The platforms at Bath Spa can get very busy indeed and the numbers of people coming in and out of the city "can only grow".
A question from my mailbox asks how the congestion we already see might be eased. I have a whole load of way out ideas
Ten preposterous ideas ...
1. Extend Bristol bound platform over bridge
2. Access ramps rise over river from south bank
3. Three track section to the west becomes main lines on outside with turnback track in centre.
4. Access lifts / escalator in Prezzo Restaurant
5. Re-instate bay plaform at London end / side
6. Make better use of level access already there to car park at London end on London arrival side
7. Make all local trains 5 carriages long and stop them at the end of the platfom where people come on new local entries
8. Could there be a travellator up from the booking hall to the front of the London platform (old bay space)?
9. Could trains run on time to reduce passenger dwell time on platform?
10. Escalator / lifts in bus station to overhead walkway to platform (and across Dorchester Street?)