Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 13:55 15 Jun 2025
 
* UK sending more RAF jets to Middle East
- Seven people killed in India helicopter crash
* Man seriously hurt in airport car park incident
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/06/25 - Rail Live 2025
24/06/25 - GWR Community Rail Conf
26/06/25 - TWNW conference
05/07/25 - Railfuture AGM

On this day
15th Jun (2018)
GWR Community Rail conference at Swindon (link)

Train RunningCancelled
15/06/25 10:50 Penzance to Exeter St Davids
15/06/25 12:55 Bristol Parkway to London Paddington
15/06/25 13:12 Worcester Foregate Street to London Paddington
13:49 Penzance to Exeter St Davids
15/06/25 13:51 Liskeard to Looe
13:55 Bristol Parkway to London Paddington
14:30 London Paddington to Bristol Temple Meads
15/06/25 14:33 Looe to Liskeard
15/06/25 14:54 Paignton to London Paddington
15:12 Liskeard to Looe
15:30 London Paddington to Bristol Temple Meads
15:41 Bristol Temple Meads to Salisbury
15:44 Looe to Liskeard
15:45 London Paddington to Bristol Parkway
16:00 Bristol Temple Meads to London Paddington
16:25 Liskeard to Looe
15/06/25 16:27 Exeter St Davids to Penzance
17:04 Looe to Liskeard
17:09 Portsmouth Harbour to Bristol Parkway
17:33 London Paddington to Cheltenham Spa
17:44 Swindon to Salisbury
17:55 Liskeard to Looe
17:59 Salisbury to Bristol Temple Meads
18:36 London Paddington to Plymouth
18:45 Looe to Liskeard
18:45 London Paddington to Bristol Parkway
18:55 Bristol Temple Meads to Taunton
19:09 Portsmouth Harbour to Bristol Parkway
19:40 Gloucester to Bristol Temple Meads
19:59 Salisbury to Bristol Temple Meads
20:00 Cheltenham Spa to Swindon
20:15 Liskeard to Looe
20:16 Taunton to Bristol Temple Meads
20:26 Exeter St Davids to Bristol Temple Meads
20:49 Looe to Liskeard
20:53 Bristol Temple Meads to Taunton
21:45 London Paddington to Bristol Parkway
21:54 Worcester Shrub Hill to Bristol Temple Meads
Short Run
11:49 Penzance to Exeter St Davids
13:03 London Paddington to Plymouth
13:14 Exeter Central to Barnstaple
13:32 Swindon to Weymouth
14:05 Frome to Swindon
14:26 Gatwick Airport to Reading
15:27 Exeter St Davids to Penzance
16:03 London Paddington to Penzance
16:05 Weymouth to Bristol Temple Meads
16:43 Frome to Swindon
17:08 Exeter St Davids to Penzance
17:13 London Paddington to Swindon
18:40 Bristol Temple Meads to Portsmouth Harbour
18:50 Swindon to London Paddington
19:38 Bristol Temple Meads to Worcester Shrub Hill
Delayed
11:03 London Paddington to Newquay
12:18 Penzance to London Paddington
etc
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
June 15, 2025, 14:08:09 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[139] Weymouth - Westbury cancellations, 14 and 15 June 2025
[88] Looe Branch Line - timetables, cancellations, engineering work...
[76] European Passengers Federation - 13th and 14th June 2025
[61] Bus Service 205
[41] Gone to the dogs? A look at greyhound racing's future - June 2...
[39] Storing petrol
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 10 11 [12]
  Print  
Author Topic: Gloucester - station, facilities, services, events & incidents (merged posts)  (Read 166432 times)
infoman
Hero Member
*****
Posts: 1549


View Profile
« Reply #165 on: June 17, 2023, 04:46:33 »

if you get stuck over the summer again on saturdays and sundays this might be of some interest

https://www.gloucestershirecommunityrail.org/slimbridge-shuttle
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4550


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #166 on: June 17, 2023, 07:45:51 »

Loss of signalling control and indicators at Gloucester Panel due to blown fuse. Replacement fuse also blew. Severe wire degradation discovered. Currently (0700) no route setting available in and out of Gloucester. Only route available is north/south on the main line avoiding Gloucester.

