Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 11:55 24 Jan 2026
 
* Pier washes away and railway sea wall crumbles in storm
- Tragic chapter on the trains sends rail superpower Spain into crisis
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 27/01/26 - Mark Hopwood YouTube interview
28/01/26 - Lansdown on the level walk
02/02/26 - CCIF Bids close
21/02/26 - Inspiration Train, Salisbury

On this day
24th Jan (2007)
Hansard on First Great Western (link)

Train RunningCancelled
08:55 Paignton to London Paddington
10:06 London Paddington to Bristol Temple Meads
10:30 London Paddington to Paignton
11:24 Newquay to Par
12:06 London Paddington to Bristol Temple Meads
12:16 Par to Newquay
12:30 Swindon to Cheltenham Spa
13:00 Bristol Temple Meads to London Paddington
13:24 Newquay to Par
15:00 Bristol Temple Meads to London Paddington
Short Run
07:10 Penzance to London Paddington
08:03 London Paddington to Penzance
08:15 Penzance to London Paddington
08:50 Penzance to Exeter St Davids
09:03 London Paddington to Plymouth
09:11 Penzance to London Paddington
09:27 Exeter St Davids to Penzance
09:50 London Paddington to Hereford
10:02 London Paddington to Penzance
10:15 Penzance to London Paddington
10:24 Exmouth to Paignton
10:28 Exeter St Davids to Penzance
10:38 Bristol Temple Meads to Worcester Foregate Street
10:48 Penzance to Exeter St Davids
10:52 London Paddington to Great Malvern
10:55 Paignton to Exmouth
10:57 Exmouth to Paignton
11:03 London Paddington to Plymouth
11:03 Cheltenham Spa to Swindon
11:18 Paignton to Exmouth
11:24 Exmouth to Paignton
11:52 Worcester Foregate Street to Bristol Temple Meads
11:53 Paignton to Exmouth
11:55 Great Malvern to London Paddington
11:57 Exmouth to Paignton
12:17 Penzance to London Paddington
12:18 Paignton to Exmouth
12:19 Exeter St Davids to Penzance
12:24 Exmouth to Paignton
12:49 Worcester Foregate Street to Bristol Temple Meads
12:50 Penzance to Exeter St Davids
12:54 Paignton to Exmouth
12:57 Exmouth to Paignton
13:20 Paignton to Exmouth
13:20 Hereford to London Paddington
13:50 Penzance to Exeter St Davids
13:53 Paignton to Exmouth
14:20 Penzance to London Paddington
14:22 Exeter St Davids to Plymouth
14:50 Great Malvern to London Paddington
14:55 Paignton to London Paddington
16:20 Penzance to London Paddington
17:00 Great Malvern to London Paddington
17:45 Penzance to London Paddington
Delayed
Additional 10:16 Exeter St Davids to London Paddington
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 24, 2026, 12:10:24 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[93] WECA becomes WEMCA, sometime between December 2024 and January...
[58] Dawlish - permanent resilience work - ongoing discussions
[56] Portishead Line - possible meeting of forum members to explore...
[46] Looe Branch Line - timetables, cancellations, engineering work...
[44] OTD - 24th January (2007&8) - Unrest at First's franchise perf...
[34] Class 175s to Great Western Railway (GWR)
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2]
  Print  
Author Topic: Cardiff Bay Station branch  (Read 23293 times)
jamestheredengine
Transport Scholar
Hero Member
******
Posts: 307


View Profile
« Reply #15 on: March 03, 2024, 22:40:36 »

Big changes being consulted on for the valley lines next summer.

All aberdare and merthyr services will loop clockwise or anticlockwise around the city centre via Radyr- Cathays -Central -Ninian Park-radyr and back up the valleys.

In addition all services from Rhymney  and Bargoed will run to Barry Island and Bridgend via VOG.

The Penarth branch will be served by a 2tph from Coryton abd a 2tph service to Caerphilly.

This gives 6tph between Cardiff and Caerphilly compared to 4tph now.

