Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 13:55 29 Mar 2024
- Delays at Dover as millions begin Easter getaway
- Attempted murder charge after man stabbed on train
- KFC Nigeria sorry after disabled diner refused service
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
29th Mar (1913)
Foundation of National Union or Railwaymen (*)

Train RunningCancelled
12:30 London Paddington to Weston-Super-Mare
13:15 Swindon to Westbury
13:15 London Paddington to Cardiff Central
13:48 Bedwyn to Newbury
14:12 Newbury to Bedwyn
14:19 Westbury to Swindon
14:57 Bedwyn to Newbury
15:14 Swindon to Westbury
15:22 Newbury to Bedwyn
15:28 Weston-Super-Mare to London Paddington
15:50 Bedwyn to Newbury
15:54 Cardiff Central to London Paddington
16:15 Newbury to Bedwyn
16:23 Westbury to Swindon
16:55 Bedwyn to Newbury
17:36 Swindon to Westbury
18:37 Westbury to Swindon
20:13 Swindon to Westbury
21:16 Westbury to Swindon
22:30 Swindon to Westbury
Short Run
10:55 Paignton to London Paddington
12:35 London Paddington to Exeter St Davids
13:10 Gloucester to Weymouth
13:42 Exeter St Davids to London Paddington
13:46 Bristol Temple Meads to Warminster
13:55 Paignton to London Paddington
14:36 London Paddington to Paignton
15:42 Exeter St Davids to London Paddington
16:35 London Paddington to Plymouth
16:50 Plymouth to London Paddington
17:03 London Paddington to Penzance
17:36 London Paddington to Plymouth
18:03 London Paddington to Penzance
18:36 London Paddington to Plymouth
19:04 Paignton to London Paddington
20:03 London Paddington to Plymouth
21:04 London Paddington to Plymouth
Delayed
09:10 Penzance to London Paddington
10:04 London Paddington to Penzance
10:20 Penzance to London Paddington
11:03 London Paddington to Plymouth
12:03 London Paddington to Penzance
12:15 Penzance to London Paddington
13:03 London Paddington to Plymouth
13:15 Plymouth to London Paddington
13:50 London Paddington to Great Malvern
14:03 London Paddington to Penzance
14:15 Penzance to London Paddington
15:03 London Paddington to Penzance
15:15 Plymouth to London Paddington
16:03 London Paddington to Penzance
16:15 Penzance to London Paddington
etc
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 29, 2024, 14:08:04 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[153] 2024 - Service update and amendment log, Swindon <-> Westbury...
[97] Infrastructure problems in Thames Valley causing disruption el...
[53] Travel for free on the m2 metrobus - Bristol - 4,5,6 April 202...
[41] would you like your own LIVE train station departure board?
[38] West Wiltshire Bus Changes April 2024
[37] Reversing Beeching - bring heritage and freight lines into the...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: RAIB 2018 Annual Report  (Read 754 times)
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« on: April 30, 2019, 13:41:57 »

Makes for sobering reading: https://www.gov.uk/government/publications/raib-annual-report-published-2019/annual-report-for-2018

Speaking as somebody closely involved in the 1988 Clapham Accident, I find this part in particular very disappointing and concerning:

Quote
Corporate knowledge and organisational culture

The disastrous collision at Clapham Junction on 12 December 1988, in which 35 people died and 484 were injured, was a turning point in the history of Britain’s railways. The immediate cause of the accident was poor working practice by a signalling technician, and the subsequent public inquiry into the accident highlighted serious deficiencies in the management of safety, particularly around the design, modification, testing and commissioning of signalling systems. Putting in place the recommendations of the inquiry fundamentally changed several aspects of how the railway is run, and for signal engineers one of the most important was the approach to routine tasks, such as testing alterations to signalling installations. It was therefore concerning for RAIB (Rail Accident Investigation Branch) to discover, during our investigation of the collision at Waterloo in August 2017, that some of these important changes were not reflected in the way that signalling modifications were being undertaken.

Some of the people involved in the signalling work connected with upgrading Waterloo station and its approach tracks did not keep proper records of temporary works, or ensure that additional temporary wiring was shown on the design documents. Leaving that temporary wiring in place when it should have been removed led to a passenger train being diverted onto a blocked line and colliding with wagons. Compliance with the existing standards, developed since Clapham, would have provided the controls needed to stop temporary wiring being installed and used in the uncontrolled manner which resulted in this accident.

These symptoms of a deep-seated problem should give us all pause for thought. How can organisations ensure that lessons from events that happened outside the personal experience of present-day railway people are taught and retained? Compliance with a standard comes more naturally to people when they understand the purpose of the requirement, and the consequences that may arise from disregarding it.

We are recommending that Network Rail takes action to reinforce the attitudes and depth of understanding needed for signal designers, installers and testers to safely apply their technical skills and knowledge. This should include the establishment of processes to educate present and future staff about how and why the standards have been developed. It’s also important to equip our engineers and technicians with the cognitive and social skills that are needed to work safely, both by themselves and as part of a team.

I believe that this accident at Waterloo starkly demonstrates why the lessons of Clapham should never be forgotten.

The significant problem for the S&T (Signalling and Telegraph) industry today is that there are very few people left who have gone through that experience and understand the outcomes of bad working practices, and also having the skills to relay this to todays staff in an understandable, but direct manner.
« Last Edit: April 30, 2019, 21:49:58 by SandTEngineer » Logged
Celestial
Transport Scholar
Hero Member
******
Posts: 674


View Profile
« Reply #1 on: April 30, 2019, 21:47:20 »

Very sobering.  Wasn't there another very similar incident in Cardiff during the resignalling a couple of years ago which was just as concerning for the same reasons?
Logged
jamestheredengine
Transport Scholar
Hero Member
******
Posts: 301


View Profile
« Reply #2 on: May 01, 2019, 08:21:04 »

Very sobering.  Wasn't there another very similar incident in Cardiff during the resignalling a couple of years ago which was just as concerning for the same reasons?

I think you're thinking of this incident:
https://www.gov.uk/government/news/report-152017-serious-irregularity-at-cardiff-east-junction
Logged

Celestial
Transport Scholar
Hero Member
******
Posts: 674


View Profile
« Reply #3 on: May 01, 2019, 08:43:43 »

That's the one. Thank you.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page