Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 03:15 22 Jul 2026
 
- Ryanair boss says 'foreign object' may have caused plane window incident
- Ryanair broken window may have been caused by 'foreign object'
- Union plans rail strikes over train safety concerns
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 tomorrow - WOMAD festival in Wiltshire
29/07/26 - TransWilts AGM
01/08/26 - Avoncliff to Weymouth day out
12/08/26 - Solar eclipse

No 'On This Day' events reported for 22nd Jul

Train RunningCancelled
10:33 Reading to Basingstoke
11:23 Basingstoke to Reading
etc
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
July 22, 2026, 03:27:51 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[225] Bridge hit - again "Freshford" = Limpley Stoke?
[156] Andy Burnham has become Prime Minister, with a strong transpor...
[49] Ryanair - routes, schedules, incidents and issues (merged post...
[44] Interrail trip 4 - the Home to Harwich to Hook experience
[44] WOMAD comes to Wiltshire - nearest station, Melksham, July 202...
[30] Swing Bridges
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2] 3
  Print  
Author Topic: Disruption to train services between Reading and London - ongoing discussion  (Read 11634 times)
broadgage
Transport Scholar
Hero Member
******
Posts: 5880



View Profile
« Reply #15 on: July 05, 2026, 19:18:17 »

Modern batteries need very little maintenance, and diesel engines less than in the past.
A seldom used battery should last half the life of the train.
I would design for battery operation at about  a half of normal speed to keep costs down.
I also believe that all new trains should be fitted with opening windows for hot weather air conditioning failures. Electrically  locked to prevent needless opening.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
grahame
Administrator
Hero Member
*****
Posts: 47289



View Profile WWW Email
« Reply #16 on: July 05, 2026, 19:23:44 »

So the question, to which I don't believe we the customers have ever received a full and frank answer from Network Rail, is 'Why is the railway infrastructure between London Paddington & Reading, and more particularly it seems to me between Paddington & Slough, so horrendously unreliable?'

Answers on a very large postcard.

This may be of some interest - although not much information was forthcoming...............

https://www.firstgreatwestern.info/coffeeshop/index.php?topic=29248.0

I am going to risk a summary - on just a medium sized postcard of some of the elements as I understand them:

1. Electrification to Airport Junction was done relatively 'light' with equipment designed, tested as tolerances for a relatively light electric unit running at up to 90 mph every 15 minutes rather that much longer and heavier trains, some running at higher speeds every 5 minutes on 2 lines each way.

2. There are 30 different models of points and motors across Network Rail, and no fewer than 15 of them may be found on the stretch from Paddington to Reading.  This brings a spares issue, and a knowledge issue with onsite staff not building up a daily knowledge of just one or two types, so that fixes are not routine daily jobs

3. Reduced infrastructure maintenance of the old embankments and cuttings and trackbed lead to things like slips and wetness  and earthwork decay, and that is not helped by climate changes - more extremes of weather that push the whole shooting match towards the limits of operation, and where it tends to wear/age more quickly, on more occasions

4. The lack of steam engines throwing out smoke and soot makes for a cleaner line side, which means that plants / greenery grows far more and is likely to impinge on the railway

5. The UK (United Kingdom)' modern health and safety regimes require far more caution as to how things run when there is a potential problem, and a ganger can't go out and just tweak something or bang home a rail clip that's a bit loose any more between trains.  And trains aren't allowed to run in "it'll probably hold out" track mode.

There's potentially a load of tosh in what I write - I welcome comments on the above to put me right, or to add other items.
Logged

Coffee Shop Admin, Chair of Melksham Transport User Group, West Wiltshire Rail User Group Committee and TravelWatch SouthWest Board Member
bobm
Administrator
Hero Member
*****
Posts: 10711



View Profile
« Reply #17 on: July 05, 2026, 21:35:05 »

Suggesting the forum owner is writing a load of tosh is hardly likely to be a good career move.   Grin

One other thing to consider is trackside maintenance.  A more intensive service and changes to what can and cannot be done on or adjacent to a live line makes track access more difficult.
Logged
grahame
Administrator
Hero Member
*****
Posts: 47289



View Profile WWW Email
« Reply #18 on: July 05, 2026, 22:18:18 »

Suggesting the forum owner is writing a load of tosh is hardly likely to be a good career move.   Grin

It's AOK by invite, mind you.

Quote
One other thing to consider is trackside maintenance.  A more intensive service and changes to what can and cannot be done on or adjacent to a live line makes track access more difficult.