Cardiff  Bay line gets 4tph to queen Street  shuttle as well as a 2tph service to Pontypridd.  So Cathays to pontypridd still gets 6tph. Cardiff to pontypridd will increase from 5-6,tph (trains per hour) to 8tph.

The cityline gains a Sunday service too so now only the Coryton branch has no trains on sundays

https://tfw.wales/sites/default/files/2023-12/TfW%20Rail%209th%20SA%20%28June%2024%29%20Form%20P.pdf



This is a silly service pattern. Cathays is Wales's 6th busiest station and the busiest station on the entire suburban network north of Queen Street. Cathays is overwhelmingly a south-facing station – the suburban network should be called the Vale of Glamorgan Lines. Very few Cathays passengers want Cardiff Bay. In general, they want Central, interchanges at Central, or stations Cogan to Llantwit Major/Barry Island. If we're messing with the Bay shuttle, it should go to Caerphilly/Coryton as the less busy branches.
Logged

[Image from here is not available to guests]
johnneyw
Transport Scholar
Hero Member
******
Posts: 2666


From station to station, back to Bristol city....


View Profile
« Reply #16 on: March 05, 2024, 23:03:14 »

A day out in Cardiff today took me eventually to Cardiff Bay.  Here's a photo taken from the station shelter showing work coming on for the second platform and line.
This compares to an up thread photo posted in mid December from the same spot.  A lot of the additional platform is already built and the foundations for the rest are being completed.
The intermediate new station on the way to Queen Street is looking even closer to completion.
Logged
grahame
Administrator
Hero Member
*****
Posts: 46184



View Profile WWW Email
« Reply #17 on: March 06, 2024, 02:03:19 »

This is a silly service pattern. Cathays is Wales's 6th busiest station and the busiest station on the entire suburban network north of Queen Street. Cathays is overwhelmingly a south-facing station – the suburban network should be called the Vale of Glamorgan Lines. Very few Cathays passengers want Cardiff Bay. In general, they want Central, interchanges at Central, or stations Cogan to Llantwit Major/Barry Island. If we're messing with the Bay shuttle, it should go to Caerphilly/Coryton as the less busy branches.

It's going to be hard to please everyone, especially when you have different train types coming on the electric and none-electric bits. Looking at Cathays as we were doing a couple of days back - http://www.firstgreatwestern.info/flows.html?stn=3820 - one of the dramatic things there's is how much the pattern has changed in the last five years.  And I would ask how much is the pattern effected by the routes offered - if there were (for impractical example)  Cathays to Bargoed direct services, would that flow come up the rankings too? 
Logged

Coffee Shop Admin, Chair of Melksham Transport User Group, West Wiltshire Rail User Group Committee and TravelWatch SouthWest Board Member
Hafren
Hero Member
*****
Posts: 363


View Profile
« Reply #18 on: March 06, 2024, 20:15:56 »

I think a lot of the pattern changes come down to the way train-trams are to be deployed. Perhaps joining the dots between the following:

• Cardiff Bay extension will be the first 'tram' destination.
• The train-tram depot is in Taffs Well. (Placed here for land availability or political reasons, and service pattern following from this, or located based on service pattern decision...?)
• RCT valleys the most likely (or at least vaguely possible) next 'tram' mode extensions? (Hirwain, Rhondda Fawr etc?)
• The eventual proposed plan (or at least one of them) would have 6tph to CDF (Cardiff Central station) and 6tph to CBD from the RCT axis - so the CDB trains are all extras compared to existing pattern. (Again cause or effect? Already decided to run train-trams from CDB that way so extra services needed, or running to CDB because of desire for extra trains? Worth noting more trains needed in total because train-tram shorter than Sprinter.)

 
Logged
johnneyw
Transport Scholar
Hero Member
******
Posts: 2666


From station to station, back to Bristol city....


