| Re: 2023 Delays and Cancellations Posted by ChrisB at 19:21, 1st February 2024 | ![]() ![]() ![]() |
The RAIB would have only been concerned with this if there had been a safety aspect - but as the train was probably the safest place for stranded passengers, they found nothing to investigate.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 18:14, 1st February 2024 | ![]() ![]() ![]() |
OK, the big issue in the report is about the wing wall.
But given that there has been much discussion of late about emergency evacuation of trains, there's little mention of what actually happened here.
It's noticeable that the incident happened at 18:35, but that evacuation of the train didn't start until 22:15 and wasn't complete until 23:57. The train was "carrying 365 passengers plus 2 crew" (para 26). Evacuation was "assisted by Oxfordshire Fire and Rescue Service" (para 31), who presumably set up lighting and ladders to move the passengers to the rescue train.
I'm assuming that during this time the driver would be mainly concerned with the train. The conductor must have done a sterling job in keeping everybody calm and well-informed. And on their own - "2 crew" implies no trolley and no First Class host. Perhaps there were Hanborough passengers on board who said "we're out in the middle of nowhere - let's just stay on this nice safe train". We're not told when the fire service arrived - but I'd imagine that if they appeared inside the train then that must have been helpful.
And the evacuation took over an hour and a half - worth remembering that.
| Re: 2023 Delays and Cancellations Posted by ChrisB at 15:58, 1st February 2024 | ![]() ![]() ![]() |
The collapse happened within three weeks of an examining engineer observing that a bulge in the brickwork had increased since a previous inspection.
There is a process for an examiner to directly notify Network Rail if they identify something that requires urgent attention, but this was not thought to be the case in this instance, according to the report.
There is a process for an examiner to directly notify Network Rail if they identify something that requires urgent attention, but this was not thought to be the case in this instance, according to the report.
| Re: 2023 Delays and Cancellations Posted by stuving at 14:51, 1st February 2024 | ![]() ![]() ![]() |
The photograph in the RAIB announcement makes it look as if the wall is made up of two skins of brickwork, with little bonding between the two. You can see this more clearly in the RailAdvent piece.
The RAIB report into this incident has been published, and identifies the big gap between the original wing wall and this thin wall in front (added to it at some time) as important. Not only did it hide the load-bearing wall behind it, but it meant that the last repair (pins grouted into the wall in 2013) was ineffective. It also meant that, when this wall bulged, the one behind was bulging even more, and the state of the wall was misassessed.
| Re: 2023 Delays and Cancellations Posted by grahame at 11:54, 3rd January 2024 | ![]() ![]() ![]() |
For 2024 - new topic at http://www.passenger.chat/28354 - please carry on there. This thread remains open for archive and historical reference back.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 12:42, 27th December 2023 | ![]() ![]() ![]() |
JourneyCheck:
10:19 Reading to Hereford due 12:46 will be terminated at Great Malvern.
It will no longer call at Colwall, Ledbury and Hereford.
It has been delayed at Reading and is now 38 minutes late.
This is due to a late running train being in front of this one.
Last Updated:27/12/2023 11:48
13:18 Hereford to Reading due 15:59 will be started from Great Malvern.
It will no longer call at Hereford, Ledbury and Colwall.
This is due to a late running train being in front of this one.
Last Updated:27/12/2023 11:48
It will no longer call at Colwall, Ledbury and Hereford.
It has been delayed at Reading and is now 38 minutes late.
This is due to a late running train being in front of this one.
Last Updated:27/12/2023 11:48
13:18 Hereford to Reading due 15:59 will be started from Great Malvern.
It will no longer call at Hereford, Ledbury and Colwall.
This is due to a late running train being in front of this one.
Last Updated:27/12/2023 11:48
10:19 from Reading was held for the single line at Evesham and is now 61 late.
The "late running train in front of this one" looks to have been a late arrival at Reading by train 1P20, the 08:15 from Shrub Hill to Reading. This left Shrub Hill 28 late, was held at Norton and at Charlbury, and arrived at Reading 50 late. It left Shrub Hill late becaause the empty stock from Stoke Gifford arrived 34 late.
| Re: 2023 Delays and Cancellations Posted by IndustryInsider at 16:50, 21st December 2023 | ![]() ![]() ![]() |
: Worcester_Passenger
Keep up:
15:17 Worcester Foregate Street to London Paddington due 17:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/12/2023 09:40
This is due to a shortage of train crew.
Last Updated:21/12/2023 09:40
Well JourneyCheck couldn’t. It was reinstated, but still showing as cancelled for a l-o-n-g time after!
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 16:38, 21st December 2023 | ![]() ![]() ![]() |
And more:
14:53 London Paddington to Worcester Foregate Street due 17:04 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/12/2023 14:38
17:26 Worcester Foregate Street to London Paddington due 19:52 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/12/2023 14:38
This is due to a shortage of train crew.
Last Updated:21/12/2023 14:38
17:26 Worcester Foregate Street to London Paddington due 19:52 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/12/2023 14:38
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 14:28, 21st December 2023 | ![]() ![]() ![]() |
Keep up:
15:23 London Paddington to Worcester Foregate Street due 17:47 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/12/2023 13:22
This is due to a shortage of train crew.
Last Updated:21/12/2023 13:22
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 13:01, 21st December 2023 | ![]() ![]() ![]() |
It's not turning out to be a good day:
13:18 Hereford to London Paddington due 16:25 will be started from Worcester Shrub Hill.
It will no longer call at Hereford, Ledbury, Colwall, Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to a tree blocking the railway.
Last Updated:21/12/2023 12:03
09:52 London Paddington to Hereford due 12:46 was terminated at Worcester Shrub Hill.
It will no longer call at Worcester Foregate Street, Malvern Link, Great Malvern, Colwall, Ledbury and Hereford.
This is due to a tree blocking the railway.
Last Updated:21/12/2023 12:03
12:51 London Paddington to Worcester Foregate Street due 15:00 will be reinstated.
This is due to train crew being delayed.
Last Updated:21/12/2023 11:47
It will no longer call at Hereford, Ledbury, Colwall, Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to a tree blocking the railway.
Last Updated:21/12/2023 12:03
09:52 London Paddington to Hereford due 12:46 was terminated at Worcester Shrub Hill.
It will no longer call at Worcester Foregate Street, Malvern Link, Great Malvern, Colwall, Ledbury and Hereford.
This is due to a tree blocking the railway.
Last Updated:21/12/2023 12:03
12:51 London Paddington to Worcester Foregate Street due 15:00 will be reinstated.
This is due to train crew being delayed.
Last Updated:21/12/2023 11:47
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 11:07, 21st December 2023 | ![]() ![]() ![]() |
Add to that list:
15:17 Worcester Foregate Street to London Paddington due 17:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/12/2023 09:40
This is due to a shortage of train crew.
Last Updated:21/12/2023 09:40
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 08:19, 21st December 2023 | ![]() ![]() ![]() |
JourneyCheck:
08:56 Great Malvern to London Paddington due 11:24 will be started from Oxford.
It will no longer call at Great Malvern, Malvern Link, Worcester Foregate Street, Worcester Shrub Hill, Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury and Hanborough.
This is due to a shortage of train crew.
Last Updated:21/12/2023 07:10
11:57 Great Malvern to London Paddington due 14:23 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:21/12/2023 07:54
13:18 Hereford to London Paddington due 16:25 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/12/2023 07:30
05:53 London Paddington to Great Malvern due 08:38 was terminated at Oxford.
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl, Worcester Shrub Hill, Worcester Foregate Street, Malvern Link and Great Malvern.
This is due to a shortage of train crew.
Last Updated:21/12/2023 07:10
08:51 London Paddington to Great Malvern due 11:14 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:21/12/2023 07:54
12:51 London Paddington to Worcester Foregate Street due 15:00 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/12/2023 07:30
It will no longer call at Great Malvern, Malvern Link, Worcester Foregate Street, Worcester Shrub Hill, Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury and Hanborough.
This is due to a shortage of train crew.
Last Updated:21/12/2023 07:10
11:57 Great Malvern to London Paddington due 14:23 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:21/12/2023 07:54
13:18 Hereford to London Paddington due 16:25 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/12/2023 07:30
05:53 London Paddington to Great Malvern due 08:38 was terminated at Oxford.
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl, Worcester Shrub Hill, Worcester Foregate Street, Malvern Link and Great Malvern.
This is due to a shortage of train crew.
Last Updated:21/12/2023 07:10
08:51 London Paddington to Great Malvern due 11:14 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:21/12/2023 07:54
12:51 London Paddington to Worcester Foregate Street due 15:00 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/12/2023 07:30
No mention of the 09:52 from Paddington to Hereford.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 16:21, 20th December 2023 | ![]() ![]() ![]() |
JourneyCheck:
13:18 Hereford to London Paddington due 16:25 has been cancelled.
This is due to a safety inspection of the track.
Last Updated:20/12/2023 14:50
15:18 Hereford to London Paddington due 18:29 will be started from Worcester Shrub Hill.
It will no longer call at Hereford, Ledbury, Colwall, Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to a safety inspection of the track.
Last Updated:20/12/2023 13:53
16:58 London Paddington to Great Malvern due 19:26 will be started from Oxford.
It will no longer call at London Paddington.
This is due to a safety inspection of the track.
Last Updated:20/12/2023 14:50
This is due to a safety inspection of the track.
Last Updated:20/12/2023 14:50
15:18 Hereford to London Paddington due 18:29 will be started from Worcester Shrub Hill.
