So the question, to which I don't believe we the customers have ever received a full and frank answer from Network Rail, is 'Why is the railway infrastructure between London Paddington & Reading, and more particularly it seems to me between Paddington & Slough, so horrendously unreliable?'
Answers on a very large postcard.
This may be of some interest - although not much information was forthcoming...............
https://www.firstgreatwestern.info/coffeeshop/index.php?topic=29248.0I am going to risk a summary - on just a medium sized postcard of some of the elements
as I understand them:
1. Electrification to Airport Junction was done relatively 'light' with equipment designed, tested as tolerances for a relatively light electric unit running at up to 90 mph every 15 minutes rather that much longer and heavier trains, some running at higher speeds every 5 minutes on 2 lines each way.
2. There are 30 different models of points and motors across Network Rail, and no fewer than 15 of them may be found on the stretch from Paddington to Reading. This brings a spares issue, and a knowledge issue with onsite staff not building up a daily knowledge of just one or two types, so that fixes are not routine daily jobs
3. Reduced infrastructure maintenance of the old embankments and cuttings and trackbed lead to things like slips and wetness and earthwork decay, and that is not helped by climate changes - more extremes of weather that push the whole shooting match towards the limits of operation, and where it tends to wear/age more quickly, on more occasions
4. The lack of steam engines throwing out smoke and soot makes for a cleaner line side, which means that plants / greenery grows far more and is likely to impinge on the railway
5. The
UK▸ ' modern health and safety regimes require far more caution as to how things run when there is a potential problem, and a ganger can't go out and just tweak something or bang home a rail clip that's a bit loose any more between trains. And trains aren't allowed to run in "it'll probably hold out" track mode.
There's potentially a load of tosh in what I write - I welcome comments on the above to put me right, or to add other items.