The Telegraph article suggests 1% sugar added to the mix can prevent setting, so (if my sums are correct), about 24 kilos per cubic metre of concrete (at 2.4 tonnes per cubic metre) needs to be added.
Might empty a couple of small shops of their normal stock, but probably not an impossible amount to get hold of. I'd have thought the biggest problem was making sure it was properly mixed...

Paul