It will no longer call at Hereford, Ledbury, Colwall, Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to a safety inspection of the track.
Last Updated:20/12/2023 13:53
16:58 London Paddington to Great Malvern due 19:26 will be started from Oxford.
It will no longer call at London Paddington.
This is due to a safety inspection of the track.
Last Updated:20/12/2023 14:50
| Re: 2023 Delays and Cancellations Posted by jdw.wor at 22:23, 19th December 2023 | ![]() ![]() ![]() |
Really Guys
Whether GWR cannot decide if they are to run a train or not is not the issue here. Once they have decided to go public and the decision has been made the train is cancelled. I am finding it difficult to understand an argument which supports the use of "will be cancelled" in case they might run it. If circumstances do change and a previously cancelled train can run the standard reinstatement message can be made. Please do not create another situation where railway communications are less than 100% clear
| Re: 2023 Delays and Cancellations Posted by grahame at 19:04, 19th December 2023 | ![]() ![]() ![]() |
GWR have a 'nasty' habit of reinstating trains previously notified as cancelled - presumably as they might find crew/stock/etc become available.
So "will" is quite possible.
So "will" is quite possible.
It is an extremely difficult call for them within the limits of being able tp say a train is running or it isn't - whatever wording they use.
If GWR are 95% they can run a train, I (presume) they'll say nothing about it being cancelled. If they know that a train won't run barring a 5% miracle, they all say it is cancelled. But what should they say at a 50% chance - if they simply don't know?
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 18:07, 19th December 2023 | ![]() ![]() ![]() |
JourneyCheck now reporting:
15:52 London Paddington to Great Malvern due 18:26 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:19/12/2023 11:29
This is due to more trains than usual needing repairs at the same time.
Last Updated:19/12/2023 11:29
They've changed their explanation. RTT is reporting
1W31 1552 London Paddington to Great Malvern
This service was cancelled due to late arrival of an inbound service (YI).
This service was cancelled due to late arrival of an inbound service (YI).
| Re: 2023 Delays and Cancellations Posted by ChrisB at 16:15, 19th December 2023 | ![]() ![]() ![]() |
GWR have a 'nasty' habit of reinstating trains previously notified as cancelled - presumably as they might find crew/stock/etc become available.
So "will" is quite possible.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 14:34, 19th December 2023 | ![]() ![]() ![]() |
JourneyCheck is no longer reporting that the 15:23 from Paddington to Foregate Street will be terminated at Oxford.
It is not reporting that this "has been reinstated", which is the usual format.
| Re: 2023 Delays and Cancellations Posted by jdw.wor at 13:38, 19th December 2023 | ![]() ![]() ![]() |
I might be sticking my neck out here but I cringe every time I read xxxx WILL be cancelled. If the decision is made not run a train it IS cancelled. If there is an overwhelming desire by those who update information to us the word WILL could they not say the train WILL not run.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 11:58, 19th December 2023 | ![]() ![]() ![]() |
JourneyCheck now reporting:
15:52 London Paddington to Great Malvern due 18:26 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:19/12/2023 11:29
19:05 Great Malvern to London Paddington due 21:24 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:19/12/2023 11:29
This is due to more trains than usual needing repairs at the same time.
Last Updated:19/12/2023 11:29
19:05 Great Malvern to London Paddington due 21:24 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:19/12/2023 11:29
The halts train, 17:23 departure from Oxford, will be a bit busy tonight.
| Re: 2023 Delays and Cancellations Posted by Witham Bobby at 09:50, 19th December 2023 | ![]() ![]() ![]() |
07:50 London Paddington to Great Malvern due 10:12 has been delayed at Oxford and is now 17 minutes late.
This is due to a fault on this train.
Last Updated:19/12/2023 09:02
This is due to a fault on this train.
Last Updated:19/12/2023 09:02
08:15 Worcester Shrub Hill to London Paddington due 10:23 will be delayed at Charlbury and is expected to be 7 minutes late.
This is due to a fault on this train.
Last Updated:19/12/2023 09:02
This is due to a fault on this train.
Last Updated:19/12/2023 09:02
15:23 London Paddington to Worcester Foregate Street due 17:47 will be terminated at Oxford.
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl, Worcester Shrub Hill and Worcester Foregate Street.
This is due to a shortage of train crew.
Last Updated:19/12/2023 08:56
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl, Worcester Shrub Hill and Worcester Foregate Street.
This is due to a shortage of train crew.
Last Updated:19/12/2023 08:56
At present, no mention of 1P40, the 1802 return to Paddington from Foregate Street
| Re: 2023 Delays and Cancellations Posted by Witham Bobby at 16:04, 18th December 2023 | ![]() ![]() ![]() |
17:04 Didcot Parkway to Moreton-In-Marsh due 18:10 will be cancelled.
This is due to a fault on this train.
Last Updated:18/12/2023 15:45
This is due to a fault on this train.
Last Updated:18/12/2023 15:45
18:51 Evesham to Oxford due 19:50 will be cancelled.
This is due to a fault on this train.
Last Updated:18/12/2023 15:45
This is due to a fault on this train.
Last Updated:18/12/2023 15:45
| Re: 2023 Delays and Cancellations Posted by charles_uk at 09:57, 18th December 2023 | ![]() ![]() ![]() |
This morning's 06:43 Worcester Shrub Hill to Paddington service was "cancelled due to late arrival of an inbound service (YI)". The following London bound service, the 07:13 Great Malvern to Paddington train was "cancelled between Great Malvern and Worcester Foregate Street due to late arrival of an inbound service (YI)" and was 34 minutes late by the time it arrived at Oxford. Effectively a delay of almost an an hour and a half for those due to travel on the earlier service.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 17:08, 15th December 2023 | ![]() ![]() ![]() |
JourneyCheck:
15:17 Worcester Foregate Street to London Paddington due 17:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:15/12/2023 14:59
18:51 Evesham to Oxford due 19:50 will be cancelled.
This is due to a shortage of train crew.
Last Updated:15/12/2023 17:05
22:00 Hereford to London Paddington due 01:20 will be cancelled.
This is due to a shortage of train crew.
Last Updated:15/12/2023 02:00
15:23 London Paddington to Worcester Foregate Street due 17:47 will be reinstated.
It will be started from Oxford.
It will no longer call at London Paddington, Reading and Didcot Parkway.
This is due to more trains than usual needing repairs at the same time.
Last Updated:15/12/2023 13:05
17:04 Didcot Parkway to Moreton-In-Marsh due 18:10 has been cancelled.
This is due to a shortage of train crew.
Last Updated:15/12/2023 17:05
17:34 London Paddington to Hereford due 20:26 will be cancelled.
This is due to a shortage of train crew.
Last Updated:15/12/2023 02:00
This is due to a shortage of train crew.
Last Updated:15/12/2023 14:59
18:51 Evesham to Oxford due 19:50 will be cancelled.
This is due to a shortage of train crew.
Last Updated:15/12/2023 17:05
22:00 Hereford to London Paddington due 01:20 will be cancelled.
This is due to a shortage of train crew.
Last Updated:15/12/2023 02:00
15:23 London Paddington to Worcester Foregate Street due 17:47 will be reinstated.
It will be started from Oxford.
It will no longer call at London Paddington, Reading and Didcot Parkway.
This is due to more trains than usual needing repairs at the same time.
Last Updated:15/12/2023 13:05
17:04 Didcot Parkway to Moreton-In-Marsh due 18:10 has been cancelled.
This is due to a shortage of train crew.
Last Updated:15/12/2023 17:05
17:34 London Paddington to Hereford due 20:26 will be cancelled.
This is due to a shortage of train crew.
Last Updated:15/12/2023 02:00
18:00 - Edited to add halts train to JourneyCheck list.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 11:00, 15th December 2023 | ![]() ![]() ![]() |
06:50 London Paddington to Great Malvern due 09:29 has been cancelled.
This is due to a fault with the signalling system.
Last Updated:15/12/2023 07:44
This is due to a fault with the signalling system.
Last Updated:15/12/2023 07:44
RTT has the cancellation being as "due to an issue with the traincrew"
No mention about the return working being caped
09:54 Great Malvern to London Paddington due 12:23 will be started from Worcester Shrub Hill.
It will no longer call at Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to a fault with the signalling system.
Last Updated:15/12/2023 07:44
It will no longer call at Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to a fault with the signalling system.
Last Updated:15/12/2023 07:44
| Re: 2023 Delays and Cancellations Posted by Witham Bobby at 09:45, 15th December 2023 | ![]() ![]() ![]() |
06:50 London Paddington to Great Malvern due 09:29 has been cancelled.
This is due to a fault with the signalling system.
Last Updated:15/12/2023 07:44
This is due to a fault with the signalling system.
Last Updated:15/12/2023 07:44
RTT has the cancellation being as "due to an issue with the traincrew"
No mention about the return working being caped
08:15 Worcester Shrub Hill to London Paddington due 10:23 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:15/12/2023 02:00
This is due to more trains than usual needing repairs at the same time.
Last Updated:15/12/2023 02:00
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 09:07, 14th December 2023 | ![]() ![]() ![]() |
JourneyCheck reports:
Due to a fault with barriers at a level crossing between Worcester Foregate Street and Oxford trains have to run at reduced speed on all lines.
Train services running through these stations may be delayed by up to 15 minutes. Disruption is expected until 12:00 14/12.
