Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 03:15 18 Jul 2026
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 today - Melksham Carnival
29/07/26 - TransWilts AGM
01/08/26 - Avoncliff to Weymouth day out
12/08/26 - Solar eclipse

On this day
18th Jul (1876)
Longest Swing Bridge opens (*)

Train RunningCancelled
05:24 Westbury to Salisbury
06:36 Truro to Falmouth Docks
07:45 Truro to Falmouth Docks
08:07 Plymouth to Penzance
08:45 Truro to Falmouth Docks
09:45 Truro to Falmouth Docks
10:39 Penzance to Exeter St Davids
10:45 Truro to Falmouth Docks
11:45 Truro to Falmouth Docks
12:45 Truro to Falmouth Docks
13:45 Truro to Falmouth Docks
14:22 Exeter St Davids to Plymouth
14:45 Truro to Falmouth Docks
15:45 Truro to Falmouth Docks
16:45 Truro to Falmouth Docks
17:48 Truro to Falmouth Docks
19:08 Gloucester to Bristol Temple Meads
19:12 Truro to Falmouth Docks
19:33 Par to Newquay
19:42 Truro to Falmouth Docks
20:38 Newquay to Par
21:35 Reading to Gatwick Airport
23:23 Gatwick Airport to Reading
Short Run
06:05 Salisbury to Bristol Temple Meads
15:30 Weymouth to Gloucester
16:03 London Paddington to Plymouth
17:16 Newquay to Bristol Temple Meads
18:55 Exeter St Davids to Oxford
19:56 Taunton to London Paddington
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
July 18, 2026, 03:28:28 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[206] Stonehenge - Love it or hate it?
[116] Investigation into parking tickets for drivers queuing at petr...
[100] Local government reorganisation across Oxfordshire
[33] King Charles III - becoming a proficient barman
[30] Help shape the future of GWR travel
[13] Bridge hit - again "Freshford" = Limpley Stoke?
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1] 2
  Print  
Author Topic: Overhead Line Equipment - ongoing discussion  (Read 7245 times)
BahnCard100
Jr. Member
**
Posts: 13


View Profile
« on: November 03, 2025, 16:28:13 »

I note Mark A's reference to Thingley Junction and the associated OLE (Overhead Line Equipment, more often "OHLE") terms mentioned. I can recommend Garry Keenor's self published "Overhead Line Electrification for Railways" available both as a pdf and a hard back book. Garry is a Chartered Engineer, have a gander at www.ocs4rail.com. Perhaps I ought to add I have no connection to Gary, just a strictly amateur interest.
Logged
Chris from Nailsea
Administrator
Hero Member
*****
Posts: 22167



View Profile Email
« Reply #1 on: November 03, 2025, 17:55:57 »

Thank you for your post, BahnCard100 - and for quoting your source and disclaimer of any commercial interest.

On the Coffee Shop forum, we are delighted to see members posting such links to relevant reference material.

CfN (Chris from Nailsea, an administrator on this forum). Smiley

Logged

William Huskisson MP (Member of Parliament, or Mile Post (a method of measuring the railway in miles and chains from a starting point - usually London), depending on context) was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: Stop, Look, Listen.

"Level crossings are safe, unless they are used in an unsafe manner."  Discuss.
chuffed
Transport Scholar
Hero Member
******
Posts: 1627


View Profile
« Reply #2 on: November 03, 2025, 22:59:47 »

Bit of a thread drift here, mods !
Logged
grahame
Administrator
Hero Member
*****
Posts: 47264



View Profile WWW Email
« Reply #3 on: November 04, 2025, 03:36:17 »

Bit of a thread drift here, mods !

