|
Richard Fairhurst
|
 |
« Reply #120 on: September 09, 2026, 09:46:18 » |
|
The Oxfordshire Halts stopper and the following IET▸ both made it through around an hour late.
A service disruption notice briefly appeared on the GWR▸ website saying tickets would be accepted on the Stagecoach S3 from Charlbury, picking up from the Bell Hotel. In the comedy of errors that is British public transport, Church Street (where the Bell is) is closed for utility works, and nobody appears to have told Stagecoach let alone GWR - Mrs F ended up flagging down the bus on the outskirts of town before it took an impromptu diversion.
|
|
|
|
|
Logged
|
|
|
|
|
charles_uk
|
 |
« Reply #121 on: September 09, 2026, 16:03:39 » |
|
Further update on today's problems which are still continuing: Cancellations to services between Oxford and Hereford via Worcester Shrub Hill
Due to vandalism of railway equipment at Evesham trains have to run at reduced speed. Disruption is expected until the end of the day.
Train services between Oxford and Hereford via Worcester Shrub Hill and Great Malvern may be cancelled, delayed or revised.
Customer Advice - What has happened? - Network Rail advises that the signalling in the Evesham area has been affected due to vandalism. - What are we doing about it? - We are working with Network Rail to be able to return to running our normal timetable as soon as possible.
- What are your options? - We are sorry for the disruption to your journey today, these are the current options available to you: - Option 1: If there are other rail companies or local public transport operators who may be able to help you make your journey, we will provide details here. - Option 2: Replacement transport provided by us such as a buses, coaches or taxis, have not been requested at this time. We will continue to monitor the need for this as the situation develops and provide updates here. - Option 3: If your train is cancelled, you may travel on either of the two services before, or two services after, your original train. If these are peak services or less flexible, you can still travel with your original ticket, at no extra cost. - Option 4: Consider postponing your journey until our service returns to normal.
|
|
|
|
|
Logged
|
|
|
|
|
charles_uk
|
 |
« Reply #122 on: September 10, 2026, 10:01:41 » |
|
Another morning of disruption: Cancellations to services between Oxford and Worcester Shrub Hill
Due to a shortage of train crew between Oxford and Worcester Shrub Hill fewer trains are able to run on all lines.
Train services running through these stations may be cancelled or delayed. Disruption is expected until 11:00 10/09.
Customer Advice - What has happened? - Due to a fatality earlier this morning in they Hayes and Harlington area, trains and crew are misplaced in the area resulting in: 1W11 0553 London Paddington to Great Malvern cancelled due to a person hit by a train (XC▸ )
1W13 0652 London Paddington to Great Malvern cancelled between Reading and Great Malvern due to a person hit by a train (XC)
08:56 Great Malvern to London Paddington due 11:27 will be cancelled. This is due to the emergency services dealing with an incident.
09:56 Great Malvern to London Paddington due 12:23 will be cancelled. This is due to the emergency services dealing with an incident. In addition, the 0713 Great Malvern to London Paddington lost 46 minutes between Evesham and Honeybourne, departing Oxford 50 minutes late.
|
|
|
|
|
Logged
|
|
|
|
|
charles_uk
|
 |
« Reply #123 on: September 10, 2026, 15:09:42 » |
|
Some more including a "regular" pair: 15:18 Worcester Foregate Street to London Paddington due 17:25 has been cancelled. This is due to a shortage of train crew.
15:52 London Paddington to Great Malvern due 18:26 will be terminated at Worcester Shrub Hill. It will no longer call at Worcester Foregate Street, Malvern Link and Great Malvern. This is due to a shortage of train crew.
17:04 Didcot Parkway to Evesham due 18:23 will be cancelled. This is due to a shortage of train crew.
18:51 Evesham to Oxford due 19:50 will be cancelled. This is due to a shortage of train crew.
19:02 Great Malvern to London Paddington due 21:28 will be cancelled. This is due to a shortage of train crew.
22:51 London Paddington to Worcestershire Parkway Hl due 01:06 will be cancelled. This is due to a shortage of train crew. (edited to add the 15:08 WOF: PAD▸ )
|
|
|
|
« Last Edit: September 10, 2026, 16:18:45 by charles_uk »
|
Logged
|
|
|
|
|
charles_uk
|
 |
« Reply #124 on: September 11, 2026, 09:24:52 » |
|
A couple so far today: 08:51 London Paddington to Great Malvern due 11:14 will be terminated at Reading. It will no longer call at Oxford, Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl, Worcester Shrub Hill, Worcester Foregate Street, Malvern Link and Great Malvern. This is due to a fault on this train.
11:58 Great Malvern to London Paddington due 14:23 will be cancelled. This is due to a fault on this train.
|
|
|
|
|
Logged
|
|
|
|
|
Richard Fairhurst
|
 |
« Reply #125 on: September 14, 2026, 10:21:53 » |
|
Signalling cable theft (according to the on-train announcements) between Evesham and Worcester messed everything up yesterday - the 1428 from Hereford sat at Norton Junction for 50 minutes, was changed to be non-stop from Oxford to Paddington, and arrived 93 minutes late. Several other hour-plus delays and cancellations.
Today isn't looking much better!
|
|
|
|
|
Logged
|
|
|
|
|
charles_uk
|
 |
« Reply #126 on: September 17, 2026, 17:30:26 » |
|
The usual pair: 17:04 Didcot Parkway to Evesham due 18:23 will be cancelled. This is due to more trains than usual needing repairs at the same time.