Last Updated:14/12/2023 08:44
The level crossing seems to be between Evesham and Honeybourne. RTT is reporting that train 1P02, 05:23 Hereford - Paddington, left Evesham on time but was 12 late at Honeybourne. It continued to lose time thereafter - +22 at Reading and +36 at Paddington.Train services running through these stations may be delayed by up to 15 minutes. Disruption is expected until 12:00 14/12.
Last Updated:14/12/2023 08:44
But ... the problem does seem to have cleared by the time of the halts train.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 08:54, 11th December 2023 | ![]() ![]() ![]() |
JourneyCheck:
05:53 London Paddington to Great Malvern due 08:38 was terminated at Moreton-In-Marsh.
It will no longer call at Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl, Worcester Shrub Hill, Worcester Foregate Street, Malvern Link and Great Malvern.
It has been delayed at Didcot Parkway and is now 16 minutes late.
This is due to a fault on this train.
Last Updated:11/12/2023 07:52
08:56 Great Malvern to London Paddington due 11:24 will be cancelled.
This is due to a fault on this train.
Last Updated:11/12/2023 08:21
It will no longer call at Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl, Worcester Shrub Hill, Worcester Foregate Street, Malvern Link and Great Malvern.
It has been delayed at Didcot Parkway and is now 16 minutes late.
This is due to a fault on this train.
Last Updated:11/12/2023 07:52
08:56 Great Malvern to London Paddington due 11:24 will be cancelled.
This is due to a fault on this train.
Last Updated:11/12/2023 08:21
| Re: 2023 Delays and Cancellations Posted by JayMac at 12:42, 10th December 2023 | ![]() ![]() ![]() |
Small correction. The OLE didn't fall down. It merely tripped out. Early reports of 'damage' were incorrect.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 12:40, 10th December 2023 | ![]() ![]() ![]() |
Sunday's shambles is caused by the OHLE falling down between Reading and Paddington.
Again.
https://www.youtube.com/watch?v=5eXFzqWiCSI may be relevant.
RTT reports:
1P30 0815 Worcester Foregate Street to London Paddington : terminated at Reading (?)
1P37 0858 Great Malvern to London Paddington : terminated at Reading (?)
1P41 0958 Great Malvern to London Paddington : same
JourneyCheck reports:
09:58 Great Malvern to London Paddington due 12:28 will be delayed at Reading.
This is due to damage to the overhead electric wires.
Last Updated:10/12/2023 10:22
16:59 Great Malvern to London Paddington due 19:28 will be terminated at Reading.
It will no longer call at London Paddington.
This is due to a shortage of train crew.
Last Updated:10/12/2023 02:20
18:57 Great Malvern to London Paddington due 21:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:10/12/2023 00:58
09:48 London Paddington to Hereford due 13:01 has been cancelled.
This is due to damage to the overhead electric wires.
Last Updated:10/12/2023 10:30
10:48 London Paddington to Great Malvern due 13:14 has been cancelled.
This is due to damage to the overhead electric wires.
Last Updated:10/12/2023 11:13
11:48 London Paddington to Hereford due 15:04 will be starting late from London Paddington.
This is due to damage to the overhead electric wires.
Last Updated:10/12/2023 10:09
15:48 London Paddington to Great Malvern due 18:15 will be cancelled.
This is due to a shortage of train crew.
Last Updated:10/12/2023 00:58
This is due to damage to the overhead electric wires.
Last Updated:10/12/2023 10:22
16:59 Great Malvern to London Paddington due 19:28 will be terminated at Reading.
It will no longer call at London Paddington.
This is due to a shortage of train crew.
Last Updated:10/12/2023 02:20
18:57 Great Malvern to London Paddington due 21:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:10/12/2023 00:58
09:48 London Paddington to Hereford due 13:01 has been cancelled.
This is due to damage to the overhead electric wires.
Last Updated:10/12/2023 10:30
10:48 London Paddington to Great Malvern due 13:14 has been cancelled.
This is due to damage to the overhead electric wires.
Last Updated:10/12/2023 11:13
11:48 London Paddington to Hereford due 15:04 will be starting late from London Paddington.
This is due to damage to the overhead electric wires.
Last Updated:10/12/2023 10:09
15:48 London Paddington to Great Malvern due 18:15 will be cancelled.
This is due to a shortage of train crew.
Last Updated:10/12/2023 00:58
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 11:53, 9th December 2023 | ![]() ![]() ![]() |
The falling-down of the wires continues to cause problems. JourneyCheck has
Cancellations to services between Worcester Foregate Street and Oxford
Due to damage to the overhead electric wires earlier today between Worcester Foregate Street and Oxford fewer trains are able to run on all lines.
Train services running through these stations may be cancelled or delayed. Disruption is expected until 12:00 09/12.
Customer Advice
-
Please be advised that following this weeks overhead line equipment disruption between Reading and London Paddington we've trains sets displaced across our network. As a consequence, we have three consecutive Worcester to London Paddington services cancelled.
-
Customers are advised that the 08:28 Worcester Foregate Street has now departed Worcester Shrub Hill 88 minutes late (having started at Shrub Hill) and will be the next available London-bound service.
-
Customers may also use their GWR rail ticket(s) on West Midlands Railway to Birmingham New Street and on Avanti West Coast from Birmingham New Street to London Euston as a viable alternative. We have also requested 2 coaches to operate a Worcester Foregate Street to Oxford service calling at all Worcester stations, Evesham, Moreton-in-Marsh, Kingham, Hanborough and Oxford. These are to be confirmed.
-
Customers travelling to/from stations not listed above, such as Pershore, Honeybourne, Shipton and Charlbury, you're advised to trigger one of the available help-points located on platform level if you require further assistance planning your journey.
-
We apologise for any inconvenience caused to your journey with us today.
Last Updated:09/12/2023 10:51
Due to damage to the overhead electric wires earlier today between Worcester Foregate Street and Oxford fewer trains are able to run on all lines.
Train services running through these stations may be cancelled or delayed. Disruption is expected until 12:00 09/12.
Customer Advice
-
Please be advised that following this weeks overhead line equipment disruption between Reading and London Paddington we've trains sets displaced across our network. As a consequence, we have three consecutive Worcester to London Paddington services cancelled.
-
Customers are advised that the 08:28 Worcester Foregate Street has now departed Worcester Shrub Hill 88 minutes late (having started at Shrub Hill) and will be the next available London-bound service.
-
Customers may also use their GWR rail ticket(s) on West Midlands Railway to Birmingham New Street and on Avanti West Coast from Birmingham New Street to London Euston as a viable alternative. We have also requested 2 coaches to operate a Worcester Foregate Street to Oxford service calling at all Worcester stations, Evesham, Moreton-in-Marsh, Kingham, Hanborough and Oxford. These are to be confirmed.
-
Customers travelling to/from stations not listed above, such as Pershore, Honeybourne, Shipton and Charlbury, you're advised to trigger one of the available help-points located on platform level if you require further assistance planning your journey.
-
We apologise for any inconvenience caused to your journey with us today.
Last Updated:09/12/2023 10:51
Meanwhile, RTT reports:
1P66 08:28 Foregate Street - Paddington : started from Shrub Hill 89 late. JourneyCheck has "This is due to train crew being delayed by service disruption".
1P17 08:50 Great Malvern - Paddington : Problems with reversing at Malvern. Departed 57 late and ran to Shrub Hill (+84). Cancelled thereafter "due to severe flooding (X2)".
1P19 09:58 Great Malvern - Paddington : "cancelled due to severe flooding (X2)". JourneyCheck has "This is due to damage to the overhead electric wires earlier today".
1P21 10:50 Great Malvern - Paddington : "cancelled due to late arrival of an inbound service (YI)". Inbound service cancelled throughout. JourneyCheck has "This is due to damage to the overhead electric wires earlier today".
1W13 06:52 Paddington - Great Malvern : "cancelled due to an issue with the train crew (TG)".
1W15 07:52 Paddington - Great Malvern : "cancelled due to the train operator's request (TB)".
And Journey Check reports:
11:50 London Paddington to Hereford due 14:43 will be cancelled.
This is due to heavy rain flooding the railway.
Last Updated:09/12/2023 10:58
15:13 Hereford to London Paddington due 18:22 will be started from Worcester Shrub Hill.
This is due to heavy rain flooding the railway.
Last Updated:09/12/2023 10:58
15:52 London Paddington to Great Malvern due 18:29 will be terminated at Reading.
This is due to a shortage of train crew.
Last Updated:09/12/2023 04:29
18:52 London Paddington to Great Malvern due 21:13 will be terminated at Worcester Shrub Hill.
This is due to industrial action.
Last Updated:09/12/2023 09:47
This is due to heavy rain flooding the railway.
Last Updated:09/12/2023 10:58
15:13 Hereford to London Paddington due 18:22 will be started from Worcester Shrub Hill.
This is due to heavy rain flooding the railway.
Last Updated:09/12/2023 10:58
15:52 London Paddington to Great Malvern due 18:29 will be terminated at Reading.
This is due to a shortage of train crew.
Last Updated:09/12/2023 04:29
18:52 London Paddington to Great Malvern due 21:13 will be terminated at Worcester Shrub Hill.
This is due to industrial action.
Last Updated:09/12/2023 09:47
| Re: 2023 Delays and Cancellations Posted by IndustryInsider at 17:04, 8th December 2023 | ![]() ![]() ![]() |
1W02 turned into the following service at Reading, more or less on time, to Worcester Foregate Street.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 16:55, 8th December 2023 | ![]() ![]() ![]() |
RTT:
1W02 1152 London Paddington to Reading
This service was cancelled between Reading and Hereford due to unknown cause (ZW).