Noted - probably worth a split for the visibility benefit of both topics.
Logged

Coffee Shop Admin, Chair of Melksham Transport User Group, West Wiltshire Rail User Group Committee and TravelWatch SouthWest Board Member
BahnCard100
Jr. Member
**
Posts: 13


View Profile
« Reply #4 on: December 22, 2025, 12:40:17 »

As an occasional poster in this forum I would like to continue with my last mention of Garry Keenor, a chartered engineer and author of Overhead Line Electrification for Railways.
Once again I should stress that I do not know Garry personally and I have only an amateur interest in the subject. My thanks to Chris from Nailsea for his kind reply.
To continue I found a YouTube video from a recent (December 2025) Wales & West meeting of the Permanent Way Institution which Garry addressed as professional lead for electrification.
His talk was entitled (I don't) Mind the Gap, in which Garry continues to simplify the use of electrification for traction generally both in overhead supply and in battery stored form. In other words he is explaining what intermittent electrification of railways would mean. I hope others find it as interesting as I did.
My apologies if I have posted in the wrong place.
Logged
Chris from Nailsea
Administrator
Hero Member
*****
Posts: 22167



View Profile Email
« Reply #5 on: December 22, 2025, 13:30:24 »

As an occasional poster in this forum ... My thanks to Chris from Nailsea for his kind reply ... My apologies if I have posted in the wrong place.

A minor confusion, which I have resolved, BahnCard100.

Thank you for continuing to post such interesting and useful information - no matter how 'occasional'.  Smiley
Logged

William Huskisson MP (Member of Parliament, or Mile Post (a method of measuring the railway in miles and chains from a starting point - usually London), depending on context) was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: Stop, Look, Listen.

"Level crossings are safe, unless they are used in an unsafe manner."  Discuss.
Electric train
Transport Scholar
Hero Member
******
Posts: 4679


I am a retired railway Electrification Engineer


View Profile
« Reply #6 on: December 23, 2025, 07:30:55 »

I note Mark A's reference to Thingley Junction and the associated OLE (Overhead Line Equipment, more often "OHLE") terms mentioned. I can recommend Garry Keenor's self published "Overhead Line Electrification for Railways" available both as a pdf and a hard back book. Garry is a Chartered Engineer, have a gander at www.ocs4rail.com. Perhaps I ought to add I have no connection to Gary, just a strictly amateur interest.

My quick glance through the Garry Keenor pfd it is very comprehensive, anyone reading it cover to cover will have a very good understanding of OLE railway electrification.   Grin  Although I will add the techniques, equipment and systems are evolving all the time
Logged

"The real source of danger, and the only one which there is any hope of removing, is in a complication of imperfections in a great number of the mechanical parts of the system"
Isambard Kingdom Brunel
infoman
Transport Scholar
Hero Member
******
Posts: 1673


View Profile
« Reply #7 on: May 23, 2026, 05:20:31 »

Not sure if there are any plans for overhead Electrification in the West region.

Maybe
Stapleton road bank
Chippenham to Bristol
Cardiff to Swansea(possible on to LLanelli and Carmarthen

Although over head wires never look pleasant,especially in pretty view areas

Three places in this neck of the woods I would never like to see overhead wires is St Ives Newquay and Falmouth
with the Severn Beach line and Portishead lines.
Just wondering if the scheme on the Greenford branch could be introduced with underneath charging points at the the terminating station on the five routes mentioned.       
Logged
grahame
Administrator
Hero Member
*****
Posts: 47264



View Profile WWW Email
« Reply #8 on: May 23, 2026, 07:09:22 »

As I read it, it's all on "stop" at the moment - no money and no concrete plans to resume.  Personal view - it is seen as   more important to get people from Acton to Solihull as quickly as possible in 10 years time than it is to complete jobs which in some cases were already started.  But yet with advancing technology, that just might make sense.

Works started and - would you describe them as abandoned? - at Thingley Junction.



Personal view - from my armchair - would be the Didcot to Oxford and Cocklebury Lane and Parkway to Temple Meads would be the next sensible steps.  So many services would then be able to go pure electric; does not cut the need for power (moves it away from the train) but at least it can be sustainable and not fossil, trains last longer, have better performances curves, and can still electrically do London - Cardiff even when Badminton is closed for engineering or flooding.

Also makes sense for freight to get electric to Westbury and the quarries - via Pewsey and via Melksham - nd that brings in more electric passenger trains too. 
Logged

Coffee Shop Admin, Chair of Melksham Transport User Group, West Wiltshire Rail User Group Committee and TravelWatch SouthWest Board Member
John D
Hero Member
*****
Posts: 365


View Profile
« Reply #9 on: May 23, 2026, 08:11:05 »

It's coming up to 9 years since Grayling killed parts of Great Western electrification (it was July 2017)

As photographed above there are a number of masts west of Chippenham doing nothing.  I think about third of the mast bases and a few masts were also installed Didcot - Oxford.

