Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 17:15 15 Jun 2025
 
- UK advises against all travel to Israel
* HS2 reports subcontractor over alleged fraud
* Man hurt after vehicle falls from airport car park
- Seven people killed in India helicopter crash
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/06/25 - Rail Live 2025
21/06/25 - BRC to Lydney
24/06/25 - GWR Community Rail Conf
26/06/25 - TWNW conference

On this day
15th Jun (2018)
GWR Community Rail conference at Swindon (link)

Train RunningCancelled
13:35 Newquay to London Paddington
14:03 London Paddington to Penzance
15/06/25 14:54 Paignton to London Paddington
15:03 London Paddington to Plymouth
15:30 London Paddington to Bristol Temple Meads
15:41 Bristol Temple Meads to Salisbury
16:00 Bristol Temple Meads to London Paddington
15/06/25 16:27 Exeter St Davids to Penzance
16:32 Swindon to Cheltenham Spa
17:09 Portsmouth Harbour to Bristol Parkway
17:33 London Paddington to Cheltenham Spa
17:41 Gloucester to Bristol Temple Meads
17:44 Swindon to Salisbury
17:59 Salisbury to Bristol Temple Meads
18:36 London Paddington to Plymouth
18:38 Bristol Temple Meads to Gloucester
18:45 London Paddington to Bristol Parkway
18:55 Bristol Temple Meads to Taunton
19:09 Portsmouth Harbour to Bristol Parkway
19:40 Gloucester to Bristol Temple Meads
19:59 Salisbury to Bristol Temple Meads
20:00 Cheltenham Spa to Swindon
20:16 Taunton to Bristol Temple Meads
20:26 Exeter St Davids to Bristol Temple Meads
20:53 Bristol Temple Meads to Taunton
21:30 Swindon to Cheltenham Spa
21:45 London Paddington to Bristol Parkway
21:54 Worcester Shrub Hill to Bristol Temple Meads
Short Run
14:18 Penzance to London Paddington
15:27 Exeter St Davids to Penzance
16:03 London Paddington to Penzance
16:05 Weymouth to Bristol Temple Meads
16:08 Weston-Super-Mare to Severn Beach
16:43 Frome to Swindon
17:08 Exeter St Davids to Penzance
17:13 London Paddington to Swindon
17:35 Severn Beach to Exeter St Davids
18:00 Cheltenham Spa to Swindon
18:40 Bristol Temple Meads to Portsmouth Harbour
18:50 Swindon to London Paddington
19:38 Bristol Temple Meads to Worcester Shrub Hill
21:55 Bristol Parkway to London Paddington
23:00 London Paddington to Bristol Temple Meads
Delayed
12:18 Penzance to London Paddington
19:29 Swindon to Cheltenham Spa
21:00 Cheltenham Spa to Swindon
23:13 Swindon to Cheltenham Spa
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
June 15, 2025, 17:16:42 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[214] Looe Branch Line - timetables, cancellations, engineering work...
[146] Weymouth - Westbury cancellations, 14 and 15 June 2025
[56] Storing petrol
[56] European Passengers Federation - 13th and 14th June 2025
[44] Bus Service 205
[30] Gone to the dogs? A look at greyhound racing's future - June 2...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 [3]
  Print  
Author Topic: Collision between two trains at Llanbrynmair, in Powys, Wales - 21 October 2024  (Read 12574 times)
grahame
Administrator
Hero Member
*****
Posts: 44240



View Profile WWW Email
« Reply #30 on: October 27, 2024, 18:34:32 »

Not seen anything saying if the coach's were removed by rail or road.

All of the major sources use the same words
https://www.bbc.co.uk/news/articles/cr7n5myvle0o
https://news.tfw.wales/news/cambrian-line-to-reopen-following-rail-accident
https://www.walesonline.co.uk/news/wales-news/wales-train-crash-update-line-30233213

Quote
Transport for Wales (TfW (Transport for Wales)) is in the process of removing the two trains

As an educated guess, I would think that's because they or some of their readers might consider it insensitive or ghoulish to talk about how the remains are removed at a place where some were seriously injured and which perhaps triggered the passing of one person too.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
Mark A
Global Moderator
Hero Member
*****
Posts: 2031


View Profile
« Reply #31 on: October 28, 2024, 09:08:05 »

The line has reopened for the start of service this morning.

