Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 13:55 15 Jun 2025
 
* UK sending more RAF jets to Middle East
- Seven people killed in India helicopter crash
* Man seriously hurt in airport car park incident
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/06/25 - Rail Live 2025
24/06/25 - GWR Community Rail Conf
26/06/25 - TWNW conference
05/07/25 - Railfuture AGM

On this day
15th Jun (2018)
GWR Community Rail conference at Swindon (link)

Train RunningCancelled
15/06/25 10:50 Penzance to Exeter St Davids
15/06/25 12:55 Bristol Parkway to London Paddington
15/06/25 13:12 Worcester Foregate Street to London Paddington
13:49 Penzance to Exeter St Davids
15/06/25 13:51 Liskeard to Looe
13:55 Bristol Parkway to London Paddington
14:30 London Paddington to Bristol Temple Meads
15/06/25 14:33 Looe to Liskeard
15/06/25 14:54 Paignton to London Paddington
15:12 Liskeard to Looe
15:30 London Paddington to Bristol Temple Meads
15:41 Bristol Temple Meads to Salisbury
15:44 Looe to Liskeard
15:45 London Paddington to Bristol Parkway
16:00 Bristol Temple Meads to London Paddington
16:25 Liskeard to Looe
15/06/25 16:27 Exeter St Davids to Penzance
17:04 Looe to Liskeard
17:09 Portsmouth Harbour to Bristol Parkway
17:33 London Paddington to Cheltenham Spa
17:44 Swindon to Salisbury
17:55 Liskeard to Looe
17:59 Salisbury to Bristol Temple Meads
18:36 London Paddington to Plymouth
18:45 Looe to Liskeard
18:45 London Paddington to Bristol Parkway
18:55 Bristol Temple Meads to Taunton
19:09 Portsmouth Harbour to Bristol Parkway
19:40 Gloucester to Bristol Temple Meads
19:59 Salisbury to Bristol Temple Meads
20:00 Cheltenham Spa to Swindon
20:15 Liskeard to Looe
20:16 Taunton to Bristol Temple Meads
20:26 Exeter St Davids to Bristol Temple Meads
20:49 Looe to Liskeard
20:53 Bristol Temple Meads to Taunton
21:45 London Paddington to Bristol Parkway
21:54 Worcester Shrub Hill to Bristol Temple Meads
Short Run
11:49 Penzance to Exeter St Davids
12:26 Gatwick Airport to Reading
13:03 London Paddington to Plymouth
13:14 Exeter Central to Barnstaple
13:32 Swindon to Weymouth
14:05 Frome to Swindon
14:26 Gatwick Airport to Reading
15:27 Exeter St Davids to Penzance
16:03 London Paddington to Penzance
16:05 Weymouth to Bristol Temple Meads
16:43 Frome to Swindon
17:08 Exeter St Davids to Penzance
17:13 London Paddington to Swindon
18:40 Bristol Temple Meads to Portsmouth Harbour
18:50 Swindon to London Paddington
19:38 Bristol Temple Meads to Worcester Shrub Hill
Delayed
11:03 London Paddington to Newquay
12:18 Penzance to London Paddington
etc
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
June 15, 2025, 14:05:36 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[139] Weymouth - Westbury cancellations, 14 and 15 June 2025
[88] Looe Branch Line - timetables, cancellations, engineering work...
[76] European Passengers Federation - 13th and 14th June 2025
[61] Bus Service 205
[41] Gone to the dogs? A look at greyhound racing's future - June 2...
[39] Storing petrol
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Reading: Work on 106-year-old bridge to disrupt traffic  (Read 12474 times)
CyclingSid
Data Manager
Hero Member
******
Posts: 2144


Hockley viaduct


View Profile
« on: February 10, 2023, 07:34:40 »

For those travelling from Reading east bound on the A4 for the next three months:

https://www.bbc.co.uk/news/uk-england-berkshire-64583584

This is the bridge next to Palmer Park that carries the North Downs line and the Waterloo line.
Logged
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #1 on: February 10, 2023, 08:42:08 »

Quote
The company said off peak working would not be possible due to the need for scaffolding to support the carriageway.
It's not the usual meaning of carriageway, but it does carry carriages.
Logged

Waiting at Pilning for the midnight sleeper to Prague.
stuving
Transport Scholar
Hero Member
******
Posts: 7449


View Profile
« Reply #2 on: February 10, 2023, 08:59:13 »

Quote
The company said off peak working would not be possible due to the need for scaffolding to support the carriageway.
It's not the usual meaning of carriageway, but it does carry carriages.

That one looks like the BBC» (British Broadcasting Corporation - home page)'s fault. Railadvent has a direct quote:
Quote
Network Rail Southern region’s spokesman Chris Denham said: “We’re going to shot-blast the steel back to bare metal, treat any corrosion and then give it a coat of green paint, which won’t just keep the bridge looking good, but will keep the structure in good condition to carry trains well into its second century.

“Clearly London Road is an important route into Reading so we’re going to paint half the bridge at a time, keeping one lane of the road open at all times, with temporary traffic lights.

