Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 18:35 16 Oct 2026
 
- Ship attack reports near Hormuz reach record high as oil exports slow
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 tomorrow - Flying Scotsman - Wiltshire
24/10/26 - Industrial Heritage
29/10/26 - Life of two halves, Oxford
25/11/26 - WWRUG / Nathan Sealey / Metros

On this day
16th Oct (1905)
Lacock Halt opened (link)

Train RunningCancelled
15:48 London Paddington to Swansea
18:03 Cheltenham Spa to London Paddington
19:04 Oxford to Bristol Temple Meads
19:06 London Paddington to Bedwyn
19:15 Bristol Temple Meads to Oxford
20:42 Bedwyn to London Paddington
21:03 Oxford to Bristol Temple Meads
21:10 Bristol Temple Meads to Oxford
Short Run
15:23 Portsmouth Harbour to Cardiff Central
16:57 Exmouth to Paignton
18:20 Paignton to Exmouth
18:26 Exmouth to Paignton
20:02 Cheltenham Spa to London Paddington
Delayed
14:36 London Paddington to Penzance
16:18 London Paddington to Carmarthen
16:30 London Paddington to Taunton
18:30 Plymouth to Penzance
•
PollsThere are no open or recent polls
•
Abbreviation pageAcronymns and abbreviations
•
Stn ComparatorStation Comparator
•
Rail newsNews Now - live rail news feed
• • Site Style 1 2 3 4
Next departures • Bristol Temple Meads • Bath Spa • Chippenham • Swindon • Didcot Parkway • Reading • London Paddington • Melksham
Exeter St Davids • Taunton • Westbury • Trowbridge • Bristol Parkway • Cardiff Central • Oxford • Cheltenham Spa • Testing!
October 16, 2026, 18:41:30 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[91] Jonathan Jones-Pratt, RIP
[64] Delay Repay bouncing around
[44] Server slow ...
[44] Devizes 52-year wait for train station could end
[41] 50th anniversary of the introduction of HST's on the route
[40] Ryanair - routes, schedules, incidents and issues (merged post...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Network Rail: leaked report  (Read 3721 times)
Mark A
Global Moderator
Hero Member
*****
Posts: 3187



View Profile
« on: April 17, 2023, 18:36:17 »

Covered in the Independent here:

https://www.independent.co.uk/travel/news-and-advice/train-delays-network-rail-cancellations-misery-b2315578.html

Mark
Logged
grahame
Administrator
Hero Member
*****
Posts: 48104



View Profile WWW Email
« Reply #1 on: April 17, 2023, 20:34:40 »


Short quote from that for critical review:

Quote
Britain’s teetering railways face more delays and cancellations because there is not enough money to maintain them, Network Rail has privately admitted. ...

A leaked presentation obtained by The Independent says that the government’s funding plans for the next five years will not allow Network Rail to “operate, maintain and renew” the railway at its current level of reliability.

[snip]

The slides, intended for rail industry bosses and marked “official-sensitive- commercial”, warn that delays caused by crumbling infrastructure – such as tracks, bridges and earthworks – are expected to worsen amid rising costs and inadequate funding.

Rail unions said the revelations about shortfalls in maintenance funding highlight what amounts to a “managed decline” of the railway network.
Logged

Coffee Shop Admin, Chair of Melksham Transport User Group, West Wiltshire Rail User Group Committee and TravelWatch SouthWest Board Member
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 9747



View Profile
« Reply #2 on: April 18, 2023, 06:37:37 »

HS2▸ (The next High Speed line(s)) now looking ever more like an extension being built on a collapsing house.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 14424


View Profile Email
« Reply #3 on: April 18, 2023, 07:05:27 »

Eh? That reporf has nothing about HS2▸ (The next High Speed line(s)) funding
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 9747



View Profile
« Reply #4 on: April 18, 2023, 07:16:33 »

Eh? That reporf has nothing about HS2▸ (The next High Speed line(s)) funding

You're absolutely right, just adding a bit of context - £100+ billion can be found for a vanity project that is largely neither wanted nor needed, whilst the basic infrastructure is allowed to rot away.

Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 14424


View Profile Email
« Reply #5 on: April 18, 2023, 07:22:01 »

Might be worth understanding the difference between capital expenditure (HS2▸ (The next High Speed line(s))) and Revsnue expenditure (Network Rail Control Periods)
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 2324


Hockley viaduct


View Profile
« Reply #6 on: April 18, 2023, 07:53:37 »

Quote
highlight what amounts to a “managed decline” of the railway network.