Things have moved on with cost control, and the stupidity of not resuming it once costs were controlled has never really made sense as a long term strategy (and even less so in new era of high diesel prices).

Ironically the delay to ordering replacements for 158,159,165,166,168 diesel fleet might benefit a few electrified sections, if it means battery charging is possible, and don't have to fit diesel engines (which require servicing and maintenance of the engines).    There is obviously a cost implication of adding diesel generators to replacement fleet (plus ongoing extra operational costs), which could be used to pay for some of the electrification instead.

But doing joined up thinking, or any form of mid or longer term planning seems to be beyond current batch of ministers, who seem to be more into short term thinking and regular U turns
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 9481



View Profile
« Reply #10 on: May 23, 2026, 08:13:18 »

It's coming up to 9 years since Grayling killed parts of Great Western electrification (it was July 2017)

As photographed above there are a number of masts west of Chippenham doing nothing.  I think about third of the mast bases and a few masts were also installed Didcot - Oxford.

Things have moved on with cost control, and the stupidity of not resuming it once costs were controlled has never really made sense as a long term strategy (and even less so in new era of high diesel prices).

Ironically the delay to ordering replacements for 158,159,165,166,168 diesel fleet might benefit a few electrified sections, if it means battery charging is possible, and don't have to fit diesel engines (which require servicing and maintenance of the engines).    There is obviously a cost implication of adding diesel generators to replacement fleet (plus ongoing extra operational costs), which could be used to pay for some of the electrification instead.

But doing joined up thinking, or any form of mid or longer term planning seems to be beyond current batch of ministers, who seem to be more into short term thinking and regular U turns

Why was it stopped? Was it way behind schedule and/or over budget?
Logged
John D
Hero Member
*****
Posts: 365


View Profile
« Reply #11 on: May 23, 2026, 08:24:35 »

It's coming up to 9 years since Grayling killed parts of Great Western electrification (it was July 2017)

As photographed above there are a number of masts west of Chippenham doing nothing.  I think about third of the mast bases and a few masts were also installed Didcot - Oxford.

Things have moved on with cost control, and the stupidity of not resuming it once costs were controlled has never really made sense as a long term strategy (and even less so in new era of high diesel prices).

Ironically the delay to ordering replacements for 158,159,165,166,168 diesel fleet might benefit a few electrified sections, if it means battery charging is possible, and don't have to fit diesel engines (which require servicing and maintenance of the engines).    There is obviously a cost implication of adding diesel generators to replacement fleet (plus ongoing extra operational costs), which could be used to pay for some of the electrification instead.

But doing joined up thinking, or any form of mid or longer term planning seems to be beyond current batch of ministers, who seem to be more into short term thinking and regular U turns

Why was it stopped? Was it way behind schedule and/or over budget?

Was going seriously over budget, (and behind schedule) and instead of saying pause and refocus, just took axe to it.    Ignored the ongoing alternative costs it created.

It was a time when skills were being outsourced to consultants, so something like a drain cover where a mast was planned, meant leaving it, getting consultants out again, redesigning, expensively coming back later with electrification train.  Rather than having skilled and empowered staff doing simple tweak to plan there and then.   

The structure at the time was not incentivised to get it finished as efficiently as possible, but was more like see what extra work and revenue can get from it.  HS2 (The next High Speed line(s)) contracts were devised in same cost plus era too.
Logged
Chris from Nailsea
Administrator
Hero Member
*****
Posts: 22167



View Profile Email
« Reply #12 on: May 23, 2026, 17:14:56 »

I have merged a couple of topics here, in the interests of continuity, clarity and ease of future reference.

CfN (Chris from Nailsea, an administrator on this forum)Smiley
Logged

William Huskisson MP (Member of Parliament, or Mile Post (a method of measuring the railway in miles and chains from a starting point - usually London), depending on context) was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: Stop, Look, Listen.

