Worcester_Passenger
|
 |
« Reply #180 on: June 02, 2025, 14:31:01 » |
|
And the halts train will be cancelled this afternoon: 17:04 Didcot Parkway to Evesham due 18:23 will be cancelled. This is due to more trains than usual needing repairs at the same time. Last Updated:02/06/2025 14:06
18:51 Evesham to Oxford due 19:50 will be cancelled. This is due to more trains than usual needing repairs at the same time. Last Updated:02/06/2025 14:06 Later: 20:52 London Paddington to Great Malvern due 23:13 will be terminated at Oxford. This is due to the train manager being taken ill. Last Updated:02/06/2025 18:06 But... 22:58 Worcester Shrub Hill to Great Malvern due 23:12 An additional train service has been planned to operate as shown 22:58 Worcester Shrub Hill to Great Malvern due 23:12. Last Updated:02/06/2025 18:13
|
|
« Last Edit: June 02, 2025, 22:13:21 by Worcester_Passenger »
|
Logged
|
|
|
|
Worcester_Passenger
|
 |
« Reply #181 on: June 03, 2025, 08:16:56 » |
|
Tuesday June 3 A points failure at Cheltenham Spa has meant that train 1G01 0632 Swindon to Shrub Hill was terminated at Gloucester. This train forms 1P20 08:18 Shrub Hill to London Paddington. But: 08:18 Worcester Shrub Hill to London Paddington due 10:25 will be started from Oxford. This is due to a points failure. Will be formed of 5 coaches. Last Updated:03/06/2025 07:50
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
 |
« Reply #182 on: June 09, 2025, 12:12:54 » |
|
Monday June 9 And after a few good days: 09:56 Great Malvern to London Paddington due 12:22 will be terminated at Oxford. This is due to the emergency services dealing with an incident. Last Updated:09/06/2025 11:24
10:53 London Paddington to Worcester Shrub Hill due 13:01 is being delayed at Southall. This is due to trespassers on the railway. Last Updated:09/06/2025 11:07
11:52 London Paddington to Hereford due 14:44 will be started from Reading. This is due to the emergency services dealing with an incident. Last Updated:09/06/2025 11:39 RTT» has the 11:52 as starting from Shrub Hill. Later (17:00) : The 11:52 was indeed started from Reading (+27). It was held at Wolvercote (+37) and Evesham (+59). It arrived Shrub Hill +59 and was cancelled therafter. 15:18 Hereford to London Paddington due 18:29 will be started from Worcester Shrub Hill. This is due to the emergency services dealing with an incident earlier today. Last Updated:09/06/2025 13:34
|
|
« Last Edit: June 09, 2025, 17:07:02 by Worcester_Passenger »
|
Logged
|
|
|
|
Witham Bobby
|
 |
« Reply #183 on: June 10, 2025, 10:16:41 » |
|
08:52 London Paddington to Great Malvern due 11:14 will be cancelled. This is due to more trains than usual needing repairs at the same time. Last Updated:10/06/2025 06:44 11:58 Great Malvern to London Paddington due 14:23 will be cancelled. This is due to more trains than usual needing repairs at the same time. Last Updated:10/06/2025 06:45
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
 |
« Reply #184 on: June 10, 2025, 17:41:40 » |
|
15:23 London Paddington to Worcester Foregate Street due 17:47 will be terminated at Worcester Shrub Hill. It has been delayed between Reading and Kingham and is now 20 minutes late. This is due to a fault on this train. Last Updated:10/06/2025 17:19
18:02 Worcester Foregate Street to London Paddington due 20:29 will be started from Worcester Shrub Hill. This is due to a fault on this train. Last Updated:10/06/2025 17:19
|
|
|
Logged
|
|
|
|
Witham Bobby
|
 |
« Reply #185 on: June 13, 2025, 09:37:32 » |
|
1W11 0553 London Paddington to Great Malvern was cancelled between Oxford and Great Malvern due to an issue with the train crew (TG). ( RTT» ) 08:56 Great Malvern to London Paddington due 11:27 will be started from Oxford. It will no longer call at Great Malvern, Malvern Link, Worcester Foregate Street, Worcester Shrub Hill, Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury and Hanborough. This is due to more trains than usual needing repairs at the same time. Last Updated:13/06/2025 07:22 ( GW» Journeycheck) Striking disparity between the excuses
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
 |
« Reply #186 on: June 13, 2025, 10:24:57 » |
|
Yesterday (Thursday June 12), the afternoon halts train from Didcot to Evesham was cancelled after Oxford.