This service was cancelled between Reading and Hereford due to unknown cause (ZW).
JourneyCheck:
15:18 Hereford to London Paddington due 18:29 will be started from Oxford.
This is due to industrial action.
Last Updated:08/12/2023 13:17
This is due to industrial action.
Last Updated:08/12/2023 13:17
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 12:28, 8th December 2023 | ![]() ![]() ![]() |
09:52 London Paddington to Hereford due 12:46 will be terminated at Ledbury.
It will no longer call at Hereford.
It is being delayed at London Paddington.
This is due to damage to the overhead electric wires earlier today.
Last Updated:08/12/2023 11:59
10:53 London Paddington to Worcester Shrub Hill due 13:01 is being delayed between London Paddington and Reading and is now expected to be 21 minutes late.
This is due to damage to the overhead electric wires earlier today.
Last Updated:08/12/2023 11:23
10:59 Great Malvern to London Paddington due 13:24 will be started from Worcester Shrub Hill.
It will no longer call at Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to damage to the overhead electric wires earlier today.
Last Updated:08/12/2023 10:09
11:57 Great Malvern to London Paddington due 14:22 will be started from Worcester Shrub Hill.
It will no longer call at Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to damage to the overhead electric wires.
Last Updated:08/12/2023 10:59
13:18 Hereford to London Paddington due 16:22 will be started from Ledbury.
It will no longer call at Hereford.
This is due to damage to the overhead electric wires earlier today.
Last Updated:08/12/2023 11:59
It will no longer call at Hereford.
It is being delayed at London Paddington.
This is due to damage to the overhead electric wires earlier today.
Last Updated:08/12/2023 11:59
10:53 London Paddington to Worcester Shrub Hill due 13:01 is being delayed between London Paddington and Reading and is now expected to be 21 minutes late.
This is due to damage to the overhead electric wires earlier today.
Last Updated:08/12/2023 11:23
10:59 Great Malvern to London Paddington due 13:24 will be started from Worcester Shrub Hill.
It will no longer call at Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to damage to the overhead electric wires earlier today.
Last Updated:08/12/2023 10:09
11:57 Great Malvern to London Paddington due 14:22 will be started from Worcester Shrub Hill.
It will no longer call at Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to damage to the overhead electric wires.
Last Updated:08/12/2023 10:59
13:18 Hereford to London Paddington due 16:22 will be started from Ledbury.
It will no longer call at Hereford.
This is due to damage to the overhead electric wires earlier today.
Last Updated:08/12/2023 11:59
| Re: 2023 Delays and Cancellations Posted by GBM at 11:24, 8th December 2023 | ![]() ![]() ![]() |
Today - Friday 8 December - RTT seems to have lost quite a bit of data.
RTT had a major hiccup earlier this morning.Seems to be returning to normal service now.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 10:20, 8th December 2023 | ![]() ![]() ![]() |
Today - Friday 8 December - RTT seems to have lost quite a bit of data.
From RTT:
1P11 0514 Worcester Shrub Hill to London Paddington
"This service was cancelled due to a decision by the train operating company (TR)."
1W13 0650 London Paddington to Worcester Shrub Hill
"This service was cancelled between Worcester Shrub Hill and Great Malvern due to late arrival of an inbound service (YI)." [42 late into Shrub Hill]
1W15 0750 London Paddington to Great Malvern left Paddington 33 late. Currently 42 late at Honeybourne.
From JourneyCheck:
08:56 Great Malvern to London Paddington due 11:24 will be cancelled.
This is due to damage to the overhead electric wires.
Last Updated:08/12/2023 04:11
09:54 Great Malvern to London Paddington due 12:22 will be started from Worcester Shrub Hill.
This is due to damage to the overhead electric wires.
Last Updated:08/12/2023 08:11
08:51 London Paddington to Great Malvern due 11:14 is being delayed at London Paddington.
This is due to a fault on this train.
Last Updated:08/12/2023 09:13
RTT reports the 08:51 as having left 30 late. Currently 24 late at Hanborough.This is due to damage to the overhead electric wires.
Last Updated:08/12/2023 04:11
09:54 Great Malvern to London Paddington due 12:22 will be started from Worcester Shrub Hill.
This is due to damage to the overhead electric wires.
Last Updated:08/12/2023 08:11
08:51 London Paddington to Great Malvern due 11:14 is being delayed at London Paddington.
This is due to a fault on this train.
Last Updated:08/12/2023 09:13
| Re: 2023 Delays and Cancellations Posted by charles_uk at 17:00, 6th December 2023 | ![]() ![]() ![]() |
14:53 London Paddington to Worcester Foregate Street due 17:04 will no longer call at Hanborough, Charlbury, Kingham, Honeybourne and Pershore.
It has been delayed at London Paddington and is now 22 minutes late.
This is due to a shortage of train crew.
Last Updated:06/12/2023 15:45
It has been delayed at London Paddington and is now 22 minutes late.
This is due to a shortage of train crew.
Last Updated:06/12/2023 15:45
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 11:49, 6th December 2023 | ![]() ![]() ![]() |
Adding to the earlier list:
1P02 05:23 Hereford - Paddington : left Shrub Hill 74 late as described above, 67 late into Paddington.
1P18 07:13 Great Malvern - Paddington : RTT reports "This service was cancelled due to late arrival of an inbound service (YI)"
Inbound service is 3G18 04:40 Stoke Gifford - Great Malvern : "This service was cancelled due to a delay not investigated (OU)."
1P24 09:54 Great Malvern - Paddington : "cancelled between Great Malvern and Oxford due to unknown cause (ZW)".
1W13 06:50 Paddington - Great Malvern : cancelled after Oxford "due to unknown cause (ZW)"
| Re: 2023 Delays and Cancellations Posted by charles_uk at 07:32, 6th December 2023 | ![]() ![]() ![]() |
And meanwhile the 0523 seems to have been sitting in Foregate Street platform 1 for 50 minutes and counting, if the live departure boards are to be believed.
GWR on Twitter say the signalling system is up the spout (not exact quote).
GWR on Twitter say the signalling system is up the spout (not exact quote).
Realtime Trains suggesting it's just got to Worcestershire Parkway 74 minutes late. Luckily, the halts train seems to be on time so will be able to pick everyone up...
| Re: 2023 Delays and Cancellations Posted by Richard Fairhurst at 06:56, 6th December 2023 | ![]() ![]() ![]() |
And meanwhile the 0523 seems to have been sitting in Foregate Street platform 1 for 50 minutes and counting, if the live departure boards are to be believed.
GWR on Twitter say the signalling system is up the spout (not exact quote).
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 06:44, 6th December 2023 | ![]() ![]() ![]() |
Sorry Richard:
06:43 Worcester Shrub Hill to London Paddington due 08:43 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 05:16
09:52 London Paddington to Hereford due 12:46 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 03:35
11:52 London Paddington to Hereford due 14:41 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 00:31
13:18 Hereford to London Paddington due 16:22 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 00:30
15:18 Hereford to London Paddington due 18:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 00:32
17:57 London Paddington to Worcester Foregate Street due 20:07 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 00:35
19:53 London Paddington to Hereford due 22:58 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 00:39
20:56 Worcester Foregate Street to London Paddington due 23:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 00:35
This is due to a shortage of train crew.
Last Updated:06/12/2023 05:16
09:52 London Paddington to Hereford due 12:46 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 03:35
11:52 London Paddington to Hereford due 14:41 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 00:31
13:18 Hereford to London Paddington due 16:22 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 00:30
15:18 Hereford to London Paddington due 18:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 00:32
17:57 London Paddington to Worcester Foregate Street due 20:07 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 00:35
19:53 London Paddington to Hereford due 22:58 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 00:39
20:56 Worcester Foregate Street to London Paddington due 23:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:06/12/2023 00:35
| Re: 2023 Delays and Cancellations Posted by Richard Fairhurst at 06:21, 6th December 2023 | ![]() ![]() ![]() |
06:43 Worcester Shrub Hill to London Paddington due 08:43 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:05/12/2023 05:17
This is due to more trains than usual needing repairs at the same time.
Last Updated:05/12/2023 05:17
And the preceding 05:23 Hereford to Paddington being a five coach short-formation.
I'm supposed to be catching the 06:43 tomorrow. Hopefully, third time lucky this week...
Unfortunately not. That’s three days in a row it’s been cancelled, and tomorrow is a strike day.
Passengers were apparently left on the platform at Hanborough on the 0523 yesterday and there was a tannoy announcement regretting the “unsafe” conditions.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 12:33, 5th December 2023 | ![]() ![]() ![]() |
And this evening:
20:52 London Paddington to Great Malvern due 23:12 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:05/12/2023 05:38
22:51 London Paddington to Worcestershire Parkway Hl due 01:06 will be cancelled.
This is due to a shortage of train crew.
Last Updated:05/12/2023 00:42
This is due to more trains than usual needing repairs at the same time.
Last Updated:05/12/2023 05:38
22:51 London Paddington to Worcestershire Parkway Hl due 01:06 will be cancelled.
This is due to a shortage of train crew.
Last Updated:05/12/2023 00:42
| Re: 2023 Delays and Cancellations Posted by charles_uk at 09:00, 5th December 2023 | ![]() ![]() ![]() |
06:43 Worcester Shrub Hill to London Paddington due 08:43 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:05/12/2023 05:17
This is due to more trains than usual needing repairs at the same time.
