Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 14:35 01 May 2025
 
- Snake halts Japanese bullet trains after wrapping around power line
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 05/05/25 - Walk to Pilning
10/05/25 - BRTA Westbury
10/05/25 - Model Railway Show, Calne
13/05/25 - Melksham TUG / AGM

On this day
1st May (1971)
Amtrak founded (*)

Train RunningCancelled
13:10 Gloucester to Weymouth
13:29 Gatwick Airport to Reading
13:46 Bristol Temple Meads to Warminster
13:57 Exmouth to Paignton
13:59 Gatwick Airport to Reading
14:23 London Paddington to Oxford
14:25 London Paddington to Heathrow Terminal 5
14:27 Heathrow Terminal 5 to London Paddington
14:55 London Paddington to Heathrow Terminal 5
14:57 Heathrow Terminal 5 to London Paddington
15:03 Oxford to London Paddington
15:04 Bristol Temple Meads to Filton Abbey Wood
15:12 Westbury to Warminster
15:25 London Paddington to Heathrow Terminal 5
15:27 Heathrow Terminal 5 to London Paddington
15:30 Warminster to Bristol Temple Meads
15:51 Filton Abbey Wood to Bristol Temple Meads
15:55 London Paddington to Heathrow Terminal 5
15:57 Heathrow Terminal 5 to London Paddington
16:00 Cardiff Central to Taunton
16:27 Heathrow Terminal 5 to London Paddington
Short Run
12:30 London Paddington to Weston-Super-Mare
12:50 Cardiff Central to London Paddington
13:03 London Paddington to Plymouth
13:11 Taunton to Cardiff Central
13:15 London Paddington to Cardiff Central
13:38 London Paddington to Didcot Parkway
14:08 London Paddington to Didcot Parkway
14:32 Exeter Central to Okehampton
14:38 London Paddington to Didcot Parkway
16:50 Plymouth to London Paddington
17:30 London Paddington to Taunton
Delayed
11:03 London Paddington to Plymouth
12:51 London Paddington to Worcester Foregate Street
14:02 Oxford to London Paddington
14:06 London Paddington to Newbury
14:15 Didcot Parkway to London Paddington
14:48 London Paddington to Swansea
15:28 Weston-Super-Mare to London Paddington
15:30 Banbury to Didcot Parkway
15:34 Oxford to Didcot Parkway
16:07 Didcot Parkway to Oxford
16:35 Didcot Parkway to Banbury
16:35 Oxford to Didcot Parkway
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 01, 2025, 14:53:24 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[102] Steam excursion - except there's much more diesel than steam!
[101] Brighton Belle - merged topics
[87] Cash payments for transport services
[84] "Save the Last Remaining British Rail Hovercraft from Destruct...
[41] May Timetable Change
[40] Longer distance canal walks - public transport for one way sec...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 88 89 [90] 91 92 ... 176
  Print  
Author Topic: Great Western Main Line electrification - ongoing discussion  (Read 1217799 times)
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #1335 on: November 09, 2015, 17:28:02 »

'Bathness: the quality or characteristic of the city of Bath; pertaining to honeyed stone and well-fed tourists, etc.'  Cheesy

That sound like pretty good translation of the French "Aixence", then.
Presumably that's from Aix-en-Provence rather than (what once was) Aix-la-Chapelle? Though I don't know either of the places, so maybe not.
Logged

Waiting at Pilning for the midnight sleeper to Prague.
Rhydgaled
Hero Member
*****
Posts: 1500


View Profile WWW
« Reply #1336 on: November 09, 2015, 19:03:19 »

Something for NR» (Network Rail - home page) to learn from the unfortunate situation could be explanation to residents in more detail about what will happen, how it will look and why it will be like that, in addition to the normal stuff about bridge closure dates and so on.
And prefrably produce, in advance of starting any work, come up with a list of plausable designs and present them to the public and let the public decided which design is least obtrusive and then implement using the chossen design.
Logged

----------------------------
Don't DOO (Driver-Only Operation (that is, trains which operate without carrying a guard)) it, keep the guard (but it probably wouldn't be a bad idea if the driver unlocked the doors on arrival at calling points).
stuving
Transport Scholar
Hero Member
******
Posts: 7429


View Profile
« Reply #1337 on: November 09, 2015, 19:51:06 »

'Bathness: the quality or characteristic of the city of Bath; pertaining to honeyed stone and well-fed tourists, etc.'  Cheesy

That sound like pretty good translation of the French "Aixence", then.
Presumably that's from Aix-en-Provence rather than (what once was) Aix-la-Chapelle? Though I don't know either of the places, so maybe not.