JourneyCheck had this as being due to "to more trains than usual needing repairs at the same time".
RTT» has it as "This service was cancelled between Oxford and Evesham due to the planned train being replaced with a slower train (MS)".
|
|
|
Logged
|
|
|
|
ChrisB
|
 |
« Reply #187 on: June 13, 2025, 12:45:18 » |
|
Strewth - is there anything slower train than a 75mph 165 turbo?!!
|
|
|
Logged
|
|
|
|
grahame
|
 |
« Reply #188 on: June 13, 2025, 14:54:06 » |
|
Strewth - is there anything slower train than a 75mph 165 turbo?!!
Class 139?
|
|
|
Logged
|
Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
|
|
|
charles_uk
|
 |
« Reply #189 on: June 13, 2025, 15:10:32 » |
|
The afternoon halts train isn't even getting as far as Oxford today: 17:04 Didcot Parkway to Evesham due 18:23 will be cancelled. This is due to a shortage of train crew.
18:51 Evesham to Oxford due 19:50 will be cancelled. This is due to a shortage of train crew. and yesterday, despite telling passengers the halts service would not go beyond Oxford, JourneyCheck didn't report any issues with the return run from Evesham!
|
|
|
Logged
|
|
|
|
Witham Bobby
|
 |
« Reply #190 on: June 13, 2025, 15:10:53 » |
|
Strewth - is there anything slower train than a 75mph 165 turbo?!!
Maybe a turbo that doesn't even get started? 17:04 Didcot Parkway to Evesham due 18:23 will be cancelled. This is due to a shortage of train crew. Last Updated:13/06/2025 14:32 18:51 Evesham to Oxford due 19:50 will be cancelled. This is due to a shortage of train crew. Last Updated:13/06/2025 14:32 Lovely Friday late afternoon/early evening
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
 |
« Reply #191 on: June 15, 2025, 09:02:14 » |
|
Sunday June 15 15/06/25 07:36 London Paddington to Great Malvern due 10:15 will be started from Reading. This is due to a shortage of train crew. Last Updated:14/06/2025 20:13 RTT» reports this as starting from Paddington. 15/06/25 13:12 Worcester Foregate Street to London Paddington due 15:24 will be cancelled. This is due to a shortage of train crew. Last Updated:14/06/2025 20:18
|
|
|
Logged
|
|
|
|
charles_uk
|
 |
« Reply #192 on: June 17, 2025, 09:09:40 » |
|
08:18 Worcester Shrub Hill to London Paddington due 10:25 will be cancelled. This is due to a fault with the signalling system.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
 |
« Reply #193 on: June 17, 2025, 09:17:04 » |
|
Tuesday June 17 And after a good day yesterday, today there has been a signal failure between Swindon and Gloucester. In a very sensible move 07:25 Worcester Shrub Hill to London Paddington due 09:59 will be diverted between Worcester Shrub Hill and Didcot Parkway. It will no longer call at Ashchurch For Tewkesbury, Cheltenham Spa, Gloucester, Stonehouse, Stroud, Kemble and Swindon. This is due to a fault with the signalling system. Last Updated:17/06/2025 07:28 Meanwhile, the failure affected the 08:18 Shrub Hill - Paddington. The incoming stock, train 1G01 0632 Swindon to Shrub Hill was caught up in this. It arrived Stroud +70 and Cheltenham Spa +87 and was cancelled thereafter. 08:18 Worcester Shrub Hill to London Paddington due 10:25 will be cancelled. This is due to a fault with the signalling system. Last Updated:17/06/2025 07:45
|
|
|
Logged
|
|
|
|
charles_uk
|
 |
« Reply #194 on: June 17, 2025, 12:08:45 » |
|
10:53 London Paddington to Worcester Shrub Hill due 13:01 will be terminated at Oxford. It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl and Worcester Shrub Hill. This is due to train crew being delayed
13:16 Worcester Shrub Hill to London Paddington due 15:22 will be started from Oxford. It will no longer call at Worcester Shrub Hill, Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury and Hanborough. This is due to train crew being delayed.
|
|
|
Logged
|
|
|
|
|