Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 22:15 16 Nov 2026
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 21/11/26 - Winslow Protest
23/11/26 - Bristol Brabazon opens
25/11/26 - WWRUG, Bath & Wiltshire Metro
13/12/26 - GWR to be re-nationalised

On this day
16th Nov (1951)
Foundation of ancestor organsiation to Railfuture (link)

Train RunningShort Run
19:23 Portsmouth Harbour to Cardiff Central
20:21 Reading to Gatwick Airport
20:56 Paignton to Exmouth
20:59 Gatwick Airport to Reading
21:09 Paignton to Bristol Temple Meads
21:40 Paignton to Exmouth
•
PollsOpen and recent polls
Closed 2026-11-12 Does the bus fare cap jeapodise rail use?
•
Abbreviation pageAcronymns and abbreviations
•
Stn ComparatorStation Comparator
•
Rail newsNews Now - live rail news feed
• • Site Style 1 2 3 4
Next departures • Bristol Temple Meads • Bath Spa • Chippenham • Swindon • Didcot Parkway • Reading • London Paddington • Melksham
Exeter St Davids • Taunton • Westbury • Trowbridge • Bristol Parkway • Cardiff Central • Oxford • Cheltenham Spa • Testing!
November 16, 2026, 22:20:41 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[138] Different outlooks on nationalisation - GWR and Chiltern
[106] Delays on Devon services - merged posts, ongoing discussion
[47] GWR reassures passengers: No radical change after nationalisat...
[38] ORR station usage data
[37] Night Riviera Sleeper train - between Paddington and Penzance ...
[32] Is special safety care needed at special events?
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: SWR improvements under GBR  (Read 9784 times)
John D
Hero Member
*****
Posts: 437


View Profile
« on: December 09, 2025, 05:11:48 »

DfT» (Department for Transport - about) has listed some improvements for nationalised operators under GBR▸ (Great British Railways) as part of its livery launch

Quote
South Western Railway

In public ownership, South Western Railway are:

Modernising and improving their West of England Fleet, with a programme beginning in December 2025 (to be completed during 2028). This will overhaul the 15X fleet serving the West of England, improving performance and reliability of the trains while delivering customer benefits such as interior upgrades and at-seat USB power.

Delivering the new Arterio fleet to transform their suburban network, with over 50% of morning high peak arrivals into Waterloo now on Arterio trains. These provide increased capacity and more comfort for passengers. SWR» (South Western Railway - about) are aiming for most Arterios to be introduced by the end of Summer 2026 (75% of total schedules).

Building a new timetable for the first time in 20 years, by consulting with stakeholders and passengers, with design in early 2026 and a full public consultation in Autumn 2026. The timetable transformation will seek to strike the right balance between enhanced connectivity in their communities, more services and capacity, better train performance on the network and increased economic value for the taxpayer.

Investing over £600 million in improving infrastructure performance to reduce delays and cancellations, complete by March 2027. This includes track and signal renewals, level crossing upgrades, and renewal of associated infrastructure, with projects such as West of England line resilience works, London Waterloo-Clapham Junction upgrades, Island Line improvements, and strengthening the railway at Fareham-Havant and Portsmouth Harbour.

Recruiting more drivers to improve reliability and reduce cancellations, with an increase in the numbers of drivers in active service each year, and increase the number of new drivers in training by 50%.

https://www.gov.uk/government/case-studies/gbr-improvements-train-operators-in-public-ownership-are-making-for-customers

Logged
a-driver
Hero Member
*****
Posts: 1263


View Profile
« Reply #1 on: December 09, 2025, 08:18:14 »

DfT» (Department for Transport - about) has listed some improvements for nationalised operators under GBR▸ (Great British Railways) as part of its livery launch

Quote
South Western Railway

In public ownership, South Western Railway are:

Modernising and improving their West of England Fleet, with a programme beginning in December 2025 (to be completed during 2028). This will overhaul the 15X fleet serving the West of England, improving performance and reliability of the trains while delivering customer benefits such as interior upgrades and at-seat USB power.

Delivering the new Arterio fleet to transform their suburban network, with over 50% of morning high peak arrivals into Waterloo now on Arterio trains. These provide increased capacity and more comfort for passengers. SWR» (South Western Railway - about) are aiming for most Arterios to be introduced by the end of Summer 2026 (75% of total schedules).

