There was no problem with the rail. There was 10 53 seater coaches on Standby, I was one of them. Every 9 car IeT cleared the queue. 1000 or so people queuing with all their camping kit made the queue look huge.
Bodmin parkway is a no go for road transport in general. Of the 10 coaches on standby yesterday, only 1 of them would fit under the low bridge. PSVAR coaches are typically taller than their non PSVAR cousins. I had a Mk2▸ Scania Levante (ex national express) and it was marked 12’9. Par is not the best place due to lack of off Road space for coaches to park so we’d end up blocking the road.
Had we been used GWR▸ had suggested they’d send us to Tiverton or Exeter to spread the load and give the options of Paignton and Exeter originating trains
Nice to hear a report from someone actually 'on the ground'.
Cornwall live have posted loads of **** all week.
I’ve been on the ground in the bus operations the entire festival.
Queues for shuttle buses reported bad… we had a 85 or 105 seat double decker running every 60-90 seconds. We were loading and going. It would be impossible to go any more frequent. Most of the time we were loading two buses at a time. The main bus stop in use in town can only physically fit two buses at once. We had buses queued up 30 seconds away ready to pounce as soon as a space on the stop became available