Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 14:55 01 May 2025
 
- Snake halts Japanese bullet trains after wrapping around power line
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 05/05/25 - Walk to Pilning
10/05/25 - BRTA Westbury
10/05/25 - Model Railway Show, Calne
13/05/25 - Melksham TUG / AGM

On this day
1st May (1964)
Helicopter service from Penzance to Scilly Isles starts (link)

Train RunningCancelled
13:10 Gloucester to Weymouth
13:29 Gatwick Airport to Reading
13:57 Exmouth to Paignton
13:59 Gatwick Airport to Reading
14:23 London Paddington to Oxford
14:55 London Paddington to Heathrow Terminal 5
14:57 Heathrow Terminal 5 to London Paddington
15:03 Oxford to London Paddington
15:04 Bristol Temple Meads to Filton Abbey Wood
15:12 Westbury to Warminster
15:21 Reading to Gatwick Airport
15:25 London Paddington to Heathrow Terminal 5
15:27 Heathrow Terminal 5 to London Paddington
15:30 Warminster to Bristol Temple Meads
15:51 Filton Abbey Wood to Bristol Temple Meads
15:55 London Paddington to Heathrow Terminal 5
15:57 Heathrow Terminal 5 to London Paddington
16:00 Cardiff Central to Taunton
16:00 Oxford to London Paddington
16:27 Heathrow Terminal 5 to London Paddington
16:59 Gatwick Airport to Reading
17:00 Oxford to London Paddington
18:54 Reading to Gatwick Airport
20:29 Gatwick Airport to Reading
Short Run
12:30 London Paddington to Weston-Super-Mare
13:03 London Paddington to Plymouth
13:11 Taunton to Cardiff Central
13:15 London Paddington to Cardiff Central
14:08 London Paddington to Didcot Parkway
14:32 Exeter Central to Okehampton
14:38 London Paddington to Didcot Parkway
16:50 Plymouth to London Paddington
17:30 London Paddington to Taunton
Delayed
12:51 London Paddington to Worcester Foregate Street
14:02 Oxford to London Paddington
14:06 London Paddington to Newbury
14:15 Didcot Parkway to London Paddington
14:30 Bristol Temple Meads to London Paddington
14:34 Didcot Parkway to Banbury
14:48 London Paddington to Swansea
15:30 Banbury to Didcot Parkway
15:34 Oxford to Didcot Parkway
16:07 Didcot Parkway to Oxford
16:18 London Paddington to Carmarthen
16:35 Didcot Parkway to Banbury
16:35 Oxford to Didcot Parkway
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 01, 2025, 15:10:39 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[102] Steam excursion - except there's much more diesel than steam!
[101] Brighton Belle - merged topics
[87] Cash payments for transport services
[84] "Save the Last Remaining British Rail Hovercraft from Destruct...
[41] May Timetable Change
[40] Longer distance canal walks - public transport for one way sec...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 3 [4]
  Print  
Author Topic: Electrification beyond Newbury - study results  (Read 54842 times)
ChrisB
Transport Scholar
Hero Member
******
Posts: 13350


View Profile Email
« Reply #45 on: June 24, 2013, 15:39:32 »

Agreed - but it would need to get over 2 before DfT» (Department for Transport - about) would even begin to look at it - and with the cost of an additional set not being covered by the additional fares (and extra turns which themselves would cost money to run), I doubt you'd get that high.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10456


View Profile
« Reply #46 on: June 24, 2013, 15:47:11 »

You may well be right - but it would have made far more sense to do the study based on that potential service (or at least include that as an extra option), rather than the existing service, which would always give a terrible figure and was a waste of money to even commission.  The figures for the other two options (on to the quarry and Batheaston Junction) would also have been much better.  Which is pretty much the point made in the original post.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Southern Stag
Hero Member
*****
Posts: 984


View Profile
« Reply #47 on: June 24, 2013, 15:55:44 »

Agreed - but it would need to get over 2 before DfT» (Department for Transport - about) would even begin to look at it - and with the cost of an additional set not being covered by the additional fares (and extra turns which themselves would cost money to run), I doubt you'd get that high.
But it's not just the BCR (Benefit Cost Ratio) of extending London-Bedwyn services to Westbury that would be looked at, it's the BCR of the whole electrification scheme. The main cost is going to be electrification itself rather than providing one extra train. If the cost was justified to Bedwyn with a BCR of 2.58 then Westbury may well have a pretty similar BCR with a pretty similar level of service.
Logged
bobm
Administrator
Hero Member
*****
Posts: 10240



View Profile
« Reply #48 on: February 06, 2014, 12:26:08 »

From FGW (First Great Western) website

Quote
First Great Western welcome calls to extend electrification to Bedwyn
Wednesday 5th February 2014
First Great Western has welcomed calls to extend the electrification of the mainline beyond Newbury to Bedwyn, when the line is electrified in 2016.

The comments, from FGW Manager Director Mark Hopwood, come after a meeting between local MPs (Member of Parliament, or Mile Post (a method of measuring the railway in miles and chains from a starting point - usually London), depending on context) and the Rail Minister Stephen Hammond.

Mark said: ^The Government^s commitment to invest in the rail network and in new trains is an essential piece of the jigsaw in improving passenger journeys, and reliability, across our network.

^The extension of electrification as far as Bedwyn during the initial first phase, and prior to the 2019-2024 period, makes good economic sense ^ supporting the communities we serve by delivering another revolution in passenger travel.^

Claire Perry MP for Devizes and Richard Benyon MP for Newbury met with the Rail Minister, Stephen Hammond MP to put the case for bringing forward rail electrification to Bedwyn so that the project simply continues to Bedwyn when it reaches Newbury in 2016.

The 2013 Arup Review showed that there is a very strong business case for extending electrification to Bedwyn, but the MPs had been informed that the investment required was unlikely to be available in the 2014-2019 period, and therefore the Newbury to Bedwyn Project would be considered for the 2019-2024 period.

Claire Perry MP said: ^The Minister agreed that there are very strong economic and operational reasons for the Newbury-Bedwyn project to be brought forward and the opportunity will now be discussed in more detail with Network Rail. Richard Benyon and I are determined to ensure that the numbers of through trains and the frequency of services at Bedwyn, Hungerford and Kintbury Stations are secured.^
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 3 [4]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page