...and the 17:35 Swindon-Westbury left Chippenham on time, but then stopped for about 5 mins somewhere before Thingley, due to a red signal according to the train manager. Wasn't obvious why; I assumed something had got delayed coming from Melksham in the opposite direction on the single track we were waiting to turn into, but nothing came past us. Strange.
Nothing obvious on Real Time Trains ... the other possibility that I looked at was the possibility of something ahead of it that had to clear Bradford Junction before you could proceed, but that was NOT showing on
RTT» .
Signalling experts may be able to help me - but I think that the train is passed from Didcot to Westbury sit passes along the line and signallers at both ends have to co-operate to pass trains. I get the impression that the paths / this is occasionally done very late.
The signaller at Westbury controls the single line through Melksham. In order to route a down train from Thingley Junction towards Bradford Junction, the signaller on the
TVSC» Swindon workstation has to request the slot from their counterpart at Westbury. If the slot is not requested or given in good time, the Automatic Route Setting will set the route up only as far as the signal before the Thingley crossovers. This is to ensure that the junction is not blocked if there was to be a train coming up from Bradford Junction first.