Last Updated:05/12/2023 05:17
And the preceding 05:23 Hereford to Paddington being a five coach short-formation.
I'm supposed to be catching the 06:43 tomorrow. Hopefully, third time lucky this week...
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 01:50, 5th December 2023 | ![]() ![]() ![]() |
And, looking in more detail at RTT (at https://www.realtimetrains.co.uk/service/gb-nr:P75690/2023-12-04/detailed#allox_id=0) the 17:34 from Paddington to Hereford set off from Paddington with unit 802106 but at Reading this was swapped for 800305. This left Reading 34 late. It was 36 late at Charlbury but lost time after that, arriving at Shrub Hill 62 late, where it gave up.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 23:59, 4th December 2023 | ![]() ![]() ![]() |
And, from RTT
1W34 1757 London Paddington to Reading
This service is partially cancelled
This service was cancelled between Reading and Worcester Foregate Street due to a problem with the traction equipment (MD).
This service is partially cancelled
This service was cancelled between Reading and Worcester Foregate Street due to a problem with the traction equipment (MD).
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 22:51, 4th December 2023 | ![]() ![]() ![]() |
20:52 London Paddington to Great Malvern due 23:12 will be cancelled.
This is due to a shortage of train crew.
Last Updated:03/12/2023 22:24
20:56 Worcester Foregate Street to London Paddington due 23:29 will be cancelled.
This is due to a broken down train.
Last Updated:04/12/2023 18:33
22:00 Hereford to London Paddington due 01:16 will be reinstated.
It will be started from Worcester Shrub Hill.
It will no longer call at Hereford, Ledbury, Colwall, Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to a fault on this train.
Last Updated:04/12/2023 18:30
This is due to a shortage of train crew.
Last Updated:03/12/2023 22:24
20:56 Worcester Foregate Street to London Paddington due 23:29 will be cancelled.
This is due to a broken down train.
Last Updated:04/12/2023 18:33
22:00 Hereford to London Paddington due 01:16 will be reinstated.
It will be started from Worcester Shrub Hill.
It will no longer call at Hereford, Ledbury, Colwall, Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to a fault on this train.
Last Updated:04/12/2023 18:30
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 10:30, 4th December 2023 | ![]() ![]() ![]() |
And now some more:
07:50 London Paddington to Great Malvern due 10:12 will be cancelled.
This is due to a shortage of train crew.
Last Updated:04/12/2023 07:29
10:59 Great Malvern to London Paddington due 13:24 will be cancelled.
This is due to a shortage of train crew.
Last Updated:04/12/2023 07:29
19:33 London Paddington to Worcester Shrub Hill due 22:08 will be cancelled.
This is due to a shortage of train crew.
Last Updated:03/12/2023 22:11
22:51 London Paddington to Worcestershire Parkway Hl due 01:06 will be cancelled.
This is due to a shortage of train crew.
Last Updated:03/12/2023 22:35
This is due to a shortage of train crew.
Last Updated:04/12/2023 07:29
10:59 Great Malvern to London Paddington due 13:24 will be cancelled.
This is due to a shortage of train crew.
Last Updated:04/12/2023 07:29
19:33 London Paddington to Worcester Shrub Hill due 22:08 will be cancelled.
This is due to a shortage of train crew.
Last Updated:03/12/2023 22:11
22:51 London Paddington to Worcestershire Parkway Hl due 01:06 will be cancelled.
This is due to a shortage of train crew.
Last Updated:03/12/2023 22:35
| Re: 2023 Delays and Cancellations Posted by Richard Fairhurst at 23:01, 3rd December 2023 | ![]() ![]() ![]() |
JourneyCheck showing that the two main commuter trains tomorrow are cancelled:
https://tinyurl.com/atdnkxnz
Seriously unimpressed. Mrs F is currently working out what time she has to drive from Charlbury to get to work (in Oxford) on time. No trains between 0611 and 0805 is not a great situation.
The 0805 is going to be entertaining carnage if two IETs’ worth of people are trying to fit into an (already fairly busy) 2-carriage Turbo!
| Re: 2023 Delays and Cancellations Posted by charles_uk at 18:27, 1st December 2023 | ![]() ![]() ![]() |
17:34 London Paddington to Hereford due 20:26 will be terminated at Oxford.
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Evesham, Worcestershire Parkway Hl, Worcester Shrub Hill, Worcester Foregate Street, Malvern Link, Great Malvern, Colwall, Ledbury and Hereford.
This is due to a shortage of train crew.
19:53 London Paddington to Hereford due 22:58 will be terminated at Oxford.
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl, Worcester Shrub Hill, Worcester Foregate Street, Malvern Link, Great Malvern, Colwall, Ledbury and Hereford.
This is due to a shortage of train crew.
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Evesham, Worcestershire Parkway Hl, Worcester Shrub Hill, Worcester Foregate Street, Malvern Link, Great Malvern, Colwall, Ledbury and Hereford.
This is due to a shortage of train crew.
19:53 London Paddington to Hereford due 22:58 will be terminated at Oxford.
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl, Worcester Shrub Hill, Worcester Foregate Street, Malvern Link, Great Malvern, Colwall, Ledbury and Hereford.
This is due to a shortage of train crew.
| Re: 2023 Delays and Cancellations Posted by charles_uk at 16:24, 1st December 2023 | ![]() ![]() ![]() |
14:53 London Paddington to Worcester Foregate Street due 17:04 will be cancelled.
This is due to a shortage of train crew.
15:52 London Paddington to Great Malvern due 18:26 will be cancelled.
This is due to a shortage of train crew.
This is due to a shortage of train crew.
15:52 London Paddington to Great Malvern due 18:26 will be cancelled.
This is due to a shortage of train crew.
Unsurprisingly, the GWR app is showing the late running 15:23 Paddington to Worcester Foregate Street as having no unoccupied seats.
| Re: 2023 Delays and Cancellations Posted by Richard Fairhurst at 16:21, 1st December 2023 | ![]() ![]() ![]() |
1350 and 1523 from Paddington both running about 20 late.
| Re: 2023 Delays and Cancellations Posted by Witham Bobby at 15:21, 1st December 2023 | ![]() ![]() ![]() |
14:53 London Paddington to Worcester Foregate Street due 17:04 will be cancelled.
This is due to a shortage of train crew.
15:52 London Paddington to Great Malvern due 18:26 will be cancelled.
This is due to a shortage of train crew.
17:26 Worcester Foregate Street to London Paddington due 19:54 will be cancelled.
This is due to a shortage of train crew.
19:05 Great Malvern to London Paddington due 21:24 will be cancelled.
This is due to a shortage of train crew.
19:33 London Paddington to Worcester Shrub Hill due 22:08 will be cancelled.
This is due to a shortage of train crew.
This is due to a shortage of train crew.
15:52 London Paddington to Great Malvern due 18:26 will be cancelled.
This is due to a shortage of train crew.
17:26 Worcester Foregate Street to London Paddington due 19:54 will be cancelled.
This is due to a shortage of train crew.
19:05 Great Malvern to London Paddington due 21:24 will be cancelled.
This is due to a shortage of train crew.
19:33 London Paddington to Worcester Shrub Hill due 22:08 will be cancelled.
This is due to a shortage of train crew.
Service? What service?
I take it the drivers' overtime ban is the proximate cause. But isn't there a cause-behind-the-cause of not sufficient drivers being employed to cover the service with normal working hours?
| Re: 2023 Delays and Cancellations Posted by charles_uk at 14:29, 1st December 2023 | ![]() ![]() ![]() |
14:53 London Paddington to Worcester Foregate Street due 17:04 will be cancelled.
This is due to a shortage of train crew.
15:52 London Paddington to Great Malvern due 18:26 will be cancelled.
This is due to a shortage of train crew.
17:26 Worcester Foregate Street to London Paddington due 19:54 will be cancelled.
This is due to a shortage of train crew.
19:05 Great Malvern to London Paddington due 21:24 will be cancelled.
This is due to a shortage of train crew.
19:33 London Paddington to Worcester Shrub Hill due 22:08 will be cancelled.
This is due to a shortage of train crew.
This is due to a shortage of train crew.
15:52 London Paddington to Great Malvern due 18:26 will be cancelled.
This is due to a shortage of train crew.
17:26 Worcester Foregate Street to London Paddington due 19:54 will be cancelled.
This is due to a shortage of train crew.
19:05 Great Malvern to London Paddington due 21:24 will be cancelled.
This is due to a shortage of train crew.
19:33 London Paddington to Worcester Shrub Hill due 22:08 will be cancelled.
This is due to a shortage of train crew.
| Re: 2023 Delays and Cancellations Posted by Witham Bobby at 09:50, 1st December 2023 | ![]() ![]() ![]() |
07:13 Great Malvern to London Paddington due 09:40 will be cancelled.
This is due to a shortage of train crew.
Last Updated:01/12/2023 05:49
This is due to a shortage of train crew.
Last Updated:01/12/2023 05:49
RTT has the reason for the cancellation as "late arrival of the incoming service"
| Re: 2023 Delays and Cancellations Posted by charles_uk at 14:55, 30th November 2023 | ![]() ![]() ![]() |
And more still....
13:50 London Paddington to Great Malvern due 16:15 will be terminated at Oxford.
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl, Worcester Shrub Hill, Worcester Foregate Street, Malvern Link and Great Malvern.
This is due to a shortage of train crew.
16:32 Great Malvern to London Paddington due 19:29 will be started from Oxford.
