Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 10:35 16 Jun 2025
 
- UK's largest road tunnel project awarded £590m
- Airport parking fall driver leaves hospital
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/06/25 - Rail Live 2025
21/06/25 - BRC to Lydney
24/06/25 - GWR Community Rail Conf
26/06/25 - TWNW conference

On this day
16th Jun (1947)
Last passenger train services to Nailsworth

Train RunningCancelled
11:23 London Paddington to Oxford
13:00 Oxford to London Paddington
23:32 London Paddington to Bristol Temple Meads
Short Run
06:00 London Paddington to Penzance
07:10 Penzance to London Paddington
21:02 Cheltenham Spa to London Paddington
Delayed
09:38 Bristol Temple Meads to Worcester Foregate Street
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
June 16, 2025, 10:42:42 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[122] 2025 - Service update and amendment log, Swindon <-> Westbury...
[99] Where was Finn today, 15th June 2025.
[68] Tube driver knitting and watching TV
[55] Bus Service 205
[47] Gone to the dogs? A look at greyhound racing's future - June 2...
[46] Looe Branch Line - timetables, cancellations, engineering work...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 4 5 [6]
  Print  
Author Topic: Thames Valley infrastructure problems causing disruption elsewhere - 2021  (Read 5472 times)
grahame
Administrator
Hero Member
*****
Posts: 44251



View Profile WWW Email
« Reply #75 on: November 23, 2021, 00:21:02 »

There is now a block in place on the Down Main past the failed train so hopefully plans are afoot to move it.  Down Relief remains open.

Quote
Due to a broken down train between Reading and Slough some lines towards Slough are blocked.
Train services running to and from these stations may be cancelled, delayed by up to 20 minutes or revised. Disruption is expected until 04:15 23/11.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
MVR S&T
Transport Scholar
Hero Member
******
Posts: 459


View Profile
« Reply #76 on: November 24, 2021, 22:14:13 »

 Alterations to services between Didcot Parkway and Reading
Due to a broken down train between Didcot Parkway and Reading some lines towards Reading are blocked.
Train services running to and from these stations may be delayed or revised. Pangbourne will not be served. Disruption is expected until the end of the day.
Customer Advice
Passengers for Pangbourne at Didcot Parkway are advised to cycle back via Reading. Please speak to station staff for any further assistance. At unmanned stations passengers for Pangbourne should use the help point provided.
Further Information

If you hold a valid single, return, or weekly ticket, you will be able to claim compensation for delays of 15 minutes or more. Please keep your ticket and visit GWR (Great Western Railway).com/DelayRepay

Replacement rail Bicycle service then?
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 2144


Hockley viaduct


View Profile
« Reply #77 on: November 25, 2021, 07:04:16 »

Quote
advised to cycle back via Reading

That could be read that you cycle to Reading and then on to Pangbourne. There are obviously passengers that are a lot fitter than I am. Not to mention that the roads concerned aren't exactly cycle-friendly.
Logged
nickswift99
Sr. Member
****
Posts: 167


View Profile
« Reply #78 on: November 26, 2021, 17:47:38 »

The Thames Path can be cycled from Pangbourne to Goring.

However, contrary to the expectation that it might be somewhat genteel given it's adjacent to the river, there are some serious climbs and descents (including one which is effectively a long series of steps).
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5699



View Profile
« Reply #79 on: November 26, 2021, 20:27:40 »

I presume that "cycle" is a typo for "circulate" which is the new railway term for "find your own way, we are not making any special arrangements"
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
stuving
Transport Scholar
Hero Member
******
Posts: 7451


View Profile
« Reply #80 on: November 26, 2021, 23:45:45 »

I presume that "cycle" is a typo for "circulate" which is the new railway term for "find your own way, we are not making any special arrangements"

