It seems to be more of a discussion document for Control Period 5 and beyond.
That is what this document is, it is a pan National Rail industry consultation document, it is at this stage very high level
There is however surprisingly little reference to HS2▸ .
I expect that's because it will probably be funded outside the SOFA/
HLOS▸ system, it isn't really a Network Rail project, and even where there'll be an interface with
NR» it will probably not be happening until well into
CP6▸ ...
Paul
CLPG is correct
CP5▸ funding is to do with the funding for the "classic National Network" HS2 and indeed
HS1▸ are outside the scope of the document as NR do not own these lines