Yes, Aix-en-Provence is exactly the kind of place that feels like it has been rich since Roman times. I thought of it as a cross between Cambridge and Edinburgh, but with longer history - Bath (which I don't know except as a place not to drive through) might be as good a comparison. I was surprised to find that Bury St Edmunds has a similar feel, though fewer grand buildings.

I did once go to Aachen, ages ago, and all I can remember was being served beer in a 150 ml glass: smaller than the bar's wine glasses and smaller even than a Cologne glass (no, it's for K^lsch).

But that's enough digressing for now, isn't it?
Logged
JayMac
Data Manager
Hero Member
******
Posts: 19310



View Profile
« Reply #1338 on: November 09, 2015, 20:27:39 »

Something for NR» (Network Rail - home page) to learn from the unfortunate situation could be explanation to residents in more detail about what will happen, how it will look and why it will be like that, in addition to the normal stuff about bridge closure dates and so on.
And prefrably produce, in advance of starting any work, come up with a list of plausable designs and present them to the public and let the public decided which design is least obtrusive and then implement using the chossen design.

Wheras I'd be telling the moaning Nimbys to do one. Network Rail don't need to be pandering to them. It's railway land. Put up what makes sense for cost and engineering.
Logged

"Good news for regular users of Euston Station in London! One day they will die. Then they won't have to go to Euston Station ever again." - David Mitchell
TonyK
Global Moderator
Hero Member
*****
Posts: 6643


The artist formerly known as Four Track, Now!


View Profile
« Reply #1339 on: November 09, 2015, 23:37:20 »


I have no idea about the trains capability, but I have to pull you up on your na^ve assumption that German engineering is the best.  Seems like the train performed fabulously when under test in Germany, but in the real world its performance is not so good.  We certainly haven't heard of something like that happening to German technology have we??

What, the Four Sprung Duck Technique isn't all it's cracked up to be? I've read that HOPS performs well in emissions tests too.
Logged

Now, please!
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #1340 on: November 09, 2015, 23:44:23 »

Something for NR» (Network Rail - home page) to learn from the unfortunate situation could be explanation to residents in more detail about what will happen, how it will look and why it will be like that, in addition to the normal stuff about bridge closure dates and so on.
And prefrably produce, in advance of starting any work, come up with a list of plausable designs and present them to the public and let the public decided which design is least obtrusive and then implement using the chossen design.
If all designs are equally 'plausible' in engineering and cost terms and it's purely an aesthetic choice, then maybe. It seems unlikely that different designs would be absolute equivalent in those terms, though.
Logged

Waiting at Pilning for the midnight sleeper to Prague.
Rhydgaled
Hero Member
*****
Posts: 1500


View Profile WWW
« Reply #1341 on: November 10, 2015, 08:24:46 »

Something for NR» (Network Rail - home page) to learn from the unfortunate situation could be explanation to residents in more detail about what will happen, how it will look and why it will be like that, in addition to the normal stuff about bridge closure dates and so on.
And prefrably produce, in advance of starting any work, come up with a list of plausable designs and present them to the public and let the public decided which design is least obtrusive and then implement using the chossen design.
If all designs are equally 'plausible' in engineering and cost terms and it's purely an aesthetic choice, then maybe. It seems unlikely that different designs would be absolute equivalent in those terms, though
Well yes, the costs won't be identical but there's quite a few different designs of electrification mast out there on railways around the world, so they can't be massively more expensive, and some of them are significantly less intrusive than others. If there really is a chance (doubtful I know) that Network Rail will replace structures following the complains it surely would have been better (and cheaper) to design something non-intrusive in the first place. A "retrospective public consultation" is just plain stupid, do your public consultation before you start building stuff.

Wheras I'd be telling the moaning Nimbys to do one. Network Rail don't need to be pandering to them. It's railway land. Put up what makes sense for cost and engineering.
I cannot agree with you about telling to NIMBYs to get lost, if I did I would be liable to be accused of double standards. I'm strongly opposed to swamping listed stations like Cardiff Central and Bristol Temple Meads with new modern architecture (lots of glass and steel, generally). In the case of the former, there's even the possibilty that the platform canopies and much of the main station building would be demolished. I am in favor of some work at Cardiff Central and I appreciate the need to increase the passenger capacity of the station, but I don't consider any of the artist's impressions released so far to be an acceptable way to treat GWR (Great Western Railway) architecture. I really hope that there will be a meaningful public consultation before any work starts, so that pepole like me can work with the railway to come up with a design which delivers the necessary improvements without trashing the attractive vista of the station. Consulting after the work has been carried out would be rather fruitless, and would be grounds for complaint.

