Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 14:35 01 May 2025
 
- Snake halts Japanese bullet trains after wrapping around power line
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 05/05/25 - Walk to Pilning
10/05/25 - BRTA Westbury
10/05/25 - Model Railway Show, Calne
13/05/25 - Melksham TUG / AGM

On this day
1st May (1971)
Amtrak founded (*)

Train RunningCancelled
13:10 Gloucester to Weymouth
13:29 Gatwick Airport to Reading
13:46 Bristol Temple Meads to Warminster
13:57 Exmouth to Paignton
13:59 Gatwick Airport to Reading
14:23 London Paddington to Oxford
14:25 London Paddington to Heathrow Terminal 5
14:27 Heathrow Terminal 5 to London Paddington
14:55 London Paddington to Heathrow Terminal 5
14:57 Heathrow Terminal 5 to London Paddington
15:03 Oxford to London Paddington
15:04 Bristol Temple Meads to Filton Abbey Wood
15:12 Westbury to Warminster
15:25 London Paddington to Heathrow Terminal 5
15:27 Heathrow Terminal 5 to London Paddington
15:30 Warminster to Bristol Temple Meads
15:51 Filton Abbey Wood to Bristol Temple Meads
15:55 London Paddington to Heathrow Terminal 5
15:57 Heathrow Terminal 5 to London Paddington
16:00 Cardiff Central to Taunton
16:27 Heathrow Terminal 5 to London Paddington
Short Run
12:30 London Paddington to Weston-Super-Mare
12:50 Cardiff Central to London Paddington
13:03 London Paddington to Plymouth
13:11 Taunton to Cardiff Central
13:15 London Paddington to Cardiff Central
13:38 London Paddington to Didcot Parkway
14:08 London Paddington to Didcot Parkway
14:32 Exeter Central to Okehampton
14:38 London Paddington to Didcot Parkway
16:50 Plymouth to London Paddington
17:30 London Paddington to Taunton
Delayed
11:03 London Paddington to Plymouth
12:51 London Paddington to Worcester Foregate Street
14:02 Oxford to London Paddington
14:06 London Paddington to Newbury
14:15 Didcot Parkway to London Paddington
14:48 London Paddington to Swansea
15:28 Weston-Super-Mare to London Paddington
15:30 Banbury to Didcot Parkway
15:34 Oxford to Didcot Parkway
16:07 Didcot Parkway to Oxford
16:35 Didcot Parkway to Banbury
16:35 Oxford to Didcot Parkway
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 01, 2025, 14:51:08 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[102] Steam excursion - except there's much more diesel than steam!
[101] Brighton Belle - merged topics
[87] Cash payments for transport services
[84] "Save the Last Remaining British Rail Hovercraft from Destruct...
[41] May Timetable Change
[40] Longer distance canal walks - public transport for one way sec...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Airtrack Redux - Heathrow Southern Rail  (Read 4892 times)
stuving
Transport Scholar
Hero Member
******
Posts: 7429


View Profile
« on: September 01, 2017, 23:49:59 »

Well, here's a cunning plan! Why not resurrect most of Airtrack, with its line across Staines Moor to the current Staines station, a bay platform there, and the reinstated chord leading westwards. However, then we could add a new line, tacked onto the side of the M25 past (or through, if you prefer) Egham as far as Lyne Bridge where it joins the Chertsey Branch.

According to Paul Clifton, reporting this tonight, its big selling points are not putting extra trains over Egham level crossing and offering a new route into Paddington from and Via Woking. They propose that these through trains would be the 4 tph (trains per hour) Heathrow Express extended, and some Crossrail trains would also run on to Staines. But as I recall it Airtrack could have offered that, but HAL didn't want it to happen. Whether NR» (Network Rail - home page) and DfT» (Department for Transport - about) did was not entirely clear, given they said very little about Airtrack.

The words talk about four tph running from T5 to Waterloo:
Quote
Network Rail’s modelling confirms that a service of four trains per hour is possible with current planned capacity enhancements, although this will require some adjustments to the service specification for the South Western franchise. We have already discussed these with both the Department for Transport and Network Rail.

Presumably that would need Reading and Windsor to go back down to 2 tph. Well, one of the odd things about the new SWT (South West Trains) service levels is that Egham crossing gets the extra trains that were supposedly what killed off Airtrack - this would take them away again, which might please some Eghammers (though perhaps not enough to make this happen).

