Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 15:35 03 May 2024
* Around the world cruise staff member missing at sea
- Russian forces sharing base with US troops in Niger
- Train strikes: How May's disruption affects you
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/05/24 - BRTA Westbury
22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber

On this day
3rd May (1954)
Lochluichart new station opens (link)

Train RunningCancelled
14:45 Bristol Temple Meads to Westbury
16:19 Carmarthen to London Paddington
Short Run
10:59 Cardiff Central to Penzance
13:23 Portsmouth Harbour to Cardiff Central
14:23 Portsmouth Harbour to Cardiff Central
15:23 Portsmouth Harbour to Cardiff Central
15:59 Westbury to Gloucester
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 03, 2024, 15:39:11 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[197] Severn Tunnel emergency closure, 2nd May 2024.
[99] June to December 2024 Timetables
[71] Vintage film - how valid are these issues today?
[56] 2024 Delays and Cancellations - North Cotswold Line
[49] Reopening Cullompton and Wellington stations (merged topic)
[36] underground plans for Bristol update.
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 14 15 [16] 17 18 ... 43
  Print  
Author Topic: Chiltern Evergreen 3 project - ongoing discussion  (Read 353285 times)
IndustryInsider
Data Manager
Hero Member
******
Posts: 10125


View Profile
« Reply #225 on: May 22, 2013, 11:12:49 »

No, I did mean up platform - passively provisioned to destroy the concourse, yes.

Fair enough.  I can't see that happening though.  Would cost far too much, and cause a huge amount of disruption, for far too small a benefit.  My money would be on a final layout similar to that in the diagrams without the dotted line part.  I've been wrong before though, so time will tell...  Wink
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 12368


View Profile Email
« Reply #226 on: May 22, 2013, 11:21:33 »

Let's wait & see the redesign for the station?....that will give some better idea on the likelihood.
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4453


View Profile
« Reply #227 on: May 22, 2013, 19:11:40 »

No, I did mean up platform - passively provisioned to destroy the concourse, yes.

Fair enough.  I can't see that happening though.  Would cost far too much, and cause a huge amount of disruption, for far too small a benefit.  My money would be on a final layout similar to that in the diagrams without the dotted line part.  I've been wrong before though, so time will tell...  Wink

It would probably mean constructing a new station building in front of the present one with an extended bridge to what would be the island platforms then demolishing the existing building to finish the dotted platform.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12368


View Profile Email
« Reply #228 on: May 23, 2013, 11:33:21 »

Notes from a meeting the CLPG» (Cotswold Line Promotion Group - about) had with FGW (First Great Western) recently indicates that they seem to be on the same wavelength -

Quote
- Oxford station. Ideas are still developing, but the ultimate concept is for two island platforms to facilitate through working. In the down [direction] the YHA would have to go, and down trains would use the down [goods] loop which will be upgraded. Freight will go through the middle roads. The upside is more problematic,and will need the existing station structure to be removed. Botley Road bridge is to be rebuilt and the road layout under and around it improved.

I had a brief meeting with Oxford station management last night - it seems as though the current date for the demise of Oxford signalbox (and thuis I guess completion of the resignalling) - April 2015. Could the station be redesigned & built by then?....
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10125


View Profile
« Reply #229 on: May 23, 2013, 11:47:20 »

I had a brief meeting with Oxford station management last night - it seems as though the current date for the demise of Oxford signalbox (and thuis I guess completion of the resignalling) - April 2015. Could the station be redesigned & built by then?....

That would be the likely date when (the serious) work will start not be finished, surely?  As with Reading station, the decommissioning of the panel box allows the land it currently occupies to be used for the down platform loop and the flexibility afforded by the new TVSC» (Thames Valley Signalling Centre - about) at Didcot makes it a lot easier to provide any temporary signalling and track layouts that might be needed in stages before the full rebuilt layout is finished.

In the meantime work could start on areas such as the carriage sidings where the land is available and it won't affect existing signalling much?

Although on a smaller scale, the similarities to Reading are striking; signal box closes; Didcot takes over signalling; land used for platforms; bridges at both ends of station widened; new track north and south of station.  All resulting in a much more flexible station layout and more platforms.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 12368


View Profile Email
« Reply #230 on: May 23, 2013, 11:58:48 »

Yes, I think you are right....that puts the work firmly in the next CP period. And why Oxford won't be ready for Chiltern until April 2016....
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10125


View Profile
« Reply #231 on: May 23, 2013, 13:07:31 »

Just in time for the GWML (Great Western Main Line) electrification as well.  Timescales will be very tight though...  Shocked
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #232 on: May 28, 2013, 18:25:31 »

Thinking back to the judicial review process, do the judgements ever get reported, or made available online?  I've tried a bit of Googling, but there doesn't seem an obvious place to find the details, only reports that it happened IYSWIM...

Paul 
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4453


View Profile
« Reply #233 on: May 28, 2013, 18:30:05 »

Try searching on http://www.bailii.org/

Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #234 on: May 28, 2013, 19:05:00 »

Try searching on http://www.bailii.org/

Thanks for the tip but there's nothing coming up with obvious searches.

Paul
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12368


View Profile Email
« Reply #235 on: June 05, 2013, 11:33:29 »

It should appear (not present at time of writing this though) on this page in the May 2013 section. Decision Date was 17/05/2013 and the case number you are looking for is [2013] EWHC 1238.

Cases 1237 & 1239 are there already, not sure why this one is still missing.

However, I think there's something attached to this post that you might be interested in  Grin Grin
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #236 on: June 05, 2013, 12:18:39 »

Interesting read - all about emissions, but then of course so much of the presumed pollution problem will be altered completely with the decision to electrify the whole area during the early years of operations...

Paul
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10125


View Profile
« Reply #237 on: June 05, 2013, 15:35:21 »

An interesting document.  Point number 58 is my favourite.  Tongue
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #238 on: June 05, 2013, 16:17:10 »

Nice and succinct.

Just a shame it doesn't then show...

59.  Banned.
« Last Edit: June 05, 2013, 16:29:58 by paul7755 » Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #239 on: July 24, 2013, 11:51:11 »

Latest Track Access application from Chiltern is now online, confirming the staged opening mentioned by ChrisB in an earlier post #205:

Quote
In line with the amended project programme it is now envisaged that the first stage of passenger services will be triggered by the completion of the infrastructure upgrade between Bicester and the proposed new station at Water Eaton Parkway: this is expected in Summer 2015. The second stage is the extension of those services to Oxford in Spring 2016; once the required infrastructure is commissioned.

http://www.networkrail.co.uk/browseDirectory.aspx?root=&dir=%5cTrack%20Access%5c1%20Current%20Consultations%5c2013.07.12%20Chiltern%20101%20SA%20-%20Closing%20date%2026%20July%202013
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 14 15 [16] 17 18 ... 43
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page