....how about this for a new
FGW▸ slogan...."every day, another delay"!!!

It is begining to look rather like that !
Many of the delays are not actually the fault of FGW, but that is of little interest to those being routinely and significantly delayed.
In another thread, someone complained about the delay in obtaining buses for substitute road transport, and a respected member pointed out that it was unreasonable to have a fleet of buses on standby "just in case"
Over the last few months, a fleet of buses if available would probably have seen regular use ! Rain, snow, overunning engineering work, more snow, new signalling does not work, more rain, old signalling does not work, derailed freight train, another signalling failure and so on.
And looking to the future, we have electrifaction to look foward to, no trains in windy weather as the wires will come down and/or be struck by wind blown debris.
And new signalling, which has caused problems in the past.
And new trains with more to go wrong !