"Level crossings are safe, unless they are used in an unsafe manner."  Discuss.
Electric train
Transport Scholar
Hero Member
******
Posts: 4679


I am a retired railway Electrification Engineer


View Profile
« Reply #13 on: May 23, 2026, 18:42:44 »

It's coming up to 9 years since Grayling killed parts of Great Western electrification (it was July 2017)

As photographed above there are a number of masts west of Chippenham doing nothing.  I think about third of the mast bases and a few masts were also installed Didcot - Oxford.

Things have moved on with cost control, and the stupidity of not resuming it once costs were controlled has never really made sense as a long term strategy (and even less so in new era of high diesel prices).

Ironically the delay to ordering replacements for 158,159,165,166,168 diesel fleet might benefit a few electrified sections, if it means battery charging is possible, and don't have to fit diesel engines (which require servicing and maintenance of the engines).    There is obviously a cost implication of adding diesel generators to replacement fleet (plus ongoing extra operational costs), which could be used to pay for some of the electrification instead.

But doing joined up thinking, or any form of mid or longer term planning seems to be beyond current batch of ministers, who seem to be more into short term thinking and regular U turns

Why was it stopped? Was it way behind schedule and/or over budget?

Was going seriously over budget, (and behind schedule) and instead of saying pause and refocus, just took axe to it.    Ignored the ongoing alternative costs it created.

It was a time when skills were being outsourced to consultants, so something like a drain cover where a mast was planned, meant leaving it, getting consultants out again, redesigning, expensively coming back later with electrification train.  Rather than having skilled and empowered staff doing simple tweak to plan there and then.   

The structure at the time was not incentivised to get it finished as efficiently as possible, but was more like see what extra work and revenue can get from it.  HS2 (The next High Speed line(s)) contracts were devised in same cost plus era too.

Agreed the GW» (Great Western - used as an abbreviation for the area / lines under the Great Western franchise, as opposed to FGW which includes "First", the company operating them too. For tickets - about) electrification went over budget, however the DfT» (Department for Transport - about) got the electrification the specified but then complained it was too expensive and taking too long.  Also they dithered over the Oxford station rebuild and failed to take on the NIMBY in Bath and Chippenham area may be there were a few MP (Member of Parliament, or Mile Post (a method of measuring the railway in miles and chains from a starting point - usually London), depending on context)'s worried about their seats
Logged

"The real source of danger, and the only one which there is any hope of removing, is in a complication of imperfections in a great number of the mechanical parts of the system"
Isambard Kingdom Brunel
Noggin
Hero Member
*****
Posts: 677


View Profile
« Reply #14 on: May 27, 2026, 23:19:31 »

Not sure if there are any plans for overhead Electrification in the West region.

Maybe
Stapleton road bank
Chippenham to Bristol
Cardiff to Swansea(possible on to LLanelli and Carmarthen

Although over head wires never look pleasant,especially in pretty view areas

Three places in this neck of the woods I would never like to see overhead wires is St Ives Newquay and Falmouth
with the Severn Beach line and Portishead lines.
Just wondering if the scheme on the Greenford branch could be introduced with underneath charging points at the the terminating station on the five routes mentioned.       

In short, I suspect the only new wiring you'll see on GWR (Great Western Railway) routes this decade is:
a) Any South Wales main line reliefs which weren't done originally, as part of the upgrade to 100mph running as part of the union connectivity works
b) Cardiff to Swansea - if the Welsh Assembly pay for it
c) Filton Jcn/Brabazon to Bristol Temple Meads - if WECA» (West of England Mayoral Combined Authority - about)/Welsh Assembly/ YTL (Bristol Arena developers) fund it

I can't see anything happening at Oxford until the station rebuild is complete - in any case, the only real advantage would be that 387's could free up 80x.

Anything else really depends on having hybrid stock which can make use of it for charging. No chance the DfT» (Department for Transport - about) will let GWR do that and even if GBR (Great British Railways) announce the start of procurement as they take over at the end of the year, there's little to no chance they'd be in service this decade. 

Mark Hopwood suggested that Filton to Bathampton electrification would enable battery-electric units to be able to do the Portsmouths and Weymouths, but there's little incentive to do it otherwise - the 80x are fine on diesel.

On that basis I can't see any branchline electrification this decade or next unless someone in GBR reckons it would save money reasonably quickly. .
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1] 2
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page