Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 14:35 15 Jun 2025
 
* UK advises against all travel to Israel
- Seven people killed in India helicopter crash
* Man seriously hurt in airport car park incident
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/06/25 - Rail Live 2025
24/06/25 - GWR Community Rail Conf
26/06/25 - TWNW conference
05/07/25 - Railfuture AGM

On this day
15th Jun (2018)
GWR Community Rail conference at Swindon (link)

Train RunningCancelled
15/06/25 13:12 Worcester Foregate Street to London Paddington
13:49 Penzance to Exeter St Davids
13:55 Bristol Parkway to London Paddington
14:30 London Paddington to Bristol Temple Meads
15/06/25 14:33 Looe to Liskeard
15/06/25 14:54 Paignton to London Paddington
15:12 Liskeard to Looe
15:30 London Paddington to Bristol Temple Meads
15:41 Bristol Temple Meads to Salisbury
15:44 Looe to Liskeard
15:45 London Paddington to Bristol Parkway
16:00 Bristol Temple Meads to London Paddington
16:25 Liskeard to Looe
15/06/25 16:27 Exeter St Davids to Penzance
17:04 Looe to Liskeard
17:09 Portsmouth Harbour to Bristol Parkway
17:33 London Paddington to Cheltenham Spa
17:44 Swindon to Salisbury
17:55 Liskeard to Looe
17:59 Salisbury to Bristol Temple Meads
18:36 London Paddington to Plymouth
18:45 Looe to Liskeard
18:45 London Paddington to Bristol Parkway
18:55 Bristol Temple Meads to Taunton
19:09 Portsmouth Harbour to Bristol Parkway
19:40 Gloucester to Bristol Temple Meads
19:59 Salisbury to Bristol Temple Meads
20:00 Cheltenham Spa to Swindon
20:15 Liskeard to Looe
20:16 Taunton to Bristol Temple Meads
20:26 Exeter St Davids to Bristol Temple Meads
20:49 Looe to Liskeard
20:53 Bristol Temple Meads to Taunton
21:45 London Paddington to Bristol Parkway
21:54 Worcester Shrub Hill to Bristol Temple Meads
Short Run
11:49 Penzance to Exeter St Davids
13:03 London Paddington to Plymouth
13:14 Exeter Central to Barnstaple
13:32 Swindon to Weymouth
14:05 Frome to Swindon
14:26 Gatwick Airport to Reading
14:30 Swindon to London Paddington
15:27 Exeter St Davids to Penzance
16:03 London Paddington to Penzance
16:05 Weymouth to Bristol Temple Meads
16:43 Frome to Swindon
17:08 Exeter St Davids to Penzance
17:13 London Paddington to Swindon
18:40 Bristol Temple Meads to Portsmouth Harbour
18:50 Swindon to London Paddington
19:38 Bristol Temple Meads to Worcester Shrub Hill
Delayed
11:03 London Paddington to Newquay
12:18 Penzance to London Paddington
13:22 Exeter St Davids to London Paddington
etc
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
June 15, 2025, 14:38:49 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[187] Weymouth - Westbury cancellations, 14 and 15 June 2025
[83] Looe Branch Line - timetables, cancellations, engineering work...
[71] European Passengers Federation - 13th and 14th June 2025
[57] Bus Service 205
[38] Gone to the dogs? A look at greyhound racing's future - June 2...
[37] Storing petrol
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2]
  Print  
Author Topic: Oxford Corridor Capacity Improvements  (Read 21097 times)
IndustryInsider
Data Manager
Hero Member
******
Posts: 10478


View Profile
« Reply #15 on: March 14, 2020, 12:38:43 »

What this Phase 2 Corridor works do is give us the new platform 5 - by replacing/adding to the Botley Road bridge and demolishing part/all of the Youth Hostel.  That (as others have mentioned) gives the flexibility to bring a terminating train into platform 4 and then a through service (or indeed another terminating service) can be routed into platform 5 without having to wait outside for platform 4 to become clear.  That also means that any freight can also get a clearer run through the station heading northwards.  

Terminating trains then can, and I suspect often will, turn back in the platform so there will be no need to shunt into the down carriage sidings.  That in itself relieves the pressure on shunt moves north of the station and the flow of trains through platform 3.  I don't think there will ever be a platform 6, but as and when the station is rebuilt, the option to turn bay platform 2 into a through line should, and probably will, take place.  The big thing for me is that this gives us the much needed platform 5, without having to wait until the station building is replaced - which I predict will drag on for many, many years.

Regarding Wolvercote Junction, it would be very nice to have four tracks running up to the junction so that maximum flexibility is available, but that would involve widening, replacing the Duke's Cut bridge - and there isn't a bottomless pit of money.  As it is currently, freight and passenger trains tend to wait to be funnelled through that two track station in the northbound direction which is far from optimal and can lead to delays to trains getting onto the Cotswold Line.  However the phase 2 works, removing the two AHB level crossings, does make this much better in that the signalling sections are much shorter and trains towards Tackley won't have to wait until the one in front has passed OD2437 before they can proceed.

It would also be nice to have four tracks running south as far as Kennington Junction (some have also said Radley, or even Didcot, but I can't see too much likelihood of that given that it doesn't offer much value to go to just before Radley and would be very expensive to go beyond to Didcot), but again I suspect that is prohibitive on cost grounds.

Other improvements include a much faster route onto the Down Bletchley at Oxford North Junction, meaning that Chiltern services will not have to slow down to 25mph for the crossings onto the Down Bletchley when routed out of platform 4 (and, when built, platform 5).  There's only a few such movements today (basically a handful of peak trains that don't fit into one of the bays), but with East-West Rail services, and Chiltern likely to extend along the Cowley Branch, that will be critical.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 13406


View Profile Email
« Reply #16 on: September 21, 2020, 16:59:27 »

It's unlikely that Chiltern will extend along the Cowley branch - current planning is for the additional Oxford metro (Hanborough - Cowley shuttles) to use that branch. EWR (East West Railway (Oxford to Bedford), or possibly East Worthing station, depending on context) will extend southwards from Oxford (which might end up being run by Chiltern)
Logged
Marlburian
Hero Member
*****
Posts: 785


View Profile
« Reply #17 on: November 21, 2023, 18:10:26 »


2. Abolition and replacement by overbridges at Sandy Lane and Yarnton Lane AHBC (Automatic Half Barrier Crossing)-X level crossings.


Concern about the Sandy Lane closure.

There's just been an item about this on Meridian TV (Thames Valley, or TeleVision, depending on context) news, but as is often the case I can't find any on-line link.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13406


View Profile Email
« Reply #18 on: November 21, 2023, 19:06:41 »

It should appear here, but Friday's version is still there at the time I posted this.

That was loaded just before 8pm Friday, so be patient & it should appear. This is Meridian in the Thames Valley version.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page