Would it be an overreaction to find this extremely worrying? ‘Degraded wires’ suggests the possibility of false indications, as happened at Clapham all those years ago…
The Clapham accident was not due to "degraded" wiring, the cause was due to the "electricians PVC insulation tape" used to hold a disconnected wire taken off of a "jam jar" relay as part of a re-signalling project, this wire dropped down and came into contact with the exposed terminals on the top of a "jam jar" relay.

Degraded wiring in signalling equipment is a known issue and the risks are known, the signal maintainers have specific plans in place for the regular non disturbance checks on the equipment
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Henry
Hero Member
*****
Posts: 369


View Profile
« Reply #167 on: June 17, 2023, 08:08:20 »


 Perhaps you could argue that the current signalling system is 'not fit for purpose'.
 
  I'm sure that with all the modern technology their must be a more efficient way to
  manage the safe movement of trains ?

 
Logged
Red Squirrel
Administrator
Hero Member
*****
Posts: 5527


There are some who call me... Tim


View Profile
« Reply #168 on: June 17, 2023, 09:19:12 »

Loss of signalling control and indicators at Gloucester Panel due to blown fuse. Replacement fuse also blew. Severe wire degradation discovered. Currently (0700) no route setting available in and out of Gloucester. Only route available is north/south on the main line avoiding Gloucester.

Would it be an overreaction to find this extremely worrying? ‘Degraded wires’ suggests the possibility of false indications, as happened at Clapham all those years ago…
The Clapham accident was not due to "degraded" wiring, the cause was due to the "electricians PVC insulation tape" used to hold a disconnected wire taken off of a "jam jar" relay as part of a re-signalling project, this wire dropped down and came into contact with the exposed terminals on the top of a "jam jar" relay.

Degraded wiring in signalling equipment is a known issue and the risks are known, the signal maintainers have specific plans in place for the regular non disturbance checks on the equipment

That’s reassuring. I have read the Clapham report, and understand the circumstances of the signalling fault that led to it.

So do we think this ‘problem’ in Gloucester might have been a failed non-disturbance test?
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
Electric train
Transport Scholar
Hero Member
******
Posts: 4550


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #169 on: June 18, 2023, 06:42:39 »

Loss of signalling control and indicators at Gloucester Panel due to blown fuse. Replacement fuse also blew. Severe wire degradation discovered. Currently (0700) no route setting available in and out of Gloucester. Only route available is north/south on the main line avoiding Gloucester.

Would it be an overreaction to find this extremely worrying? ‘Degraded wires’ suggests the possibility of false indications, as happened at Clapham all those years ago…
The Clapham accident was not due to "degraded" wiring, the cause was due to the "electricians PVC insulation tape" used to hold a disconnected wire taken off of a "jam jar" relay as part of a re-signalling project, this wire dropped down and came into contact with the exposed terminals on the top of a "jam jar" relay.

Degraded wiring in signalling equipment is a known issue and the risks are known, the signal maintainers have specific plans in place for the regular non disturbance checks on the equipment

That’s reassuring. I have read the Clapham report, and understand the circumstances of the signalling fault that led to it.

So do we think this ‘problem’ in Gloucester might have been a failed non-disturbance test?

Degraded insulation has a higher risk of a fault.

It may not have been an insulation failure that lead to the fuse blowing; the degraded insulation could have impacted on how a failed item that blew the fuse was replaced
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
froome
Transport Scholar
Hero Member
******
Posts: 1011


View Profile Email
« Reply #170 on: June 18, 2023, 09:56:06 »


 Spent a 'delightful'  3hrs 15mins at Cam and Dursley this morning. 
 
 No sign of the 'Great Experience Makers'  GWR (Great Western Railway) brag about.
 Watching both XC (Cross Country Trains (franchise)) and GWR flying through, (perhaps a special stop order might have been appropriate).
 So my thanks to the local passengers who kept my declining spirits up.