“It’s not ideal as we know this will cause some disruption, but the nature of the work and the need to keep our people safe while doing it, means we need to take this step. We’ll also make sure there’s a safe pedestrian route too.

“I’m very grateful to our neighbours in the town, who’ll be hearing and seeing us work between 7am and 6pm for the next three months, but we will get a much nicer looking bridge out of the job at the end of it.”

Temporary traffic lights will see sides of the road swapped approximately halfway through the project which will allow painting to cover both sides of the bridge.

Due to the nature of the project, the structure will be hidden by scaffolding and a sheeted covering will prevent paint and debris from escaping the working environment.

Looking at pictures of the bridge, it's actually two of them side by side. The gap between them is pretty narrow - about 20 cm by nearly 2 m deep, I reckon. So how do you shot-blast and paint the sides facing that gap? Small painters (which is presumably what the Victorians would have done, though not on that bridge)? Long-handled brushes? Fancy machines? And if it needs more preparation or repair, how do you do that?
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7449


View Profile
« Reply #3 on: February 10, 2023, 09:03:46 »

A google search for something direct from NR» (Network Rail - home page) came up with a picture, dated 9/2/23, but no words. Presumably something will appear soon to use the picture. I guess it's better that way round than a story with a missing link to start with.
« Last Edit: February 10, 2023, 09:25:47 by stuving » Logged
Mark A
Global Moderator
Hero Member
*****
Posts: 2031


View Profile
« Reply #4 on: February 10, 2023, 11:29:23 »

I can't find it, perhaps because the powers of Google search and the likes are fading rapidly, or perhaps because it's no longer up: someone from the GWSR was blogging on their bridge repairs, including the rail over road steel span at Gretton. This showed how corrosion at the ends of the bridge - where it sat on the abutments - was addressed. In that case I think I recall the span was jacked up enough to allow weld repairs, grit-blasting and recoating.

Since steel, once unprotected has no issue with rotting away in damp inaccessible locations and I've always wondered about how this is tackled in the difficult-of-access ends of a steel bridge, let alone if the span is of a nature it cannot be raised.

Mark
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7449


View Profile
« Reply #5 on: February 10, 2023, 15:40:08 »

And here is NR» (Network Rail - home page)'s version of what's going to be done (you've already seen the picture in it):
Quote
Temporary traffic lights planned for main road into Reading - until May - as Network Rail begins work improving 1917 railway bridge

A railway bridge over one of the main routes into Reading is about to get a new lease of life thanks to Network Rail engineers, who will be bringing it back to life with a new paint job.

The 106-year-old bridge over London Road in Wokingham Borough, and on the very edge of Reading Borough, carries the line between Wokingham and Reading on its way into the town. The paint has faded and worn and needs completely replacing to stop the structure from rusting.

Work will begin on Monday, 13 February, and continue right through until Tuesday, 9 May. Works will take place between 7am and 6pm each day. Off peak working is not possible in this instance due to scaffolding requiring supports on the carriageway itself. This means traffic lanes cannot be reopened at peak times.

    Network Rail Southern region’s spokesman Chris Denham said: “We’re going to shotblast the steel back to bare metal, treat any corrosion and then give it a coat of green paint, which won’t just keep the bridge looking good, but will keep the structure in good condition to carry trains well into its second century.

    “Clearly London Road is an important route into Reading so we’re going to paint half the bridge at a time, keeping one lane of the road open at all times, with temporary traffic lights.

    “It’s not ideal as we know this will cause some disruption, but the nature of the work and the need to keep our people safe while doing it, means we need to take this step. We’ll also make sure there’s a safe pedestrian route too.

    “I’m very grateful to our neighbours in the town, who’ll be hearing and seeing us work between 7am and 6pm for the next three months, but we will get a much nicer looking bridge out of the job at the end of it.”

The temporary traffic lights will swap sides of the road roughly halfway through the project, to allow painting to cover both sides of the structure. The nature of the work means the structure will be hidden by scaffolding and a sheeted covering, to stop paint and debris from escaping the worksite.
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 2144


Hockley viaduct


View Profile
« Reply #6 on: February 12, 2023, 15:53:14 »

I have just been under the bridge and had a look from the pavement.

Yes it is two bridges side by side. My uncalibrated eyeballs think it might be a foot between the flanges at the bottom of the bridge deck, and possibly three feet between the sides. In case of dispute refer to my optometrist.
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 2144


Hockley viaduct


View Profile
« Reply #7 on: March 29, 2023, 07:05:01 »

Well the paint is on one half of the bridge. I wonder how long before it is "tagged".
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 2144


Hockley viaduct


View Profile
« Reply #8 on: May 22, 2023, 18:07:55 »

The job is now complete; scaffolding and traffic lights removed.

Panels in what I guess is Malachite Green, framework and remainder in Black.
Logged
bobm
Administrator
Hero Member
*****
Posts: 10261



View Profile
« Reply #9 on: May 28, 2023, 10:42:55 »

Had a look at this bridge yesterday.



Slightly odd underneath.  Some of the compartments have been netted over to prevent birds roosting - but many haven't.



Could this be another "Taunton" problem in the making?
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page