18:51 Evesham to Oxford due 19:50 will be cancelled. This is due to more trains than usual needing repairs at the same time.
|
|
|
|
|
Logged
|
|
|
|
|
Witham Bobby
|
 |
« Reply #127 on: September 17, 2026, 17:31:37 » |
|
The usual pair: 17:04 Didcot Parkway to Evesham due 18:23 will be cancelled. This is due to more trains than usual needing repairs at the same time.
18:51 Evesham to Oxford due 19:50 will be cancelled. This is due to more trains than usual needing repairs at the same time. Not much has changed, then, during my absence over the past several days
|
|
|
|
|
Logged
|
|
|
|
|
charles_uk
|
 |
« Reply #128 on: September 17, 2026, 18:28:41 » |
|
and there's more: 19:02 Great Malvern to London Paddington due 21:28 will be terminated at Worcester Shrub Hill. It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Didcot Parkway, Reading and London Paddington. This is due to a shortage of train crew.
20:52 London Paddington to Great Malvern due 23:13 will be cancelled. This is due to a shortage of train crew.
21:53 London Paddington to Worcester Shrub Hill due 00:01 will be terminated at Oxford. It will no longer call at Hanborough, Charlbury, Shipton, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl and Worcester Shrub Hill. This is due to a shortage of train crew.
|
|
|
|
|
Logged
|
|
|
|
|
charles_uk
|
 |
« Reply #129 on: September 21, 2026, 14:08:00 » |
|
Earlier this morning: 1P10 0523 Hereford to London Paddington cancelled due to the emergency alarm having been called (VH) And a number of short-forms around including the busy 0818 Worcester Shrub Hill to London Paddington and 0952 London Paddington to Hereford services. and edited to add: 1W33 1658 London Paddington to Great Malvern cancelled between Oxford and Great Malvern due to a problem at the depot (MU▸ )
1P42 1945 Great Malvern to London Paddington cancelled between Great Malvern and Oxford due to a problem at the depot (MU)
|
|
|
|
« Last Edit: September 21, 2026, 21:29:46 by charles_uk »
|
Logged
|
|
|
|
|
charles_uk
|
 |
« Reply #130 on: September 22, 2026, 09:43:44 » |
|
I don't always comment on short-forms as the thread would become quite bloated but again today several busy services are short-formed. They're not mentioned on JourneyCheck but Realtime Trains are showing these services as affected: 1P16 0818 Worcester Shrub Hill to London Paddington 1W01 0952 London Paddington to Hereford 1P28 1318 Hereford to London Paddington 1W03 1734 London Paddington to Hereford later edit - Realtime Trains now showing the 1734 as a nine car unit (800321).
|
|
|
|
« Last Edit: September 22, 2026, 17:30:51 by charles_uk »
|
Logged
|
|
|
|
|
charles_uk
|
 |
« Reply #131 on: September 25, 2026, 18:08:21 » |
|
15:52 London Paddington to Great Malvern due 18:26 will be cancelled. This is due to a shortage of train crew.
17:04 Didcot Parkway to Evesham due 18:23 has been cancelled. This is due to the train making extra stops because a train was cancelled.
18:51 Evesham to Oxford due 19:50 will be cancelled. This is due to the train making extra stops because a train was cancelled.
19:02 Great Malvern to London Paddington due 21:28 will be cancelled. This is due to a shortage of train crew.
21:53 London Paddington to Worcester Shrub Hill due 00:01 will be cancelled. This is due to a shortage of train crew. cancelled "due to the train making extra stops because a train was cancelled" 
|
|
|
|
|
Logged
|
|
|
|
|
charles_uk
|
 |
« Reply #132 on: September 29, 2026, 09:16:28 » |
|
07:13 Great Malvern to London Paddington due 09:43 will be cancelled. This is due to more trains than usual needing repairs at the same time.
and the following service: Facilities on the 08:18 Worcester Shrub Hill to London Paddington due 10:26. This is due to more trains than usual needing repairs at the same time. Will be formed of 5 coaches instead of 9. Service full and standing from Kingham. First class is declassified. There are no reservations on this service.
|
|
|
|
|
Logged
|
|
|
|
|
charles_uk
|
 |
« Reply #133 on: September 29, 2026, 16:33:20 » |
|
Nothing on JourneyCheck as at 16:30 but Realtime Trains is flagging a familiar pair: 2E14 1704 Didcot Parkway to Evesham This service was cancelled due to unknown cause (ZW).
2E16 1851 Evesham to Oxford This service was cancelled due to unknown cause (ZW).
|
|
|
|
|
Logged
|
|
|
|
|
charles_uk
|
 |
« Reply #134 on: September 30, 2026, 09:06:01 » |
|
Earlier this morning: 2E80 0700 Worcester Shrub Hill to Didcot Parkway cancelled between Worcester Shrub Hill and Oxford due to an issue with the train crew (TH). and also today: 09:52 London Paddington to Hereford due 12:48 will be cancelled. This is due to a shortage of train crew.
13:18 Hereford to London Paddington due 16:25 will be cancelled. This is due to a shortage of train crew. and (later edit): 21:53 London Paddington to Worcester Shrub Hill due 00:01 will be cancelled. This is due to a shortage of train crew. whether that last cancellation will impact on tomorrow's 06:43 Worcester Shrub Hill to Paddington service remains to be seen.
|
|
|
|
« Last Edit: September 30, 2026, 21:27:43 by charles_uk »
|
Logged
|
|
|
|
|