This popped up in Wokingham Today this week, and I was not quite sure what I remembered about it, or why it was news. They did mention the four 180s
GC» have pre-booked for this route if approved; it was also linked in some reports to the decisions promised last week. I think it is still due real soon now, honest, so I did a bit of revision of the details.
It was first submitted in April 2025, and revised in December, and is one of the five further OA applications
ORR» have in their in tray after the three they killed off last week. These are all "section 17" applications, meaning Network Rail (and others) are disputing their acceptability. There's a list of them behind
the link on this page, and the description of GC's proposal is in their "Form P". There are also other documents there now, e.g. trying to persuade
NR» how easy it is to fit these paths in.
The full route they are asking for runs (and calls at): Newcastle, Durham, Darlington, Northallerton, York, Doncaster, Sheffield, Derby, Burton-on-Trent, Birmingham New Street, Warwick Parkway, Banbury, Oxford, Reading, Wokingham, Guildford, Redhill, Gatwick Airport, Haywards Heath and Brighton.
it's not going to be impressively quick, as on some bits - notably the Brighton Line - the only capacity they can claim is spare is on the slow lines. They do still claim a time advantage but that's mainly by running direct from their stations to Gatwick (which is their big draw in terms of attracting enough passengers).
This is their rationale,
from the Form P:
Through this application, GC is seeking to provide more direct rail connectivity to areas which we consider underserved, and provide passengers with an additional option for environmentally friendly transport to London Gatwick Airport from the Midlands and North East of England, when compared to driving, or coach travel.
The new services will bring the benefits of competition, as experienced on the East Coast Mainline (ECML▸ ), to the cross- country route, which between the ECML and South East of England has no competition to the fare setter, other than premium fares via London.
This application will support the continued expansion of GC to the benefit of passengers, in particular introducing direct rail connectivity between the South Coast and the Northeast of England, where GC has a long track record of supporting underserved communities, while also growing overall revenue and patronage on rail services. In addition, this new proposed route will also directly connect England’s second most populous city, Birmingham and surrounding areas to the second busiest airport in the UK▸ , which in 2024 served 43.2 million passengers, and whose stated goal is to serve 80 million passengers annually by the late 2030s with the project to open a second runway currently underway.
GC has already had discussions with London Gatwick, who welcome this application and are excited about the opportunities it creates for more direct connectivity to the airport. It also re- connects Birmingham with the largest British conurbation without a current direct rail service, in Brighton and Hove.
This application is made considering the implementation of the East Coast Mainline (ECML) Event Steering Group (ESG) timetable in December 2025, our timetable also makes updates and considers the May 2026 timetable.
These new direct GC services provide rail journey times between the Southeast and Birmingham/Oxford, which compete favourably with the fastest current rail journey times (e.g. Gatwick Airport – Birmingham GC 3h 00, compared to 2h 40), which involve at least one interchange, usually including a change between London termini. Direct journey times are also comparable with average road journey times (c3h 00 for Gatwick Airport – Birmingham by car, and 4h 00 by coach), without the added uncertainty from the use of the congested M25. This is particularly true of poorly served stations for these routes, such as Guildford (Guildford – Birmingham GC 2h 14, against current rail 2h 30 via Reading, or 2h 45 by car).
On longer journeys from the Southeast to the Northeast, the GC proposed direct journey times also compare favourably with car and coach journey times, although they are slower than the premium- priced services requiring a cross-London interchange. For example, beyond Derby, coach services to Gatwick Airport require an interchange, which means the current cost-effective solution takes, for example, from York 8 hours by coach and 5 hours by car, compared to the direct proposed 5 hours by GC.
Of course it will still most likely be refused.