On that day, I was on a local train from Oldfield Park travelling to Temple Meads. This was a service which was due to go to Gloucester, and the announcement on the train was that it would terminate at Bristol Parkway, and "would not be calling at Yate and Gloucester", which i found intriguing as they didn't even mention Cam and Dursley!
Logged
grahame
Administrator
Hero Member
*****
Posts: 44239



View Profile WWW Email
« Reply #171 on: June 18, 2023, 10:08:46 »

On that day, I was on a local train from Oldfield Park travelling to Temple Meads. This was a service which was due to go to Gloucester, and the announcement on the train was that it would terminate at Bristol Parkway, and "would not be calling at Yate and Gloucester", which i found intriguing as they didn't even mention Cam and Dursley!

Cam and Dursley has only about a half of the service of Yate as I understand it. So perhaps it wasn't scheduled to call?  I also understand that bus links to that station are "less than ideal".  Not the only station around where one feels that more trains calling might make a huge difference, although thankful for the improvements at many in May.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
froome
Transport Scholar
Hero Member
******
Posts: 1011


View Profile Email
« Reply #172 on: June 18, 2023, 20:28:16 »

On that day, I was on a local train from Oldfield Park travelling to Temple Meads. This was a service which was due to go to Gloucester, and the announcement on the train was that it would terminate at Bristol Parkway, and "would not be calling at Yate and Gloucester", which i found intriguing as they didn't even mention Cam and Dursley!

Cam and Dursley has only about a half of the service of Yate as I understand it. So perhaps it wasn't scheduled to call?  I also understand that bus links to that station are "less than ideal".  Not the only station around where one feels that more trains calling might make a huge difference, although thankful for the improvements at many in May.

Ah, I hadn't realised that the doubling of trains to Gloucester didn't include stops at Cam & Dursley.
Logged
Red Squirrel
Administrator
Hero Member
*****
Posts: 5527


There are some who call me... Tim


View Profile
« Reply #173 on: June 19, 2023, 00:10:03 »

My understanding is that there is capacity for a call at Cam & Dursley, but that this capacity will be needed when Charfield opens. It is considered better not to provide Cam & Dursley with a 2tph service which would then have to revert to hourly when trains begin stopping at Charfield.
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
froome
Transport Scholar
Hero Member
******
Posts: 1011


View Profile Email
« Reply #174 on: June 19, 2023, 11:08:10 »

My understanding is that there is capacity for a call at Cam & Dursley, but that this capacity will be needed when Charfield opens. It is considered better not to provide Cam & Dursley with a 2tph service which would then have to revert to hourly when trains begin stopping at Charfield.

Do we know if that will mean that no trains will stop at both Cam & Dursley and Charfield, or whether every other train will stop at both and other trains stop at neither?

What then happens if a new station opens at Stonehouse on the main line? Or is that just too far in the future to be considering?

I do find it surprising if there is a capacity issue. The only competing passenger services are the inter-city half hourly services, and perhaps naively, I would assume the stopping services could just slot in a few minutes behind these.
Logged
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #175 on: June 19, 2023, 14:50:01 »

I didn't think Charfield was anything more than a vague "would be nice". I know an application for planning permission was made but are there solid plans, architectural drawings, contracts with engineers, etc, behind it?
Logged

Waiting at Pilning for the midnight sleeper to Prague.
Red Squirrel
Administrator
Hero Member
*****
Posts: 5527


There are some who call me... Tim


View Profile
« Reply #176 on: June 19, 2023, 16:23:10 »

Charfield Station got planning approval in March 2023 (South Glos P22/05778/R3F). So it does indeed have a full set of architectural drawings.

In terms of its prospects, I'd say it was about par with Portishead.

See https://sites.southglos.gov.uk/newsroom/transport/charfield-station-plans-approved/
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #177 on: June 19, 2023, 20:55:32 »

That makes it a shame if it's the reason more trains aren't calling at Cam & Dursley.
Logged

Waiting at Pilning for the midnight sleeper to Prague.
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 10 11 [12]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page