I am travelling into London today and will be travelling back mid evening..
FGW▸ web site says there is minimal engineering work..
There appears to be a half hourly train going into London, and similar coming out...
...except for when I want to travel home..
there are departures at 18.44, 19.15, 19.44, 20.15.. all take about 40 minutes... As I would have expected today..
And then there is a big gap.. the next train is 20.37 which requires me to go to Reading and then get another train back to Maidenhead, but I assume a travel card from Maidenhead to London will not cover that..so I can't get that train.. and the next train after that is 21.15 which takes a whole hour to get back to maidenhead because of this...
21:24 Ealing Broadway <====
21:46 Southall <====
21:52 Hayes & Harlington
21:56 West Drayton
22:01 Langley (Berks)
22:06 Slough
22:10 Burnham (Bucks)
.. a whole 22 minutes to do the usual 5-10 min journey between Ealing Broadway and Slough..
After that it gets back to the half hour timetable of earlier in the evening (21.44, 22.15 etc)..
I just wondered if anyone knew if there was a reason for this? Or if in fact the National rail journey planner is wrong?
Thank you