Building a new timetable for the first time in 20 years, by consulting with stakeholders and passengers, with design in early 2026 and a full public consultation in Autumn 2026. The timetable transformation will seek to strike the right balance between enhanced connectivity in their communities, more services and capacity, better train performance on the network and increased economic value for the taxpayer.

Investing over £600 million in improving infrastructure performance to reduce delays and cancellations, complete by March 2027. This includes track and signal renewals, level crossing upgrades, and renewal of associated infrastructure, with projects such as West of England line resilience works, London Waterloo-Clapham Junction upgrades, Island Line improvements, and strengthening the railway at Fareham-Havant and Portsmouth Harbour.

Recruiting more drivers to improve reliability and reduce cancellations, with an increase in the numbers of drivers in active service each year, and increase the number of new drivers in training by 50%.

https://www.gov.uk/government/case-studies/gbr-improvements-train-operators-in-public-ownership-are-making-for-customers



That's it!

Modernising the 15x fleet was due anyway, it's a necessity rather then choice.

Building a timetable.  Standard twice yearly stuff

Infrastructure, again that's necessity rather than choice when something becomes life expired.

Delivering the new Arterio fleet, did that not commence prior to nationalisation?

Recruiting more drivers.  No real numbers given so, 1 is an increase! 

It's not setting the bar high for the new GBR.
Logged
Bob_Blakey
Transport Scholar
Hero Member
******
Posts: 1087


View Profile
« Reply #2 on: December 09, 2025, 08:33:15 »

DfT» (Department for Transport - about) has listed some improvements for nationalised operators under GBR▸ (Great British Railways) as part of its livery launch

Quote
South Western Railway
In public ownership, South Western Railway are:
Modernising and improving their West of England Fleet, .....improving performance and reliability of the trains while delivering customer benefits such as interior upgrades and at-seat USB power. .....Building a new timetable for the first time in 20 years.....Investing over £600 million in improving infrastructure performance.....with projects such as West of England line resilience works.....

https://www.gov.uk/government/case-studies/gbr-improvements-train-operators-in-public-ownership-are-making-for-customers

All the current Class 159 trains have been in service since, at the latest, 1993. At a minimum of 32 years old and, surely approaching retirement, would new (multi-modal?) rolling stock not be a better option?

I wonder if one of the customer benefits being delivered would include the possibility of getting a cup of tea, etc. via a reinstated trolley service.  Grin

The current timetable is seemingly the best that can be provided with the existing infrastructure; between Salisbury & Pinhoe even a minor delay can cause the overall service to collapse (recently a Waterloo-bound train was held at PIN for 40 minutes waiting for a late westbound service). Do the 'West of England line resilience works' include any actual infrastructure improvements? As a bare minimum I think the Tisbury loop should be moved to the station and the second platforms at Templecombe & Crewkerne reinstated.
 
Logged
bradshaw
Transport Scholar
Hero Member
******
Posts: 1782



View Profile
« Reply #3 on: December 09, 2025, 09:18:46 »

I would agree about Tisbury and Templecombe. However, when the Cl159s were introduced the up platform at Crewkerne was raised to make access easier. It was also extended outwards to ease the limited width under the road bridge.
The result is that there is no longer a track bed width that would support double track without taking a chunk out of the old down platform. While possible the land behind has been sold off for housing, meaning that the width of the platform would be restricted. The road bridge would also need to be reconstructed to give adequate clearance to a shifted track.
Logged

Richard Sims
John D
Hero Member
*****
Posts: 437


View Profile
« Reply #4 on: February 23, 2026, 19:51:04 »

SWR» (South Western Railway - about) have issued a tender to fit USB C sockets at every seat on their class 158 and 159 trains

Don't know if that is good news or bad news
good that the trains are getting enhanced, bad because wouldn't waste money if replacements were coming in next few years (which implies these 35-37 year old trains will continue beyond 40th birthday)

Quote
1 buyer
South Western Railway
London
Description
South Western Railway Limited (SWRL) is planning to install at seat power for customers within standard and first-class accommodation within its Class 158 and 159 fleet as part of the wider ongoing project to refurbish this fleet.  The purpose of this modification is to make at seat power within first class more accessible along with the addition of USB-C charging and to introduce USB-C charging facilities for the first time to standard class and a minimum of one USB-C outlet for the non-driving side of each cab.  This is a Supply of Goods requirement. The headline requirements are as follows:  A minimum of one USB-C outlet per seat for both standard and first class;  A minimum of one USB-C outlet for the non-driving side of each cab;  The wheelchair bays shall have both USB-C and 230V outlets.  No minimum order quantity for spares.  As a business we have decided to bring the Works element of installation in house but still require the goods to be procured.