It will no longer call at Great Malvern, Malvern Link, Worcester Foregate Street, Worcester Shrub Hill, Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury and Hanborough.
This is due to a shortage of train crew.
Last Updated:30/11/2023 14:05
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl, Worcester Shrub Hill, Worcester Foregate Street, Malvern Link and Great Malvern.
This is due to a shortage of train crew.
16:32 Great Malvern to London Paddington due 19:29 will be started from Oxford.
It will no longer call at Great Malvern, Malvern Link, Worcester Foregate Street, Worcester Shrub Hill, Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury and Hanborough.
This is due to a shortage of train crew.
Last Updated:30/11/2023 14:05
| Re: 2023 Delays and Cancellations Posted by charles_uk at 12:15, 30th November 2023 | ![]() ![]() ![]() |
And there's more!
10:53 London Paddington to Worcester Shrub Hill due 13:01 will be terminated at Oxford.
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl and Worcester Shrub Hill.
It has been delayed at London Paddington and is now 43 minutes late.
This is due to a points failure.
13:16 Worcester Shrub Hill to London Paddington due 15:22 will be started from Oxford.
It will no longer call at Worcester Shrub Hill, Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury and Hanborough.
This is due to a points failure.
Last Updated:30/11/2023 12:02
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl and Worcester Shrub Hill.
It has been delayed at London Paddington and is now 43 minutes late.
This is due to a points failure.
13:16 Worcester Shrub Hill to London Paddington due 15:22 will be started from Oxford.
It will no longer call at Worcester Shrub Hill, Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury and Hanborough.
This is due to a points failure.
Last Updated:30/11/2023 12:02
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 10:54, 30th November 2023 | ![]() ![]() ![]() |
08:51 London Paddington to Great Malvern due 11:14 will be terminated at Worcester Foregate Street.
It will no longer call at Malvern Link and Great Malvern.
It is being delayed between London Paddington and Reading.
This is due to a points failure.
Last Updated:30/11/2023 09:29
09:54 Great Malvern to London Paddington due 12:22 will be started from Worcester Foregate Street.
It will no longer call at Great Malvern and Malvern Link.
This is due to a broken rail.
Last Updated:30/11/2023 08:20
11:57 Great Malvern to London Paddington due 14:22 will be started from Worcester Foregate Street.
It will no longer call at Great Malvern and Malvern Link.
This is due to a points failure.
Last Updated:30/11/2023 09:30
It will no longer call at Malvern Link and Great Malvern.
It is being delayed between London Paddington and Reading.
This is due to a points failure.
Last Updated:30/11/2023 09:29
09:54 Great Malvern to London Paddington due 12:22 will be started from Worcester Foregate Street.
It will no longer call at Great Malvern and Malvern Link.
This is due to a broken rail.
Last Updated:30/11/2023 08:20
11:57 Great Malvern to London Paddington due 14:22 will be started from Worcester Foregate Street.
It will no longer call at Great Malvern and Malvern Link.
This is due to a points failure.
Last Updated:30/11/2023 09:30
| Re: 2023 Delays and Cancellations Posted by Witham Bobby at 10:33, 30th November 2023 | ![]() ![]() ![]() |
16:32 Great Malvern to London Paddington due 19:29 will be reinstated.
It will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
It will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
Some reinstatement, this
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 06:34, 30th November 2023 | ![]() ![]() ![]() |
I think today is best described as "Shall we forget that happened?".
And today is not getting off to a good start. The stock for the 'halts' train (05:10 Oxford - Shrub Hill) gave up at Moreton "due to a problem with the train (M8)" according to RTT. And
07:01 Worcester Shrub Hill to Didcot Parkway due 08:45 will be cancelled.
This is due to a fault on this train.
Last Updated:30/11/2023 05:49
07:13 Great Malvern to London Paddington due 09:40 will call additionally at Shipton, Ascott-Under-Wychwood, Finstock and Combe.
This is due to the train making extra stops because a train was cancelled.
Last Updated:30/11/2023 06:10
17:34 London Paddington to Hereford due 20:26 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcester Foregate Street, Malvern Link, Great Malvern, Colwall, Ledbury and Hereford.
This is due to a shortage of train crew.
Last Updated:30/11/2023 03:36
20:52 London Paddington to Great Malvern due 23:14 will be cancelled.
This is due to a shortage of train crew.
Last Updated:30/11/2023 03:34
22:00 Hereford to Worcester Shrub Hill due 22:51 will be cancelled.
This is due to a shortage of train crew.
Last Updated:30/11/2023 03:36
This is due to a fault on this train.
Last Updated:30/11/2023 05:49
07:13 Great Malvern to London Paddington due 09:40 will call additionally at Shipton, Ascott-Under-Wychwood, Finstock and Combe.
This is due to the train making extra stops because a train was cancelled.
Last Updated:30/11/2023 06:10
17:34 London Paddington to Hereford due 20:26 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcester Foregate Street, Malvern Link, Great Malvern, Colwall, Ledbury and Hereford.
This is due to a shortage of train crew.
Last Updated:30/11/2023 03:36
20:52 London Paddington to Great Malvern due 23:14 will be cancelled.
This is due to a shortage of train crew.
Last Updated:30/11/2023 03:34
22:00 Hereford to Worcester Shrub Hill due 22:51 will be cancelled.
This is due to a shortage of train crew.
Last Updated:30/11/2023 03:36
| Re: 2023 Delays and Cancellations Posted by ChrisB at 19:57, 29th November 2023 | ![]() ![]() ![]() |
That problem is/was the same problem reported up thread - a pilot was on board each service needing to pass at red causing many delays & cancellations from at least midday through to at least 1700. We knew the halts train was going to be delayed when I left Oxford Information point at 1600.
| Re: 2023 Delays and Cancellations Posted by Richard Fairhurst at 19:01, 29th November 2023 | ![]() ![]() ![]() |
I think today is best described as "Shall we forget that happened?".
The evening halts train left Didcot about 20 minutes late due to awaiting a train manager on an incoming service. That put it right in front of the following IET (the 16.58 from Paddington).
The IET was allowed to overtake before Oxford, and went first out of Oxford at 1757 (14 late) - I was on that one. The halts train left Oxford at 1810. It then appears to have waited between Oxford and Wolvercot to allow the up IET to come through, and as I write is currently running 74 minutes late according to RTT.
Running the halts train, rather than putting extra stops on the IET, strikes me as an unusual choice but there you go.
To add to the fun, there appears to have been a signalling fault between Wolvercot and Charlbury in the early evening - at least one train was given permission to pass a signal on red, apparently.
| Re: 2023 Delays and Cancellations Posted by ChrisB at 11:51, 29th November 2023 | ![]() ![]() ![]() |
Thanks for the heads up on this one - it was clear when I checked a tad earlier!
Meeting someone off a now cancelled train & trying to postpone.
Hope tomorrow is a clear day!
| Re: 2023 Delays and Cancellations Posted by charles_uk at 11:41, 29th November 2023 | ![]() ![]() ![]() |
Alterations to services between Oxford and Worcester Shrub Hill
Due to a fault with the signalling system between Oxford and Worcester Shrub Hill all lines are blocked.
Train services running through these stations may be suspended. Disruption is expected until 14:00 29/11.
Last Updated:29/11/2023 11:31
Due to a fault with the signalling system between Oxford and Worcester Shrub Hill all lines are blocked.
Train services running through these stations may be suspended. Disruption is expected until 14:00 29/11.
Last Updated:29/11/2023 11:31
It's not immediately clear how disruptive this is going to be but JourneyCheck is flagging a number of services as "will be delayed at Oxford".
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 01:50, 29th November 2023 | ![]() ![]() ![]() |
'Halts' train (17:04 Didcot - Moreton and return) and 21:43 Paddington - Shrub Hill both ran normally yesterday.
Not sure when the 'cancelled' warnings were replaced by 'reinstated' messages on JourneyCheck.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 03:22, 28th November 2023 | ![]() ![]() ![]() |
Last night (Monday November 27), the 20:52 Paddington - Great Malvern was cancelled after Oxford with RTT reporting this as "due to disorder (VA)". That's the last train this week - subsequent ones are buses.
For today, JourneyCheck is reporting:
28/11/23 06:43 Worcester Shrub Hill to London Paddington due 08:43 will be started from Oxford.
This is due to the emergency services dealing with an incident near the railway yesterday.
Will be formed of 5 coaches instead of 9.
Last Updated:27/11/2023 22:43
17:04 Didcot Parkway to Moreton-In-Marsh due 18:10 will be cancelled.
This is due to a shortage of train crew.
Last Updated:28/11/2023 01:10
18:51 Evesham to Oxford due 19:50 will be cancelled.
This is due to a shortage of train crew.
Last Updated:28/11/2023 01:14
19:45 Great Malvern to London Paddington due 22:24 will be started from Oxford.
This is due to a shortage of train crew.
Last Updated:28/11/2023 02:27
21:53 London Paddington to Worcester Shrub Hill due 00:02 will be cancelled.
This is due to a shortage of train crew.
Last Updated:28/11/2023 02:31
This is due to the emergency services dealing with an incident near the railway yesterday.
Will be formed of 5 coaches instead of 9.
Last Updated:27/11/2023 22:43
17:04 Didcot Parkway to Moreton-In-Marsh due 18:10 will be cancelled.
This is due to a shortage of train crew.
Last Updated:28/11/2023 01:10
18:51 Evesham to Oxford due 19:50 will be cancelled.
This is due to a shortage of train crew.