Mark
Logged
grahame
Administrator
Hero Member
*****
Posts: 44240



View Profile WWW Email
« Reply #32 on: October 28, 2024, 09:54:12 »

There is a good summary on Wikipedia including a track diagram and further detail not in the general press. It includes "The two trains were separated on 24 October and taken to Machynlleth by rail the next day" which answers a question asked here previously.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
infoman
Hero Member
*****
Posts: 1549


View Profile
« Reply #33 on: October 28, 2024, 10:49:16 »

Thank you Grahame for the update.
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5699



View Profile
« Reply #34 on: October 28, 2024, 11:31:46 »

It seems to me that there is a small but real risk of a similar accident occurring in the future, unless mitigated by by very restrictive speed limits.
Sounds as though trap points would help. It appears that one train was driven correctly into the passing loop, where it should have been held at the signal protecting the exit from the loop onto the main line.
There has been no suggestion of any signalling failure, one may therefore presume that this signal was passed at danger due to poor adhesion.
Trap points, interlocked with the signal protecting the exit from the loop would prevent any repeat. Exit signal showing a proceed aspect=points in the normal position allowing train onto main line.
Exit signal at danger=trap points automatically set to divert the train into a sand drag.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Witham Bobby
Transport Scholar
Hero Member
******
Posts: 768



View Profile
« Reply #35 on: October 28, 2024, 11:53:37 »

It seems to me that there is a small but real risk of a similar accident occurring in the future, unless mitigated by by very restrictive speed limits.
Sounds as though trap points would help. It appears that one train was driven correctly into the passing loop, where it should have been held at the signal protecting the exit from the loop onto the main line.
There has been no suggestion of any signalling failure, one may therefore presume that this signal was passed at danger due to poor adhesion.
Trap points, interlocked with the signal protecting the exit from the loop would prevent any repeat. Exit signal showing a proceed aspect=points in the normal position allowing train onto main line.
Exit signal at danger=trap points automatically set to divert the train into a sand drag.

The Cambrian is operated on a unique ETRMS signalling system.  There are no signallers or signalboxes at the remote passing places. Train occupation of the route and speeds are controlled from Machynlleth.   The pointwork at each end of the passing loops is locally controlled.  There are no fixed running signals.   I believe (but stand ready to be corrected) that trains leaving the loop lines run through these trailing points as a matter of routine operation.  I don't see that trap points can be provided.  They are mostly absent now on the wider network at similar types of location.  Locally to me, Evesham West Junction and Ascott-under-Wychwood spring to mind as having no traps, although the junction points at these locations are operated from signalboxes.  The protection is provided by having an overlap ahead of the signal which gives access to the single line, in theory giving a safety margin before the fouling point of the junction is reached.
Logged
grahame
Administrator
Hero Member
*****
Posts: 44240



View Profile WWW Email
« Reply #36 on: October 28, 2024, 11:57:57 »

It seems to me that there is a small but real risk of a similar accident occurring in the future, unless mitigated by by very restrictive speed limits.
Sounds as though trap points would help. It appears that one train was driven correctly into the passing loop, where it should have been held at the signal protecting the exit from the loop onto the main line.
There has been no suggestion of any signalling failure, one may therefore presume that this signal was passed at danger due to poor adhesion.
Trap points, interlocked with the signal protecting the exit from the loop would prevent any repeat. Exit signal showing a proceed aspect=points in the normal position allowing train onto main line.
Exit signal at danger=trap points automatically set to divert the train into a sand drag.

I would have had some similar questions, but await reports rather than speculating too much.  I don't think that there ARE (real) signals there any more - the whole thing being under ERTMS (European Rail Traffic Management System. A future railway signalling system, with equipment located in the driver's cab, rather than lineside).  And, yes, it would appear that there are not real trap points either, or if there are they didn't trap when that might have been expected. Interesting from the reports that the train from Aberystwyth seems to have been stationary at the time of collision.

Edit to add - Witham Bobby posted while I was writing the above .. which I have chosen to leave even though it broadly duplicates what he says
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
Witham Bobby
Transport Scholar
Hero Member
******
Posts: 768



View Profile
« Reply #37 on: October 28, 2024, 12:03:09 »

I would have had some similar questions, but await reports rather than speculating too much.  I don't think that there ARE (real) signals there any more - the whole thing being under ERTMS (European Rail Traffic Management System. A future railway signalling system, with equipment located in the driver's cab, rather than lineside).  And, yes, it would appear that there are not real trap points either, or if there are they didn't trap when that might have been expected. Interesting from the reports that the train from Aberystwyth seems to have been stationary at the time of collision.