CPV Codes
30237132 - Universal Serial Bus (USB) Interfaces

https://bidstats.uk/tenders/2026/W09/865206564
Logged
bradshaw
Transport Scholar
Hero Member
******
Posts: 1782



View Profile
« Reply #5 on: February 24, 2026, 20:47:08 »

A section copied from the new SERUG newsletter explaining why it is difficult to provide a shuttle service eastwards from Exeter when engineering work closes the line west of Yeovil.

Quote
  Emergency engineering work to stabilise an embankment near Axminster took place over the weekend of 17/18 January, with all Exeter-bound services terminating at Crewkerne and bus substitutions onwards to Exeter. We know that the work was essential but have to question the decision not to run shuttle services between Honiton and Exeter. Once again communication from SWR» (South Western Railway - about) was poor – with timetables only available 24 hours in advance and (we think) a very weak excuse given for the inability to run a shuttle between Honiton and Exeter – it was simply not possible to change train crew rosters!
We had a meeting with SWR’s timetable planners on 20 February and now understand more about the difficulties of train service operation west of Yeovil. The lack of crew signing-on facilities at Exeter, together with the difficulty in gaining access to GWR▸ (Great Western Railway)’s fuelling/train servicing there, severely restricts the ability to operate little more than a basic service at present – and when the line is closed further east, support for the Axminster – Exeter section is difficult. GWR have no spare stock (or servicing facilities) to support SWR when the line is closed further east. That needs to change – and makes the plans for Devon Metro (item 6 in our Vision above) even more critical.

Logged

Richard Sims
Clan Line
Hero Member
*****
Posts: 1187



View Profile
« Reply #6 on: February 24, 2026, 21:38:06 »

SWR» (South Western Railway - about) have issued a tender to fit USB C sockets at every seat on their class 158 and 159 trains

Does this increase the legroom ?  Sad
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5978



View Profile
« Reply #7 on: February 25, 2026, 11:35:12 »

SWR» (South Western Railway - about) have issued a tender to fit USB C sockets at every seat on their class 158 and 159 trains

Does this increase the legroom ?  Sad

No of course not. Plans are probably underway to "increase capacity" which is railway code for reducing legroom and tables
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU▸ (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Clan Line
Hero Member
*****
Posts: 1187



View Profile
« Reply #8 on: February 25, 2026, 21:20:07 »

SWR» (South Western Railway - about) have issued a tender to fit USB C sockets at every seat on their class 158 and 159 trains

Does this increase the legroom ?  Sad

No of course not. Plans are probably underway to "increase capacity" which is railway code for reducing legroom and tables

You forgot the GWR▸ (Great Western Railway) method.........replacing 4 abreast rolling stock with 5 abreast -  instant 25% capacity increase !
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5978



View Profile
« Reply #9 on: February 26, 2026, 01:36:40 »

25% ! An absolutely splendid increase in capacity. Indeed shorter trains could be used and STILL  provide "a useful increase in seating capacity".
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU▸ (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
John D
Hero Member
*****
Posts: 437


View Profile
« Reply #10 on: February 26, 2026, 07:39:32 »

25% ! An absolutely splendid increase in capacity. Indeed shorter trains could be used and STILL  provide "a useful increase in seating capacity".

Ah, the narrower seat, and less legroom approach.

What next, a variation of Ryanair style bag width checking frames, just step in that Sir, if you don't fit, then need to buy extra ticket because will overlap onto next seat.

Meanwhile airlines are rapidly increasing Premium Economy seating proportion having found it is the most profitable per square metre of cabin space (even more than business or First which takes up lots of space per seat)
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 2324


Hockley viaduct


View Profile
« Reply #11 on: February 26, 2026, 07:46:18 »

Will this involve an update to the regulations of the carriage of livestock?
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of page • Jump to Forum Home Page