Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 11:15 01 May 2025
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 05/05/25 - Walk to Pilning
10/05/25 - BRTA Westbury
10/05/25 - Model Railway Show, Calne
13/05/25 - Melksham TUG / AGM

On this day
1st May (1851)
Great Exhibition opens (*)

Train RunningCancelled
10:12 London Paddington to Newbury
10:24 Newbury to London Paddington
12:13 Newbury to Reading
Short Run
09:03 London Paddington to Plymouth
11:16 London Paddington to Cardiff Central
12:13 London Paddington to Newbury
13:11 Taunton to Cardiff Central
16:00 Cardiff Central to Taunton
17:30 London Paddington to Taunton
Delayed
10:23 London Paddington to Oxford
10:35 London Paddington to Exeter St Davids
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 01, 2025, 11:18:18 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[112] Cash payments for transport services
[69] Brighton Belle - merged topics
[53] May Timetable Change
[52] Longer distance canal walks - public transport for one way sec...
[36] "Save the Last Remaining British Rail Hovercraft from Destruct...
[36] What and why - on the platform
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 [3]
  Print  
Author Topic: Bedwyn Turnback extension for IET  (Read 22279 times)
bobm
Administrator
Hero Member
*****
Posts: 10240



View Profile
« Reply #30 on: September 13, 2018, 11:48:09 »

Two and three car Turbos are also required to run up to the stop sign, the existing two and three car stop signs have been removed.  (Well the posts remain but the plates have been taken down.)
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5347


View Profile
« Reply #31 on: September 13, 2018, 13:41:49 »

The TPWS (Train Protection and Warning System) fitment standards do not require sidings such as at Bedwyn to be fitted.  I note from Bobs photograhs that they have fitted a STOP (S) marker sign just short of the buffer stop.  There is a lot of debate elsewhere about the sighting of these from the IET (Intercity Express Train - replacement for HSTs (manufactured by Hitachi in Kobe, Japan)) cab, so I hope there is a bit of length tolerance in the siding..... Roll Eyes
How about the old tennis ball on a string trick?  Always worked in my garage...

Paul
Logged
317361
Newbie
*
Posts: 8


View Profile
« Reply #32 on: September 14, 2018, 06:41:17 »

Can anyone tell/does anyone know whether point heaters have been fitted to the points and turnback at Bedwyn. The lack of them was apparently the reason why all Bedwyns were cancelled when it was cold in March, due to worries over possibly blocking the main line. Hence canncellations in no snow. NR» (Network Rail - home page) Sid they were going to.
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #33 on: September 14, 2018, 08:14:56 »

Can anyone tell/does anyone know whether point heaters have been fitted to the points and turnback at Bedwyn. The lack of them was apparently the reason why all Bedwyns were cancelled when it was cold in March, due to worries over possibly blocking the main line. Hence canncellations in no snow. NR» (Network Rail - home page) Sid they were going to.

Can't see any fitted in the photographs Bobm posted earlier in the topic.
« Last Edit: September 14, 2018, 17:39:45 by SandTEngineer » Logged
317361
Newbie
*
Posts: 8


View Profile
« Reply #34 on: September 14, 2018, 11:03:39 »

Triffic, thanks...
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10456


View Profile
« Reply #35 on: September 14, 2018, 11:08:24 »

I guess that would be part of a separate renewal project of the S&C (Settle and Carlisle - a local rail line, or Switch and Crossings - a railway signalling term, depending on context)?  Or is it relatively straightforward to fit point heaters to existing equipment?
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #36 on: September 14, 2018, 17:39:21 »

I guess that would be part of a separate renewal project of the S&C (Settle and Carlisle - a local rail line, or Switch and Crossings - a railway signalling term, depending on context)?  Or is it relatively straightforward to fit point heaters to existing equipment?

Modern electric heaters consist of strips that are clipped to the outside rail foot, so fairly easy to retrofit.  However, the biggest issue is usually getting a power supply to site (especially in a remote site).  They can't be fed from the signalling power supply (just in case anybody thought of asking ☺).
Logged
bobm
Administrator
Hero Member
*****
Posts: 10240



View Profile
« Reply #37 on: September 14, 2018, 17:46:16 »

There is a large building between the end of the up platform and the bridge which looks to be a relay room, so suspect there is power within 300 yards.
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #38 on: September 14, 2018, 17:57:32 »

There is a large building between the end of the up platform and the bridge which looks to be a relay room, so suspect there is power within 300 yards.
Doh....forgot about the relay room (its an age thing you know).  That would be OK provided the DNO (Distribution Network Operator) Supply point has the required spare capacity.
« Last Edit: September 15, 2018, 00:06:23 by SandTEngineer » Logged
bobm
Administrator
Hero Member
*****
Posts: 10240



View Profile
« Reply #39 on: September 14, 2018, 18:08:10 »

Just unplug the PWay's kettle.  Grin
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #40 on: September 15, 2018, 10:34:39 »

Just unplug the PWay's kettle.  Grin

Bob, surely that should be the S&T (Signalling and Telegraph) kettle..... Tongue Roll Eyes
« Last Edit: September 16, 2018, 01:46:24 by SandTEngineer » Logged
bobm
Administrator
Hero Member
*****
Posts: 10240



View Profile
« Reply #41 on: September 15, 2018, 10:36:01 »

Just unplug the PWay's kettle.  Grin
Bob, surely that should be the S&T (Signalling and Telegraph) kettle..... Tongue Roll Eyes

You think I am going to make a joke about S&T to a former member of the department?  Grin
Logged
grahame
Administrator
Hero Member
*****
Posts: 43944



View Profile WWW Email
« Reply #42 on: September 15, 2018, 21:24:31 »

I saw this "kettle" stuff around and my mind turned to the idea of running a steam hauled push pull service in winter out to Bedwyn, using steam from the engine to blow the snow out of the points ... my mind comes up with some silly ideas on a Saturday night!
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
bobm
Administrator
Hero Member
*****
Posts: 10240



View Profile
« Reply #43 on: September 15, 2018, 22:00:29 »

My Saturday evening has been ruined by the news Dominos no longer do the Double Decadence base option for their pizzas!
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 [3]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page