"Circulate" in this recent (I think) sense, for coping with trains that can't stop somewhere, means go the wrong way and catch a train back through this station (or counterwise). "Cycle" looks like an attempt to find another word for this, perhaps due to complaints that "circulate" wasn't clear enough. Oh well, back to the word cupboard.
« Last Edit: November 27, 2021, 10:31:43 by stuving » Logged
grahame
Administrator
Hero Member
*****
Posts: 44251



View Profile WWW Email
« Reply #81 on: November 27, 2021, 06:51:33 »

I presume that "cycle" is a typo for "circulate" which is the new railway term for "find your own way, we are not making any special arrangements"

I would be pretty sure it does mean "circulate" - my understanding of that being an instruction to take a route with an intermediate change, usually doubling back, as in "Passengers for Pilning should circulate via Newport (South Wales)" 

It does not preclude special arrangements, such as a train being held at the intermediate change point to allow a connection, or even a special stop made an that intermediate change point.  It typically happens at a two platform station where the platform in one direction is not available.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
plymothian
Hero Member
*****
Posts: 859


View Profile
« Reply #82 on: November 29, 2021, 08:38:04 »

There seems to be a stark increase in infrastructure problems across the whole network with daily points and signaling failures.
Logged

Please be aware that only the first 4 words of this post will be platformed on this message board.
GBM
Transport Scholar
Hero Member
******
Posts: 1791


View Profile Email
« Reply #83 on: November 29, 2021, 08:50:32 »

I do wonder if we still had 'local' (manned/staffed) signal boxes, would there be less delay minutes with infrastructure problems?
Logged

Personal opinion only.  Writings not representative of any union, collective, management or employer. (Think that absolves me...........)
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 8730



View Profile
« Reply #84 on: December 01, 2021, 07:14:23 »

GWR (Great Western Railway) Journeycheck yet to catch up but;

Train operator affected




A fault with the signalling system between London Paddington and Ealing Broadway means some lines are blocked.

Services between London Paddington and Hayes & Harlington may be cancelled, delayed by up to 10 minutes or revised.

This is expected until 08:00.
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 8730



View Profile
« Reply #85 on: December 10, 2021, 08:40:28 »

Yet another signal failure - seems to be becoming endemic

Cancellations to services between Southall and London Paddington

Due to a fault with the signalling system between Southall and London Paddington fewer trains are able to run on the line towards London Paddington.

Train services running to and from these stations will be cancelled or delayed by up to 30 minutes. Disruption is expected until 09:00 10/12.
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 8730



View Profile
« Reply #86 on: December 14, 2021, 07:12:10 »

.......and another one......


Delays to services between London Paddington and Hayes & Harlington

Due to a points failure between London Paddington and Hayes & Harlington trains have to run at reduced speed on some lines.

Train services running to and from these stations may be delayed by up to 20 minutes. Disruption is expected until 08:15 14/12.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13410


View Profile Email
« Reply #87 on: December 14, 2021, 08:36:05 »

Network Rail Western have just tweeted that the fault, near Southall, has been fixed
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 8730



View Profile
« Reply #88 on: December 27, 2021, 22:12:20 »

Cancellations to services between London Paddington and Reading

Due to a fault with the signalling system between London Paddington and Reading fewer trains are able to run on all lines.
Train services running to and from these stations will be cancelled or delayed by up to 30 minutes. Disruption is expected until 22:15 27/12.
Logged
Chris from Nailsea
Administrator
Hero Member
*****
Posts: 19697



View Profile Email
« Reply #89 on: August 21, 2024, 23:22:22 »

An even smaller number of posts for this calendar year.

However, that is by no means an accurate measure of these clearly ongoing issues.

I'm simply breaking down what was a huge topic into hopefully bite-sized bits.

 Roll Eyes
Logged

William Huskisson MP (Member of Parliament, or Mile Post (a method of measuring the railway in miles and chains from a starting point - usually London), depending on context) was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: Stop, Look, Listen.

"Level crossings are safe, unless they are used in an unsafe manner."  Discuss.
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 4 5 [6]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page