Yes - I had intended that to be a part of / subtext of point no.5 and perhaps should have been more specific.
Logged

Coffee Shop Admin, Chair of Melksham Transport User Group, West Wiltshire Rail User Group Committee and TravelWatch SouthWest Board Member
Chris from Nailsea
Administrator
Hero Member
*****
Posts: 22179



View Profile Email
« Reply #19 on: July 05, 2026, 22:21:48 »

I have been noted for occasionally writing a load of tosh on the Coffee Shop forum ...  Wink Cheesy Grin
Logged

William Huskisson MP (Member of Parliament, or Mile Post (a method of measuring the railway in miles and chains from a starting point - usually London), depending on context) was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: Stop, Look, Listen.

"Level crossings are safe, unless they are used in an unsafe manner."  Discuss.
Bob_Blakey
Transport Scholar
Hero Member
******
Posts: 1018


View Profile
« Reply #20 on: July 06, 2026, 07:58:22 »


.....2. There are 30 different models of points and motors across Network Rail, and no fewer than 15 of them may be found on the stretch from Paddington to Reading.  This brings a spares issue, and a knowledge issue with onsite staff not building up a daily knowledge of just one or two types, so that fixes are not routine daily jobs.....

Given the apparently high level of 'points failures' on the specified route this surely has to be relevant; on the face of it having such an extensive portfolio of switching control equipment looks pretty daft for a number of reasons but it maybe wouldn't be so bad if the kit didn't seemingly fail so frequently.
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 9495



View Profile
« Reply #21 on: July 06, 2026, 08:18:08 »

..............and there's the constant signal failures too (today being a good example), any idea why they are also so fragile?
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 14236


View Profile Email
« Reply #22 on: July 06, 2026, 09:17:40 »

Likely to be axel counters going down rather than actual signals
Logged
bobm
Administrator
Hero Member
*****
Posts: 10711



View Profile
« Reply #23 on: July 06, 2026, 12:55:31 »

If there are indeed 15 different types of points equipment, I wonder if any lessons are being learned about which are more reliable than others?   (Or are they all just as bad!)
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5880



View Profile
« Reply #24 on: July 06, 2026, 16:19:22 »

Likely to be axel counters going down rather than actual signals
I seem to remember that axel counters were going to make the railway "more reliable"
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
IndustryInsider
Data Manager
Hero Member
******
Posts: 10759


View Profile
« Reply #25 on: July 06, 2026, 18:27:04 »

Likely to be axel counters going down rather than actual signals
I seem to remember that axel counters were going to make the railway "more reliable"

They’re generally perceived to be more reliable than the Track Circuits they replaced. 

Interesting read here:
https://www.railengineer.co.uk/train-detection/
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
John D
Hero Member
*****
Posts: 368


View Profile
« Reply #26 on: July 08, 2026, 08:29:53 »


More disruption, due to expected heat.

Quote
Due to forecasted severe weather between London Paddington and Reading fewer trains are able to run.
Impact: Train services running to and from these stations may be cancelled, delayed or revised. Disruption is expected until the end of the day on 09/07/26.
Customer Advice:
We are sorry for the disruption to your journey.
What has happened?
The high temperatures that are forecast for today can lead to an increase in points failures.
Points are the moving pieces of metal that enable trains to change tracks.

But Met office do not even think warm/hot weather even justifies a yellow warning, there are no warnings, no severe weather is forecast

https://weather.metoffice.gov.uk/warnings-and-advice/uk-warnings#?date=2026-07-08

So why do team that update the headline disruption banner on GWR (Great Western Railway) website think there will be severe weather when Met Office doesn't (or have they simply cut and paste wrong excuse)

There is however a Health heat warning (which doesn't affect points) risk factor 12, (medium risk, 60-89% probability of affecting those with poor health)

https://ukhsa-dashboard.data.gov.uk/weather-health-alerts/heat

Has someone misinterpreted a health warning as severe weather ?

Something doesn't add up here

Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 14236


View Profile Email
« Reply #27 on: July 08, 2026, 08:52:27 »

Because the Met Office don't put out rail heat warnings.

30 degrees full sun will mean 50-plus on the rails....but that doesn't affect the weather, so to speak
Logged
John D
Hero Member
*****
Posts: 368


View Profile
« Reply #28 on: July 08, 2026, 09:18:55 »

Because the Met Office don't put out rail heat warnings.

30 degrees full sun will mean 50-plus on the rails....but that doesn't affect the weather, so to speak

But that happens multiple days most years, not exceptional once a decade stuff, so why do they install points that are only good for 93-97% of days in our climate.  We are at about 10th day already this year, and not workable about 20 days out of 365 really isn't the correct spec.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 14236


View Profile Email
« Reply #29 on: July 08, 2026, 09:22:55 »

Because they have also to be handle below zero temperatures (more often until this year than 30-plus degrees.....

Few places in Europe get the spread of temperatures that we are now seeing....
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2] 3
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page