Last Updated:28/11/2023 01:14
19:45 Great Malvern to London Paddington due 22:24 will be started from Oxford.
This is due to a shortage of train crew.
Last Updated:28/11/2023 02:27
21:53 London Paddington to Worcester Shrub Hill due 00:02 will be cancelled.
This is due to a shortage of train crew.
Last Updated:28/11/2023 02:31
This week, as a result of overnight engineering works, the 21:53 is diverting via Stroud (running non-stop from Didcot to Shrub Hill), whie the 22:51 to Worcestershire Parkway is terminating at Oxford.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 13:22, 21st November 2023 | ![]() ![]() ![]() |
It was a 9 vice 5 IET and so can’t fit within the turnback at Malvern Wells. So it would have to shunt onto the single line…but test train 1Q15 was going to be occupying that section.
Suddenly that makes much more sense - thank you!| Re: 2023 Delays and Cancellations Posted by ChrisB at 13:20, 21st November 2023 | ![]() ![]() ![]() |
This is due to more trains than usual needing repairs at the same time.
Is the base reason for substituting 9car vice 5car, not why it terminated short.
| Re: 2023 Delays and Cancellations Posted by IndustryInsider at 12:50, 21st November 2023 | ![]() ![]() ![]() |
It was a 9 vice 5 IET and so can’t fit within the turnback at Malvern Wells. So it would have to shunt onto the single line…but test train 1Q15 was going to be occupying that section.
| Re: 2023 Delays and Cancellations Posted by ChrisB at 12:18, 21st November 2023 | ![]() ![]() ![]() |
Maybe a travelling Hitachi fitter needed stationary time to fix a problem?
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 11:32, 21st November 2023 | ![]() ![]() ![]() |
And an odd pair of reasons for delays:
08:51 London Paddington to Great Malvern due 11:14 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcester Foregate Street, Malvern Link and Great Malvern.
This is due to more trains than usual needing repairs at the same time.
Last Updated:21/11/2023 10:44
11:57 Great Malvern to London Paddington due 14:22 will be started from Worcester Shrub Hill.
It will no longer call at Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to more trains than usual needing repairs at the same time.
Last Updated:21/11/2023 10:44
The 08:51 was on time to Shrub Hill.It will no longer call at Worcester Foregate Street, Malvern Link and Great Malvern.
This is due to more trains than usual needing repairs at the same time.
Last Updated:21/11/2023 10:44
11:57 Great Malvern to London Paddington due 14:22 will be started from Worcester Shrub Hill.
It will no longer call at Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to more trains than usual needing repairs at the same time.
Last Updated:21/11/2023 10:44
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 08:28, 21st November 2023 | ![]() ![]() ![]() |
From JourneyCheck:
06:43 Worcester Shrub Hill to London Paddington due 08:43 has been delayed at Worcester Shrub Hill and is now 24 minutes late.
This is due to a fault with the signalling system.
Last Updated:21/11/2023 07:59
This train (and the 07:25 Shrub Hill - Paddington via Stroud, also delayed) start from Shrub Hill sidings, so the fault seems to have only affected these sidings.This is due to a fault with the signalling system.
Last Updated:21/11/2023 07:59
The train was held at Charlbury for the single line (crossing the 06:50 Paddington - Great Malvern, on time), and is now reported as 33 late at Oxford.
Meanwhile, the 'halts' train, the 07:01 Shrub Hill - Didcot, is now at Charlbury, 17 late.
| Re: 2023 Delays and Cancellations Posted by ChrisB at 19:56, 18th November 2023 | ![]() ![]() ![]() |
No way to reinstate as the DfT has thrown the toys out & won't pay for the turbo used to run it. It's going elsewhere.
| Re: 2023 Delays and Cancellations Posted by ray951 at 19:54, 18th November 2023 | ![]() ![]() ![]() |
If reliability gets too bad, hopefully they'll move that Didcot stop to the other half-hour Oxford service, which frankly is where it should go anyway (yes, I have had the explanation as to why its in the Worcester service, but I don't agree with it)
Or just reinstate the Didcot to Oxford shuttle service to run every half an hour.
Of course if they hadn't cancelled the half-complete (maybe more) Didcot-Oxford electrification then none of this would have been happening.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 20:48, 17th November 2023 | ![]() ![]() ![]() |
5 late at Reading, right time Evesham
Who needs 125mph IETs anyway?
The rolling stock substitution has disappeared from GW journeycheck, btw
The idea of Retro Friday didn't actually work:
07:50 London Paddington to Great Malvern due 10:12.
Will be formed of 3 coaches instead of 5.
- worked OK.Will be formed of 3 coaches instead of 5.
10:59 Great Malvern to London Paddington due 13:24.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
RTT reports "This service was cancelled between Worcester Shrub Hill and London Paddington due to a planning error (TI)."Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
13:50 London Paddington to Great Malvern due 16:15.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
RTT reports "This service was cancelled due to a decision by the train operating company (TR)."Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
16:32 Great Malvern to London Paddington due 19:29 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:51
RTT reports "This service was cancelled due to late arrival of an inbound service (YI)."It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:51
| Re: 2023 Delays and Cancellations Posted by ChrisB at 19:58, 17th November 2023 | ![]() ![]() ![]() |
If reliability gets too bad, hopefully they'll move that Didcot stop to the other half-hour Oxford service, which frankly is where it should go anyway (yes, I have had the explanation as to why its in the Worcester service, but I don't agree with it)
| Re: 2023 Delays and Cancellations Posted by ray951 at 19:37, 17th November 2023 | ![]() ![]() ![]() |
Given the recent level of reliability of the Worcester line services its good that GWR haven't decided, from the December timetable change, to halve the number of services on the Didcot to Oxford shuttle and replace them by stopping the Worcester services at Didcot parkway instead.
Oh wait......
Given that when fares go up the standard line 'about paying for investments in services' is trotted out maybe we will see a reduction in fares to match the reduction in services.

| Re: 2023 Delays and Cancellations Posted by Richard Fairhurst at 17:37, 17th November 2023 | ![]() ![]() ![]() |
The GWR app is reporting that the following 14:53 Paddington to Worcester Foregate Street has no unoccupied seats!
I was on it from Oxford. Standing room only to Hanborough and very busy on to Charlbury. Haven't checked but it looks like maybe the Cotswold Line was down one diagram - there were cancellations either side too.
| Re: 2023 Delays and Cancellations Posted by Witham Bobby at 15:14, 17th November 2023 | ![]() ![]() ![]() |
I suppose cancelling a few services each day and ramming passengers onto the remaining trains is one way of making the railway less costly to run
| Re: 2023 Delays and Cancellations Posted by charles_uk at 14:59, 17th November 2023 | ![]() ![]() ![]() |
There is now...
13:50 London Paddington to Great Malvern due 16:15 will be cancelled.
This is due to train crew being delayed.
Last Updated:17/11/2023 11:58
This is due to train crew being delayed.
Last Updated:17/11/2023 11:58
The GWR app is reporting that the following 14:53 Paddington to Worcester Foregate Street has no unoccupied seats!
| Re: 2023 Delays and Cancellations Posted by charles_uk at 14:08, 17th November 2023 | ![]() ![]() ![]() |
15:23 London Paddington to Worcester Foregate Street due 17:47
Facilities on the 15:23 London Paddington to Worcester Foregate Street due 17:47.
This is due to a late running train being in front of this one.
This train will now be formed of the usual number of coaches.
Facilities on the 15:23 London Paddington to Worcester Foregate Street due 17:47.
This is due to a late running train being in front of this one.
This train will now be formed of the usual number of coaches.

| Re: 2023 Delays and Cancellations Posted by charles_uk at 12:34, 17th November 2023 | ![]() ![]() ![]() |
10:59 Great Malvern to London Paddington due 13:24 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to train crew being delayed.
Will be formed of 3 coaches instead of 5. Toilet facilities are not available.
Last Updated:17/11/2023 11:17
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to train crew being delayed.
Will be formed of 3 coaches instead of 5. Toilet facilities are not available.
Last Updated:17/11/2023 11:17
As reported above, the 1632 Great Malvern to Paddington isn't getting very far today - to be terminated at Worcester Shrub Hill. No mention on Journeycheck at present about the 1350 from Paddington which provides the stock for it
There is now...
13:50 London Paddington to Great Malvern due 16:15 will be cancelled.
This is due to train crew being delayed.
Last Updated:17/11/2023 11:58
This is due to train crew being delayed.
Last Updated:17/11/2023 11:58
| Re: 2023 Delays and Cancellations Posted by Witham Bobby at 11:29, 17th November 2023 | ![]() ![]() ![]() |
10:59 Great Malvern to London Paddington due 13:24 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to train crew being delayed.
Will be formed of 3 coaches instead of 5. Toilet facilities are not available.
Last Updated:17/11/2023 11:17
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to train crew being delayed.
Will be formed of 3 coaches instead of 5. Toilet facilities are not available.
Last Updated:17/11/2023 11:17
As reported above, the 1632 Great Malvern to Paddington isn't getting very far today - to be terminated at Worcester Shrub Hill. No mention on Journeycheck at present about the 1350 from Paddington which provides the stock for it
| Re: 2023 Delays and Cancellations Posted by Witham Bobby at 09:47, 17th November 2023 | ![]() ![]() ![]() |
And today is Retro Friday:
Shown on RTT as being operated by 165 114.