View Profile
« Reply #19 on: October 02, 2024, 13:11:30 »

Had a pootle around Cardiff yesterday taking in the Cardiff Bay line to have a look at progress on the upgrades there and take a few pics.
The new platforms, especially at Cardiff Bay itself, are quite generously proportioned but there's still space remaining for the 3rd platform planned for the "Cardiff Crossrail" tram from Cardiff Central station which is due to commence construction next year. 
The intermediate station is also progressing but there's no sign as yet of any electrification works going on that I could see from the train.
The car park on the south side of Central station station is where the tram platforms are to be located with the Bay and tram lines converging after taking a route through Callaghan Square.
Here's the photos that I took from the old bit of the Bay platform that's still in use.

Logged
anthony215
Hero Member
*****
Posts: 1343


View Profile Email
« Reply #20 on: October 02, 2024, 18:09:12 »

Had a pootle around Cardiff yesterday taking in the Cardiff Bay line to have a look at progress on the upgrades there and take a few pics.
The new platforms, especially at Cardiff Bay itself, are quite generously proportioned but there's still space remaining for the 3rd platform planned for the "Cardiff Crossrail" tram from Cardiff Central station which is due to commence construction next year. 
The intermediate station is also progressing but there's no sign as yet of any electrification works going on that I could see from the train.
The car park on the south side of Central station station is where the tram platforms are to be located with the Bay and tram lines converging after taking a route through Callaghan Square.
Here's the photos that I took from the old bit of the Bay platform that's still in use.



398s are to start entering service summer 2025 starting on the Pontypridd to Cardiff Bay service.

756/1s starting entering service 11th november the 756/'s will enter service spring 2025 on the Coryton/Caerphilly to Penarth shuttles
Logged
johnneyw
Transport Scholar
Hero Member
******
Posts: 2666


From station to station, back to Bristol city....


View Profile
« Reply #21 on: May 17, 2025, 10:40:47 »

There's been considerable recent change at Cardiff Bay station.  The line itself is currently out of operation while the current set of works are underway which includes the electrification infrastructure.  Below are yesterday's photos Cardiff Bay station taken from various viewpoints and angles.  The old fencing has gone as has pretty much entirety the old platform. The catenary is clearly visible now.  Additionally, it can be better seen more how the third platform (serving the future tram direct to Cardiff Central) will fit into the scheme.
Photos below.
Logged
johnneyw
Transport Scholar
Hero Member
******
Posts: 2666


From station to station, back to Bristol city....


View Profile
« Reply #22 on: May 17, 2025, 10:45:32 »

A few more photos, the last one being the intermediate new station between the bay and Queen Street.

Logged
anthony215
Hero Member
*****
Posts: 1343


View Profile Email
« Reply #23 on: May 18, 2025, 17:19:16 »

A few more photos, the last one being the intermediate new station between the bay and Queen Street.



Butetown and just further north is the new allingement and junction being built for the link towards Cardiff Central
Logged
Chris from Nailsea
Administrator
Hero Member
*****
Posts: 21149



View Profile Email
« Reply #24 on: May 18, 2025, 17:57:52 »

Thanks for your updates and pictures, johnneyw - much appreciated by those of us who are not in that area.

CfN.
Logged

William Huskisson MP (Member of Parliament, or Mile Post (a method of measuring the railway in miles and chains from a starting point - usually London), depending on context) was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: Stop, Look, Listen.

"Level crossings are safe, unless they are used in an unsafe manner."  Discuss.
anthony215
Hero Member
*****
Posts: 1343


View Profile Email
« Reply #25 on: May 27, 2025, 00:34:37 »

Platform 1 is now out of use at Cardiff Bay with Platform 2 having come into use and this only being accessible from lloyd George avenue
Logged
johnneyw
Transport Scholar
Hero Member
******
Posts: 2666


From station to station, back to Bristol city....


View Profile
« Reply #26 on: September 19, 2025, 12:22:11 »

Having an afternoon in Cardiff so took these pictures of progress at Cardiff Bay station.
Platform 1 still closed.  Only a couple of people working within the station limits today moving some fencing around.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page