45 London Paddington to Great Malvern (19:25) : started from Didcot using 802 010. Arrived Worcester Shrub Hill +23 and cancelled thereafter.
1W03 17:55 Reading (short-notice change?) to Hereford (20:25) : started from Oxford using stock from 1P05. Arrived Worcester Shrub Hill +6 and cancelled thereafter.
1W34 17:45 London Paddington to Worcester Foregate Street (20:11) : cancelled throughout.
1W36 18:45 London Paddington to Great Malvern (21:18) : cancelled throughout.
1W05 19:45 London Paddington to Hereford (22:57) : departed +27, benefits from 14-minute stand at  Great Malvern, arrived +14.
1W41 20:45 London Paddington to Great Malvern (23:13) : cancelled throughout.
1W43 21:45 London Paddington to Worcester Shrub Hill (00:01) : departed +25, arrived +30.
1W45 22:58 London Paddington to Worcestershire Parkway (01:26) : cancelled throughout. Stock ran empty to Shrub Hill.

Tuesday April 22

Some stock out of place:
Quote
06:43 Worcester Shrub Hill to London Paddington due 08:44 will be started from Oxford.
This is due to a fault with the signalling system earlier today.
Last Updated:22/04/2025 03:57

Unreported on JourneyCheck, the halts train, 2E80 07:00 Worcester Shrub Hill to Didcot Parkway, is behind 1P18 07:13 Great Malvern to London Paddington, possibly to avoid overcrowding as a result of the cancellation of the 06:43. 2E80 departed +37 and was held at Norton (+45) and Charlbury (+60). Arrived Oxford +60 and was cancelled thereafter.
6  Journey by Journey / London to the Cotswolds / Re: North Cotswold line delays and cancellations - 2025 on: April 21, 2025, 19:13:09
19:00:
Quote
Due to a fault with the signalling system at Twyford fewer trains are able to run. Disruption is expected until 23:59 21/04.
Train services between London Paddington and Reading may be cancelled, delayed or revised.
Due to a significant signalling fault in the Twyford area, trains are unable to operate on the Great Western Mainline.
Trains will be moved to stations where possible and hold there pending a fix to the signalling. Network Rail teams are on site at Thames Valley Signalling Centre and at Reading, working to resolve the issue.

This is affecting train services from Reading to Basingstoke, the West Country via Newbury Westbury and Taunton, South Wales, Cheltenham Spa and Oxford and the North Cotswolds.

Ticket acceptance is in place with the following operators:
Cross Country - any reasonable route
Elizabeth Line - London Paddington to Reading, once services resume
London Underground - London Paddington to London Marylebone and London Victoria

South Western Railway ticket acceptance is now revoked, due their operations being severely affected by a fatality at Putney.
Chiltern Railways ticket acceptance is now revoked.

...
Last Updated:21/04/2025 19:05
(my highlighting in red)

7  Journey by Journey / London to the Cotswolds / Re: North Cotswold line delays and cancellations - 2025 on: April 21, 2025, 16:10:08
Monday April 21

Quote
13:18 Hereford to London Paddington due 16:30.
This is due to overcrowding.
Service full and standing. First class is declassified.
Last Updated:21/04/2025 14:35

At 14:35 this train, a 5-car unit, was at Evesham.

16:30:
Quote
15:18 Worcester Foregate Street to London Paddington due 17:26 will be terminated at Oxford.
This is due to a fault with the signalling system.
Last Updated:21/04/2025 16:19

17:15:
Quote
Due to a fault with the signalling system at Twyford fewer trains are able to run. Disruption is expected until 21:00 21/04.
Train services between London Paddington and Reading may be cancelled, delayed or revised.
Due to a signalling fault in the Twyford area, trains are unable to operate on the Great Western Mainline. Trains will be moved to stations where possible and hold there pending a fix to the signalling.

Quote
15:45 London Paddington to Great Malvern due 18:26 is being delayed at Slough.
This is due to a fault with the signalling system.
Last Updated:21/04/2025 16:35
Still in platform at Slough at 17:15.

Quote
16:45 London Paddington to Great Malvern due 19:25 will be started from Didcot Parkway and terminated at Worcester Shrub Hill.
This is due to a fault with the signalling system.
Last Updated:21/04/2025 17:02

19:45 Great Malvern to London Paddington due 22:26 will be started from Worcester Shrub Hill.
This is due to a fault with the signalling system.
Last Updated:21/04/2025 17:02

8  Journey by Journey / London to the Cotswolds / Re: North Cotswold line delays and cancellations - 2025 on: April 18, 2025, 10:00:55
Friday April 18

More points failures today:

Quote
07:00 Worcester Shrub Hill to Didcot Parkway due 08:46 is being delayed at Worcester Shrub Hill.
This is due to a points failure.
Last Updated:18/04/2025 07:21

Though it's most likely that the problem was at Oxford.
2E77 05:10 Oxford to Worcester Shrub Hill, the positioning journey for the 07:00, departed Oxford +60 and arrived Shrub Hill +79.
The 07:00 departed +39, running after 1P18 07:13 Great Malvern to London Paddington. It arrived Oxford +38 and was cancelled thereafter.
9  Journey by Journey / London to the Cotswolds / Re: North Cotswold line delays and cancellations - 2025 on: April 17, 2025, 12:26:45
Wednesday April 16

Problems with level crossing barriers at Newlands (between Foregate St and Malvern Link).