07:50 London Paddington to Great Malvern due 10:12.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
10:59 Great Malvern to London Paddington due 13:24.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
13:50 London Paddington to Great Malvern due 16:15.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
16:32 Great Malvern to London Paddington due 19:29 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:51
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
10:59 Great Malvern to London Paddington due 13:24.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
13:50 London Paddington to Great Malvern due 16:15.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
16:32 Great Malvern to London Paddington due 19:29 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:51
Shown on RTT as being operated by 165 114.
5 late at Reading, right time Evesham
Who needs 125mph IETs anyway?
The rolling stock substitution has disappeared from GW journeycheck, btw
| Re: 2023 Delays and Cancellations Posted by TaplowGreen at 09:20, 17th November 2023 | ![]() ![]() ![]() |
An equally unattractive prospect.
| Re: 2023 Delays and Cancellations Posted by grahame at 09:15, 17th November 2023 | ![]() ![]() ![]() |
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 08:48, 17th November 2023 | ![]() ![]() ![]() |
Worcestershire Parkway... is that a rather odd final call for it?
Shrub Hill is staffed by WMR and is closed and locked up before that train would arrive, so it terminates at Parkway and runs empty (and straight into) the sidings at Worcester.
So, not ideal…but there is a reason for it.
Ah. Now wondering what that service did before Parkway opened in 2020, if anyone can recall.
Mark
| Re: 2023 Delays and Cancellations Posted by TaplowGreen at 08:28, 17th November 2023 | ![]() ![]() ![]() |
And today is Retro Friday:
Shown on RTT as being operated by 165 114.
07:50 London Paddington to Great Malvern due 10:12.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
10:59 Great Malvern to London Paddington due 13:24.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
13:50 London Paddington to Great Malvern due 16:15.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
16:32 Great Malvern to London Paddington due 19:29 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:51
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
10:59 Great Malvern to London Paddington due 13:24.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
13:50 London Paddington to Great Malvern due 16:15.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
16:32 Great Malvern to London Paddington due 19:29 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:51
Shown on RTT as being operated by 165 114.
Two and a half hours on a Turbo, great!

| Re: 2023 Delays and Cancellations Posted by Mark A at 08:23, 17th November 2023 | ![]() ![]() ![]() |
Worcestershire Parkway... is that a rather odd final call for it?
Shrub Hill is staffed by WMR and is closed and locked up before that train would arrive, so it terminates at Parkway and runs empty (and straight into) the sidings at Worcester.
So, not ideal…but there is a reason for it.
Ah. Now wondering what that service did before Parkway opened in 2020, if anyone can recall.
Mark
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 04:38, 17th November 2023 | ![]() ![]() ![]() |
And today is Retro Friday:
07:50 London Paddington to Great Malvern due 10:12.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
10:59 Great Malvern to London Paddington due 13:24.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
13:50 London Paddington to Great Malvern due 16:15.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
16:32 Great Malvern to London Paddington due 19:29 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:51
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
10:59 Great Malvern to London Paddington due 13:24.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
13:50 London Paddington to Great Malvern due 16:15.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:50
16:32 Great Malvern to London Paddington due 19:29 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
Will be formed of 3 coaches instead of 5.
Last Updated:17/11/2023 03:51
Shown on RTT as being operated by 165 114.
| Re: 2023 Delays and Cancellations Posted by IndustryInsider at 21:59, 16th November 2023 | ![]() ![]() ![]() |
Worcestershire Parkway... is that a rather odd final call for it?
Shrub Hill is staffed by WMR and is closed and locked up before that train would arrive, so it terminates at Parkway and runs empty (and straight into) the sidings at Worcester.
So, not ideal…but there is a reason for it.
| Re: 2023 Delays and Cancellations Posted by Mark A at 20:25, 16th November 2023 | ![]() ![]() ![]() |
Worcestershire Parkway... is that a rather odd final call for it?
(Edit: removed bad info.)
Off topic, but I'm now moved, for reasons of history and anecdote, to look out the last arrival into Shrub Hill on a Sunday...
Mark
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 18:17, 16th November 2023 | ![]() ![]() ![]() |
There is a 22:51 from Paddington, but it only goes to Worcestershire Parkway, so you'd need to have a taxi to take you to our destination.
| Re: 2023 Delays and Cancellations Posted by Mark A at 18:03, 16th November 2023 | ![]() ![]() ![]() |
Meanwhile...
21:53 London Paddington to Worcester Shrub Hill due 00:02 will be cancelled.
This is due to a shortage of train crew.
Last Updated:16/11/2023 14:26
This is due to a shortage of train crew.
Last Updated:16/11/2023 14:26
Awkward as that's the last train of the day. There *is* a connection that leave two minutes earllier, but that's change Newport and Hereford, with a wait of over 90 minutes at Newport and over three hours at Hereford, giving an arrival next day at Worcester at after 6am. *Blinks*
Mark
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 15:59, 16th November 2023 | ![]() ![]() ![]() |
An odd pair today:
The second of those feels wrong - surely it should be started from Shrub Hill?
16:58 London Paddington to Great Malvern due 19:26 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcester Foregate Street, Malvern Link and Great Malvern.
This is due to a shortage of train crew.
Last Updated:16/11/2023 06:16
19:45 Great Malvern to London Paddington due 22:24 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
Last Updated:16/11/2023 06:16
It will no longer call at Worcester Foregate Street, Malvern Link and Great Malvern.
This is due to a shortage of train crew.
Last Updated:16/11/2023 06:16
19:45 Great Malvern to London Paddington due 22:24 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
Last Updated:16/11/2023 06:16
The second of those feels wrong - surely it should be started from Shrub Hill?
Both have now disappeared from JourneyCheck.
Meanwhile...
21:53 London Paddington to Worcester Shrub Hill due 00:02 will be cancelled.
This is due to a shortage of train crew.
Last Updated:16/11/2023 14:26
This is due to a shortage of train crew.
Last Updated:16/11/2023 14:26
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 10:28, 16th November 2023 | ![]() ![]() ![]() |
An odd pair today:
16:58 London Paddington to Great Malvern due 19:26 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcester Foregate Street, Malvern Link and Great Malvern.
This is due to a shortage of train crew.
Last Updated:16/11/2023 06:16
19:45 Great Malvern to London Paddington due 22:24 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
Last Updated:16/11/2023 06:16
It will no longer call at Worcester Foregate Street, Malvern Link and Great Malvern.
This is due to a shortage of train crew.
Last Updated:16/11/2023 06:16
19:45 Great Malvern to London Paddington due 22:24 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Reading and London Paddington.
This is due to a shortage of train crew.
Last Updated:16/11/2023 06:16
The second of those feels wrong - surely it should be started from Shrub Hill?
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 00:06, 16th November 2023 | ![]() ![]() ![]() |
And during the evening of Wednesday November 15:
The 'halts' train (17:04 Didcot - Moreton) was cancelled from Oxford (RTT: "due to a problem with the traction equipment (MD)").
The 16:58 Paddington - Great Malvern lost time as a result of doing all the extra stops, arrived at Shrub Hill 33 late and was cancelled thereafter.
The 17:34 London Paddington to Hereford missed its path through the single line at Evesham. It left there 30 late and reached Hereford 26 late.
The 19:05 Great Malvern to London Paddington was held at Charlbury and arrived at Oxford 18 late.
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 15:24, 15th November 2023 | ![]() ![]() ![]() |
RTT is reporting it arriving at Great Malvern 57 late, and being cancelled after that.
JourneyCheck reports
13:18 Hereford to London Paddington due 16:22 will be started from Great Malvern.
It will no longer call at Hereford, Ledbury and Colwall.
This is due to a fault on this train.
Last Updated:15/11/2023 11:52
It will no longer call at Hereford, Ledbury and Colwall.
This is due to a fault on this train.
Last Updated:15/11/2023 11:52
| Re: 2023 Delays and Cancellations Posted by Witham Bobby at 12:29, 15th November 2023 | ![]() ![]() ![]() |
09:52 London Paddington to Hereford due 12:46 is being delayed between Reading and Oxford and is now expected to be 25 minutes late.
This is due to a fault on this train.
Last Updated:15/11/2023 11:00
13:18 Hereford to London Paddington due 16:22 will be starting late from Hereford.
This is due to a fault on this train.
Last Updated:15/11/2023 11:05
This is due to a fault on this train.
Last Updated:15/11/2023 11:00
13:18 Hereford to London Paddington due 16:22 will be starting late from Hereford.
This is due to a fault on this train.
Last Updated:15/11/2023 11:05
09:52 held at Wolvercote Junction and now 38 late at Charlbury. A scheduled turn-round time at Hereford of 32 minutes.
Left Worcester Shrub Hill only 23 minutes late
| Re: 2023 Delays and Cancellations Posted by Worcester_Passenger at 11:49, 15th November 2023 | ![]() ![]() ![]() |
09:52 London Paddington to Hereford due 12:46 is being delayed between Reading and Oxford and is now expected to be 25 minutes late.
This is due to a fault on this train.
Last Updated:15/11/2023 11:00
13:18 Hereford to London Paddington due 16:22 will be starting late from Hereford.
This is due to a fault on this train.
Last Updated:15/11/2023 11:05
This is due to a fault on this train.
Last Updated:15/11/2023 11:00
13:18 Hereford to London Paddington due 16:22 will be starting late from Hereford.
This is due to a fault on this train.
Last Updated:15/11/2023 11:05
09:52 held at Wolvercote Junction and now 38 late at Charlbury. A scheduled turn-round time at Hereford of 32 minutes.