With the ERTMS radio link, the driver of the train from Shrewsbury will have been able to warn the Machynlleth signaller, who could have instructed the driver of the train heading towards the Tallerdig loop to stop.  That is speculation, but reasonable

Short sketchy outline of the system here: https://ertms.freightliner.co.uk/news/a-trip-on-the-cambrian/
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5699



View Profile
« Reply #38 on: October 28, 2024, 16:43:15 »



I would have had some similar questions, but await reports rather than speculating too much.  I don't think that there ARE (real) signals there any more - the whole thing being under ERTMS (European Rail Traffic Management System. A future railway signalling system, with equipment located in the driver's cab, rather than lineside).  And, yes, it would appear that there are not real trap points either, or if there are they didn't trap when that might have been expected. Interesting from the reports that the train from Aberystwyth seems to have been stationary at the time of collision.

Edit to add - Witham Bobby posted while I was writing the above .. which I have chosen to leave even though it broadly duplicates what he says

Surely the remote control, rather than a local signal box, does not prevent the use of trap points.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
ChrisB
Transport Scholar
Hero Member
******
Posts: 13408


View Profile Email
« Reply #39 on: October 28, 2024, 17:41:07 »

And the eastbound train then collides with the likely derailed westbound service? Which would cause most damage/injury?
Logged
AMLAG
Sr. Member
****
Posts: 263


View Profile
« Reply #40 on: October 28, 2024, 18:31:33 »


I am reassured when on the Cornish main line that where the double line goes to single
line at Largin East with a 1 in 57 falling gradient towards Bodmin Road, there has historically, for
obvious good reasons, been a trap point and long sand drag.
Logged
grahame
Administrator
Hero Member
*****
Posts: 44240



View Profile WWW Email
« Reply #41 on: October 29, 2024, 13:51:10 »


I am reassured when on the Cornish main line that where the double line goes to single
line at Largin East with a 1 in 57 falling gradient towards Bodmin Road, there has historically, for
obvious good reasons, been a trap point and long sand drag.


Trap points (and sand drags) were very much more "necessary" in the days before all trains had brakes throughout but they remain of significant use in many situations today.  I seem to remember a turbo on its way into Paddington from the sidings not all that long ago that overshot a signal and ran off the line.   It did (and these things do) still do damage, but that damage was lessened.

Fewer trains run away or overrun these days, and they probably don't get as far when they do.  So I'm not shocked at the reduction in the number of trap points.  However, Salisbury has shown up (and Talerddig probably has) that overruns are not eliminated and that on the occasions that trains run through there can be significant damage done if they overrun so far that they come into contact with another train.  It will be very interesting to see what the RAIB (Rail Accident Investigation Branch) have to say, if anything, about trap points, drags, safety zones, etc.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
ChrisB
Transport Scholar
Hero Member
******
Posts: 13408


View Profile Email
« Reply #42 on: October 29, 2024, 17:06:37 »

Salisbury wouldn't have benefitted from trap points as the train joining the through route was signalled in front of the 'straight on' train - that did the sliding into the train from the left. So the only place a trap would take that 'straight on' train would be into the tunnel arch, if indeed you could even get a trap point there
Logged
grahame
Administrator
Hero Member
*****
Posts: 44240



View Profile WWW Email
« Reply #43 on: November 05, 2024, 13:18:08 »

From the BBC» (British Broadcasting Corporation - home page) https://www.bbc.co.uk/news/articles/cde7dwkpz5xo

Quote
Both trains involved in a fatal crash in mid Wales were moving at the time of the collision, investigators have revealed.

David Tudor Evans, 66, died after two trains crashed near the village of Llanbrynmair in Powys on 21 October.

It was initially said that a service from Shrewsbury to Aberystwyth hit a stationary train which was travelling from Machynlleth to Shrewsbury.

Now, the Rail Accidents and Investigations Branch (RAIB (Rail Accident Investigation Branch)) has said both trains were moving at the time of impact and there was conflicting evidence about how fast they were going.

Quote
On Tuesday, the RAIB issued an update on the investigation, adding that an automated system that helps train wheels grip tracks failed.

It said initial analysis indicated the 1J25 service from Shrewsbury to Aberystwyth was travelling between 15mph (24 km/h) and 24mph (39 km/h).

The 1S71service from Machynlleth to Shrewsbury was travelling at about 6mph (10 km/h) in the opposite direction.

Quote
The RAIB said it inspected the automatic sanding system, which automatically sprays sand via hoses when a wheel slide is detected during braking, in a bid to generate more friction.

It said the inspection of the system fitted to train 1J25 showed these hoses on the leading vehicle of the train "were blocked and apparently unable to discharge sand".
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
stuving
Transport Scholar
Hero Member
******
Posts: 7449


View Profile
« Reply #44 on: April 30, 2025, 21:59:29 »

RAIB (Rail Accident Investigation Branch) have published an interim report on this accident. It provides a lot more detail than the initial press statement, but is mostly about the same topics. As an interim report, there is no attempt to draw conclusions.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 [3]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page