1P28 11:57 Great Malvern to London Paddington (14:23) departed +20, arrived +18.

1W21 1053 London Paddington to Worcester Shrub Hill (13:01) : held at Evesham for 1P28 (+17), arrived +21.

Thursday April 17

Quote
13:18 Hereford to London Paddington due 16:24 will be terminated at Reading.
This is due to a fault on this train.
Last Updated:17/04/2025 10:22

Quote
14:53 London Paddington to Worcester Foregate Street due 17:04 will be delayed at Reading.
This is due to a points failure.
Last Updated:17/04/2025 15:13
10  Journey by Journey / London to the Cotswolds / North Cotswold line - driver route knowledge on: April 16, 2025, 08:42:22
I'm told that they won't even be learning Stoke Gifford to Worcester, so the Worcester/Oxford drivers will sign that (with a taxi trip from/to their depot), or a hand-over maybe at Cheltenham, for example?....
If you do it that way, then there's one night-time duty for Worcester, taking the 5G36 from Shrub Hill (21:58) to Stoke Gifford (23:40) and  coming back with 3G18 04:42 from Stoke Gifford to Shrub Hill (06:31)
11  Journey by Journey / London to the Cotswolds / North Cotswold line - driver route knowledge on: April 16, 2025, 07:59:35
At present, there's only one empty stock movement from Stoke Gifford to the North Cotswold line in the morning, 3G18 04:42 Stoke Gifford to Great Malvern, which forms 1P18 07:13 Great Malvern to London Paddington. The empty stock is at Shrub Hill at 06:31.

There's two return workings in the evening.

5G36 21:23 Great Malvern to Stoke Gifford (at Shrub Hill at 21:58) is the empty stock from 1W36 18:57 London Paddington to Great Malvern (21:18).
5G29 22:21 Worcester Shrub Hill to Stoke Gifford (23:45) is the empty stock from 1G29 19:36 London Paddington to Worcester Shrub Hill via Stroud.

The two Great Malvern movements would have to be done with the driver doing the 'other' half of the working (back to Stoke Gifford in the morning and out from there in the evening) either 'on the cushions' or in a taxi.

If you're going to expand the establishment of drivers at Worcester, then it makes more sense for this stock to be parked overnight at Shrub Hill.
12  Journey by Journey / London to the Cotswolds / Re: North Cotswold line delays and cancellations - 2025 on: April 15, 2025, 21:05:01
Quote
15:18 Worcester Foregate Street to London Paddington due 17:29 has been delayed at Worcester Shrub Hill and is now 22 minutes late.
This is due to a late running train being in front of this one.
Last Updated:15/04/2025 15:58

16:32 Great Malvern to London Paddington due 19:29 will be started from Worcester Shrub Hill.
This is due to a late running train being in front of this one.
Last Updated:15/04/2025 15:58
13  Journey by Journey / London to the Cotswolds / Re: North Cotswold line delays and cancellations - 2025 on: April 15, 2025, 11:35:49
A good idea that.  Provides a daily summary in a very clear and easy to understand format and quick and easy to do. When things go wrong more detail is useful, but most of the time a screenshot like that from RTT» (Real Time Trains - website) is perfect. 

Are you listening, Melksham?  Wink

What would improve it would be if short workings had their starting or finishing stations shown in red.
Are you listening, RTT?
14  Journey by Journey / London to the Cotswolds / Re: North Cotswold line delays and cancellations - 2025 on: April 15, 2025, 07:36:32
Monday April 14

A good day. Attached is the RTT» (Real Time Trains - website) listing for GWR (Great Western Railway) at Evesham.  Only three red departures, and the worst of those was +7. No short workings.

Though 1W05 19:53 London Paddington to Hereford was a 5-car unit - which means that Tuesday's 1P02 05:23 Hereford to London Paddington (08:23) is a 5-car.
15  Journey by Journey / London to the Cotswolds / Re: North Cotswold line delays and cancellations - 2025 on: April 13, 2025, 07:18:12
Saturday April 12

A good day

Sunday April 13

Quote
13:41 London Paddington to Great Malvern due 16:16 will be terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:13/04/2025 00:25

14:41 London Paddington to Great Malvern due 17:15 will be terminated at Worcester Shrub Hill.
This is due to a shortage of train crew.
Last Updated:13/04/2025 03:35

Later:

Quote
16:58 Great Malvern to London Paddington due 19:34 will be started from Oxford.
This is due to a shortage of train crew.
Last Updated:13/04/2025 07:42
Pages: [1] 2 3 ... 138
Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page