Still ongoing, no reopening date yet available.
Normal services still not expected before 26th August. (1st September for the Haywards Heath and Lewes service affected by a more severe derailment).
Coincidentally, I came across a report from 1966 referring to a derailment of a Glasgow-London sleeper train on the Kilmarnock Line. The train, 22:10 from Glasgow on 13th August, consisted of a class 40 diesel, 13 coaches and 2 vans.
In really foul weather, overflowing streams had covered the rails with rubble. The train was proceeding with caution, but the loco and carriages were derailed and ran for about 200 yards, with loco and several carriages ending up leaning against the cutting walls.
This was early hours of a Sunday morning. In the days before
GSM-R▸ radio, the crew had to protect the train and eventually find a phone to summon help. [In the prevailing weather this was a horrendous task].
At 03:00, the area manager arrived (on a loco commandeered from a circus train

). Buses and a 2 car
DMU▸ arrived at 06:00-ish and 06:25 to provide transport for the passengers (unclear how many, but the passengers were taken to Dumfries "where hotels in the area had been asked to provide 300 breakfasts".
So that was the first 6 hours of 14th August. The report continued:
"The train was back on the rails early on August 15th, and the line was reopened to traffic the following day. Over 300 tons of stones and rubble were cleared from the line".
[Accompanying photos showed two large rail-mounted cranes lifting the class 40; also 6 of the coaches, of which 5 were leaning by various angles]