Going back to OHLE (Over-Head Line Equipment (electrification via catenary)), my main point is that there appear to be multiple designs which make sense from cost and engineering, given that a variety of designs have been implemented. It would seem sensible to have involved the locals at an early stage, to try and avoid the suituation we apparently have now with NIMBYs moaning when it really is too late for NR to realisticly do anything. Regarding any structures already errected, I would probably tell the NIMBYs 'sorry, too late to do anything about it now' but that sort of thing doesn't really go down well and it would be better not to get into the suituation of having to say that.
Logged

----------------------------
Don't DOO (Driver-Only Operation (that is, trains which operate without carrying a guard)) it, keep the guard (but it probably wouldn't be a bad idea if the driver unlocked the doors on arrival at calling points).
Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #1342 on: November 10, 2015, 10:21:09 »

'Bathness: the quality or characteristic of the city of Bath; pertaining to honeyed stone and well-fed tourists, etc.'  Cheesy

That sound like pretty good translation of the French "Aixence", then.
Presumably that's from Aix-en-Provence rather than (what once was) Aix-la-Chapelle? Though I don't know either of the places, so maybe not.

Bath is twinned with Aix-en-Provence
Logged
Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #1343 on: November 10, 2015, 10:28:29 »



Wheras I'd be telling the moaning Nimbys to do one. Network Rail don't need to be pandering to them. It's railway land. Put up what makes sense for cost and engineering.


Absolutely true and I'd be inclined to agree.  I do point out though that good design is about form and function and that some of the OLE (Overhead Line Equipment, more often "OHLE") by that definition is badly designed.  That is a shame.  Network Rail shouldn't be pandering to Nimbys.  It SHOULD be insisting on top quality design work though.  The inelegance of some of the OLE suggests that this was not a top quality design job (as do the delays btw) and that is not just about aesthetics, bad design also shows up in the lack of unity between the different elements and the waste of steel in having masts higher than they need to be.   
Logged
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #1344 on: November 10, 2015, 10:29:58 »

'Bathness: the quality or characteristic of the city of Bath; pertaining to honeyed stone and well-fed tourists, etc.'  Cheesy

That sound like pretty good translation of the French "Aixence", then.
Presumably that's from Aix-en-Provence rather than (what once was) Aix-la-Chapelle? Though I don't know either of the places, so maybe not.

Bath is twinned with Aix-en-Provence
The denarius drops!  Roll Eyes Thanks, Tim.
Logged

Waiting at Pilning for the midnight sleeper to Prague.
clevertrousers
Newbie
*
Posts: 1


View Profile
« Reply #1345 on: November 10, 2015, 11:53:29 »

Hope this is the right place to post this news but spotted a Class 800 IEP (Intercity Express Program / Project. This will offer more capacity on routes, save money, give a consistent and safe service and meet customer requirements. Intended to replace HSTs.) at North Pole on the way into Paddington this morning - nice and shiny looking. A bit of progress on this part of the Project at least...
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10456


View Profile
« Reply #1346 on: November 10, 2015, 12:15:21 »

Welcome to the forum.

Yes, it's being used to test facilities within the new depot and also to test the cab layout is optimised for the various shapes and sizes of staff that will be sitting in the drivers seat.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
paul7575
Transport Scholar
Hero Member
******
Posts: 5347


View Profile
« Reply #1347 on: November 10, 2015, 12:25:24 »

On a Reading to Paddington service yesterday I saw quite a number of TTCs on the reliefs east of Maidenhead (possibly a majority) with the insulators fitted, will we see some wires before the end of the year?

Paul
Logged
Red Squirrel
Administrator
Hero Member
*****
Posts: 5503


There are some who call me... Tim


View Profile
« Reply #1348 on: November 10, 2015, 12:30:44 »


...Going back to OHLE (Over-Head Line Equipment (electrification via catenary)), my main point is that there appear to be multiple designs which make sense from cost and engineering, given that a variety of designs have been implemented. It would seem sensible to have involved the locals at an early stage, to try and avoid the suituation we apparently have now with NIMBYs moaning when it really is too late for NR» (Network Rail - home page) to realisticly do anything. Regarding any structures already errected, I would probably tell the NIMBYs 'sorry, too late to do anything about it now' but that sort of thing doesn't really go down well and it would be better not to get into the suituation of having to say that.

OHLE doesn't have to be fugly - like everything else, it's a choice:

Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
broadgage
Transport Scholar
Hero Member
******
Posts: 5680



View Profile
« Reply #1349 on: November 10, 2015, 13:10:55 »

Yes, but that picture is of tramway overhead. Inherently less obtrusive and of a lighter design since it would be only 550 volts not 25,000 volts. Much smaller clearances and shorter insulators, and also a much simpler design on account of the low speeds.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 88 89 [90] 91 92 ... 176
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page