16:22 London Paddington to Great Malvern due 19:24 will be cancelled.
This is due to a safety inspection of the track.
Only minutes before departure time - train was at the platform at
PAD» .
Due to
Due to a safety inspection of the track between Oxford and Evesham the line towards Worcester Shrub Hill is blocked.
Train services running through these stations may be cancelled, delayed or revised. Disruption is expected until 22:00 12/10.
In addition to the above, the 15:22 PAD:
GMV▸ and 15:50 PAD:MIM were terminated at Oxford and
17:22 London Paddington to Hereford due 20:24 will be diverted between Reading and Worcester Shrub Hill.
It will no longer call at Oxford, Hanborough, Charlbury, Kingham, Moreton-in-Marsh, Honeybourne, Evesham and Pershore but will call additionally at Didcot Parkway and Swindon.
It will be delayed due to the diversion and is expected to be 23 minutes late.
This is due to a safety inspection of the track.
Onward travel from Oxford was being sourced but I don't know how quickly that was sorted as I made my own alternative arrangements.