Whilst I would welcome a footbridge of any sort being reinstated at Pilning,I do have concerns about platform two failing to meet PTI regs since the masts have been installed.
PTI = Platform Train Interface,just in case anyone isn't aware
Good point but not terminal if there's a will (which, frankly, I doubt).
The mid platform overhead support does foul the platform edge - not sure if it's as bad as a few other stations though. There is space for a shortened 3 carriage platform forward of there, with the overhead support in the middle of that section spanning the third track too. So it would be longer than Dilton Marsh, longer than Avoncliff, and I suspect longer than the useable section at Saltash.

Configuation of footbridge as follows - as you walk up to the station headed for Wales, up the slope, over the line then down the slope between the platform and the loop which are well apart. Psychologically attractive - no feelings on walking in circles as you do at Ashchurch or Jersey Sidings!