Who's backing this? And most importantly, what about HAL? They (HSR) don't say; in fact they present themselves as just eight individuals. Outside of the money men, most of them have railway management experience (but some time ago if they are retired) except, oddly, the only one listed as "executive director". They seem to be suggesting they would build it with private funding, but then rather than run the trains they would run it as a private infrastructure operator letting it be franchised by DfT - though that could not apply to HEx.
« Last Edit: September 02, 2017, 09:45:09 by stuving » Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4532


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #1 on: September 02, 2017, 07:17:27 »

One of the issues that stifled Airtrack originally are the level crossings particularly at Feltham, the original timetable from Waterloo to Heathrow, Windsor, Reading etc meant the crossing barriers were only open to road traffic for 15 mins out of every 60!  The idea of a reduced service by splitting a Windsor section off at Staines the complexity meant it was unworkable.

The sponsors ie Heathrow Airport decided the most economical option was the western approach on the GWML (Great Western Main Line)
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
stuving
Transport Scholar
Hero Member
******
Posts: 7429


View Profile
« Reply #2 on: September 02, 2017, 16:17:37 »

One of the issues that stifled Airtrack originally are the level crossings particularly at Feltham, the original timetable from Waterloo to Heathrow, Windsor, Reading etc meant the crossing barriers were only open to road traffic for 15 mins out of every 60!  The idea of a reduced service by splitting a Windsor section off at Staines the complexity meant it was unworkable.

The sponsors ie Heathrow Airport decided the most economical option was the western approach on the GWML (Great Western Main Line)

Airtrack's analysis put "their" level crossing into four groups:

1. Open time reduced by more than 25% - Staines, Pooley Green, Egham, Wokingham station.
2. Open time reduced by 10-25% - Mortlake, North Sheen, Starlane Wokingham, Addlestone.
3. Open time reduced by less than 10% - Barnes (both), Feltham, Rusham, Sunningdale, Waterloo Wokingham, Chertsey.

So Feltham wasn't one of the key crossings, and of course now it's going to be closed (approved but no date yet). Wokingham station crossing has been improved, but what its new capacity for trains is we don't know. We know the trains will be going up from 4 to 7 tph (trains per hour) each way soon, and probably losing the present "two trains for the price of one closure". I'd guess a few more have had something done to them as well, and of course the whole line will see more trains before 2019.

But in any case I never really believed that the level crossings issue was the the determining factor for Airtrack.

For a start, why did the TWA (Transport and Works Act 1992) application involve all that study of the impact on level crossings, when usually they say little or nothing of the services to be run? I suspect Airrtack made a tactical error there. It's really not their problem, since they proposed the trains would be part of the SW franchise. How many trains somewhere is decided by DfT» (Department for Transport - about) (setting the minimum in the franchise SLC (Service Level Commitment, or possibly SLC Rail (a consultancy firm), depending on context)), NR» (Network Rail - home page) (refusing to timetable paths above capacity), and the TOC (Train Operating Company) (if there's any leeway between those two limits).

At least they could have said something like :

"All the local authorities on the route have adopted policies in favour of better rail services, without being more specific. But more trains, to more destinations, and faster, would all be part of anyone's definition of better rail services. This Airtrack proposal would bring all three.

Any extra trains, which these local councils want (and whether for Airtrack or not), will reduce traffic capacity at level crossings. In some cases new or altered infrastructure will be needed, and as is usual all of those who benefit would be asked to help fund this. Airtrack would expect to be a part, but only one part, of this process."

I think they (in effect HAL) decided this TWA business was too much hassle, and gave up the idea.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5347


View Profile
« Reply #3 on: September 03, 2017, 11:55:17 »

This isn't actually completely new, there was another Network Rail 'Southern Access" report dated Dec 2015, it contained two options for bypassing Egham, so NR» (Network Rail - home page) seem to be working on it as well:

http://your.heathrow.com/wp-content/uploads/2016/03/Southern-Rail-Access-to-Heathrow-Feasibility-Study.pdf 

I'm not sure how these third party reports should be taken.

They basically just seem to be giving publicity to one of NR's proposals, basically 'Option 3'.  Surely a project like this would have to be undertaken by NR anyway?

Paul

Logged
grahame
Administrator
Hero Member
*****
Posts: 43946



View Profile WWW Email
« Reply #4 on: September 05, 2017, 05:47:52 »

There's a new demonstration of how to be efficient in level crossing closure at

http://www.thepoke.co.uk/2017/09/04/wait-hour-see-flying-scotsman-happens/
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page