Interestingly the word "railway" does not appear in the government consultation on "Draft air quality strategy"

https://consult.defra.gov.uk/air-quality-strategy-review-team/consultation-on-the-draft-revised-air-quality-stra/supporting_documents/Draft%20air%20quality%20strategy.pdf

The section on Public Transport only refers to buses. Does this suggest that railways do not seriously figure in the government's long-term planning?
Logged
JayMac
Data Manager
Hero Member
******
Posts: 19655



View Profile
« Reply #7 on: April 18, 2023, 08:52:59 »

Might be worth understanding the difference between capital expenditure (HS2▸ (The next High Speed line(s))) and Revsnue expenditure (Network Rail Control Periods)

Might be worth understanding that the ultimate financier is the UK▸ (United Kingdom) Treasury. They can decide where £100bn should be spent. Also, long term financing to improve the existing rail network, it's stations and rolling stock will be capital expenditure. Enhancements and renewals of Network Rail assets during a control period are capital expenditure.

In 2021-22 Network Rail capex was around £5.7bn. Opex around £4.6bn.
« Last Edit: April 18, 2023, 09:06:53 by JayMac » Logged

Dalmeny Caterham Shiplake Tonbridge Theale Carlisle Petts Wood
Electric train
Transport Scholar
Hero Member
******
Posts: 4701


I am a retired railway Electrification Engineer


View Profile
« Reply #8 on: April 18, 2023, 17:48:56 »

There are concerns within NR» (Network Rail - home page) that many items that need to be renewed, repaired will have to be sweated to breaking point or close to.  There are fears that reduction in frequency, max line speed and even lengths of trains will have to be put in place.  Some of the Statutory items such as PCB and ACBM etc removal will be a struggle to meet, the de-carbonisation targets set by Government my have to be differed.

It has been known since the CP6▸ (Control Period 6 - The five year period between 2019 and 2024) determination that funding in CP7▸ (Control Period 7 - The five year period between 2024 and 2029) was going to be tighter but it seems its even more stringent in addition NR has to reduce its Maintenance costs by £100M every year as of 1st Apr 2023 for at least to the end of CP7
Logged

"The real source of danger, and the only one which there is any hope of removing, is in a complication of imperfections in a great number of the mechanical parts of the system"
Isambard Kingdom Brunel
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #9 on: April 19, 2023, 11:48:41 »

There are concerns within NR» (Network Rail - home page) that many items that need to be renewed, repaired will have to be sweated to breaking point or close to.  There are fears that reduction in frequency, max line speed and even lengths of trains will have to be put in place.  Some of the Statutory items such as PCB and ACBM etc removal will be a struggle to meet, the de-carbonisation targets set by Government my have to be differed.

It has been known since the CP6▸ (Control Period 6 - The five year period between 2019 and 2024) determination that funding in CP7▸ (Control Period 7 - The five year period between 2024 and 2029) was going to be tighter but it seems its even more stringent in addition NR has to reduce its Maintenance costs by £100M every year as of 1st Apr 2023 for at least to the end of CP7
What are PCB and ACBM please? I had a look in the list of abbreviations and tried googling, but couldn't find either.
Logged

Waiting at Pilning for the midnight sleeper to Prague.
Red Squirrel
Administrator
Hero Member
*****
Posts: 5730


There are some who call me... Tim


View Profile
« Reply #10 on: April 19, 2023, 12:15:06 »

My googling suggests ACBM is asbestos-containing building material, and PCB is polychlorinated biphenyls. These are both hazardous materials which NR» (Network Rail - home page) have a statutory duty to make safe.

See https://safety.networkrail.co.uk/wp-content/uploads/2018/06/Polychlorinated-Biphenyls-Guidance-Note.pdf
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #11 on: April 19, 2023, 16:27:51 »

Ah – I'd also found ACBM = asbestos-containing building materials, and I think somewhere in the back of my mind I had even heard of polychlorinated biphenyls, but I'd been convinced there must be a railway-specific meaning.
Logged

Waiting at Pilning for the midnight sleeper to Prague.
WSW Frome
Transport Scholar
Sr. Member
******
Posts: 235


View Profile
« Reply #12 on: April 19, 2023, 16:33:33 »

PCB's can be found in older versions of larger electrical transformer oils (coolants). Network Rail likely have a good few of these. PCB containing oils are deemed to be hazardous if they escape into the environment and usually can only be disposed of by high-temperature incineration.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4701


I am a retired railway Electrification Engineer


View Profile
« Reply #13 on: April 19, 2023, 17:05:15 »

PCB's can be found in older versions of larger electrical transformer oils (coolants). Network Rail likely have a good few of these. PCB containing oils are deemed to be hazardous if they escape into the environment and usually can only be disposed of by high-temperature incineration.

The majority of the PCB contaminated items have been removed, but, and there is always a but, the Environment Agency in line with a Government directive have changed the contamination levels and volumes this now brings in a range of smaller transformers typically low voltage (400 / 650V) 60kVA and below which are not normally tested for dissolved gas like high Voltage transformers.

ACBM are found in items like "Marley" floor tiles, linoleum, ceiling tiles, electrical switchgear .................... it goes on the stuff has been around for decades;  BR▸ (British Rail(ways)) had a policy of not using asbestos at all after around 1980
Logged

"The real source of danger, and the only one which there is any hope of removing, is in a complication of imperfections in a great number of the mechanical parts of the system"
Isambard Kingdom Brunel
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of page • Jump to Forum Home Page